|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 7/17/2023 Measured TD: 19430 ft. Vertical TD: 7811 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 7/17/2023 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 9/5/2025 | | Proposed Top PZ Location: | Sec:35 Twp: 1S 66W | Footage: 2510 FSL 693 FEL | | Bottom Hole Location: | Sec:34 Twp: 1S 66W | Footage: 2478 FSL 301 FWL | | Proposed Depth/Form: | 19428 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CLCDFH, Formation: CARLILE-CODELL-FORT HAYS , Order: 407-3459 , Unit Acreage: 2560, Drill Unit: T1S R66W: Sec 26, 27 | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1621 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 550, Top: 0 ft., Bottom: 1621 ft. | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 19428 ft., Weight: 20 , Citings Type: PLANNED | | Cement: | Sacks: 2612, Top: , Bottom: 19428 ft. |
| | |
| Wellbore Completed | | Completion Date: | 12/13/2022 | | Spud Date: | 7/17/2018 | Spud Date Is: | ACTUAL | | Measured TD: | 19430 ft. | Measured PB depth: | 19430 ft. | | True Vertical TD: | 7811 ft. | True Vertical PB depth: | 7811 ft. | | Top PZ Location: | Sec:35 Twp: 1S 66W | Footage: 2510 FSL 693 FEL | | Bottom Hole Location: | Sec:34 Twp: 1S 66W | Footage: 2478 FSL 301 FWL | | Log Types: | NO LOGS RAN | | Log Types: | CBL, MWD/LWD, (Resistivity on 001-10027). | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 114 ft., Weight: 53 , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 114 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1621 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 550, Top: 0 ft., Bottom: 1621 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 19430 ft., Weight: 20 , Citings Type: ACTUAL | | Cement: | Sacks: 3020, Top: 0 ft., Bottom: 19430 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 5249 ft. | | N | N | | SUSSEX | 5793 ft. | | N | N | | SHANNON | 6593 ft. | | N | N | | SHARON SPRINGS | 8610 ft. | | N | N | | NIOBRARA | 8634 ft. | | N | N | | FORT HAYS | 9187 ft. | | | | | CODELL | 9279 ft. | | | | | CARLILE | 10984 ft. | | | |
Formation FTHYS Formation Classification: OW Status: CM - 8/14/2024 Interval Top: 11228 ft. Interval Bottom: 11378 ft.| Completed Information for Formation FORT HAYS | | 1st Production Date: | 7/8/2023 | Choke Size: | | | Formation Name: | FORT HAYS | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation FTHYS. |
| | Perforation Data: | | Interval Top: | 11228 ft. | # Of Holes: | 44 | | Interval Bottom: | 11378 ft. | Hole Size: | 0.36 in. |
|
Formation CARL Formation Classification: OW Status: CM - 8/14/2024 Interval Top: 10993 ft. Interval Bottom: 16344 ft.| Completed Information for Formation CARLILE | | 1st Production Date: | 7/8/2023 | Choke Size: | | | Formation Name: | CARLILE | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 4/20/2023 | Treatment End Date: | 5/1/2023 | | Treatment Summary: | Carlile Perforated Intervals: 10993'-10994'; 11583'-12081'; 12658'-13077'; 13251'-13547'; 16259'-16344'. | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CARL. |
| | Perforation Data: | | Interval Top: | 10993 ft. | # Of Holes: | 403 | | Interval Bottom: | 16344 ft. | Hole Size: | 0.36 in. |
|
Formation CLCDFH Formation Classification: OW Status: PR - 1/1/2025 Interval Top: 9847 ft. Interval Bottom: 19363 ft.| Completed Information for Formation CARLILE-CODELL-FORT HAYS | | 1st Production Date: | 7/8/2023 | Choke Size: | | | Formation Name: | CARLILE-CODELL-FORT HAYS | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 4/20/2023 | Treatment End Date: | 5/1/2023 | | Treatment Summary: | Frac'd Carlile-Codell-Fort Hays with 50 stage plug and perf:
9006239 total lbs proppant pumped: 3375369 lbs 40/70 mesh and 5630870 lbs 100 mesh;
256428 total bbls fluid pumped: 234947 bbls gelled fluid, 21207 bbls fresh water, and 274 bbls 15% HCl acid. | | Total fluid used in treatment (bbls): | 256428 | Max pressure during treatment (psi): | 9059 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 50 | | Total acid used in treatment (bbls): | 274 | Min frac gradient (psi/ft): | 0.82 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 0 | | Fresh water used in treatment (bbls): | 21207 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 9006239 | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 9107 ft. | | Tubing Packer Depth: | 9105 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/17/2023 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 462 | | BBLS_OIL | 452 | | BTU_GAS | 1300 | | CALC_BBLS_H2O | 462 | | CALC_BBLS_OIL | 452 | | CALC_GOR | 540 | | CALC_MCF_GAS | 244 | | CASING_PRESS | 483 | | GRAVITY_OIL | 40 | | MCF_GAS | 244 | | TUBING_PRESS | 1428 |
| | Perforation Data: | | Interval Top: | 9847 ft. | # Of Holes: | 2738 | | Interval Bottom: | 19363 ft. | Hole Size: | 0.36 in. |
|
Formation CODL Formation Classification: OW Status: CM - 8/14/2024 Interval Top: 9847 ft. Interval Bottom: 19363 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 7/8/2023 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 4/20/2023 | Treatment End Date: | 5/1/2023 | | Treatment Summary: | Codell Perforated Intervals: 9847'-10973'; 11007'-11227'; 11387'-11570'; 12094'-12645'; 13086'-13237'; 13560'-16246'; 16363'-19363'. | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 9847 ft. | # Of Holes: | 2291 | | Interval Bottom: | 19363 ft. | Hole Size: | 0.36 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 20444 |
| Total Gas Produced (MCF) | 22619 |
| GOR | 1106 |
| GOR Determination | BOE |
| Average BOE per Day | 67.031 |
| Average MCFE per Day | 388.795 |
| Federal Financial Assurance | i | |
|
|