Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-10020
Well Classification: OW Status: PR - 5/1/2025
Well Name/No:ALMA 1S-66-2524 #19NH
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/1/2025
FacilityID:449936LocationID:449925
County:ADAMS #001Location:SWSE 25 1S66W 6
Field:WATTENBERG - #90750Elevation:5173 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:237FSL  2009 FELLat/Long: 39.929500 / -104.721750Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.929498 / -104.721750Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/27/2018
End Date: 3/5/2018
Reported: 3/19/2018
Days to report: 14
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 5/1/2025             Measured TD: 15915 ft.    Vertical TD: 7507 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 5/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:4/5/2019
Proposed Top PZ Location:Sec:25 Twp: 1S 66W Footage: 93 FSL  485 FWL
Bottom Hole Location:Sec:24 Twp: 1S 66W Footage: 2135 FSL  455 FWL
Proposed Depth/Form:16301 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 560, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 15891 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2097, Top: 1500 ft., Bottom: 15891 ft.

Wellbore Completed
Completion Date:11/18/2017
Spud Date:11/13/2017Spud Date Is:ACTUAL
Measured TD:15915 ft.Measured PB depth:15894 ft.
True Vertical TD:7507 ft.True Vertical PB depth:7507 ft.
Top PZ Location:Sec:25 Twp: 1S 66WFootage: 93 FSL  485 FWL
Bottom Hole Location:Sec:24 Twp: 1S 66WFootage: 2135 FSL  455 FWL
Log Types:Mud, MWD/LWD, CBL, (Triple Combo on 001-10027).
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1662 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 575, Top: 0 ft., Bottom: 1662 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 15894 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2600, Top: 130 ft., Bottom: 15894 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3770 ft.NN
SUSSEX4572 ft.NN
SHANNON5622 ft.NN
SHARON SPRINGS8078 ft.NN
NIOBRARA8128 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 5/1/2025                  Interval Top: 8595 ft.    Interval Bottom: 15793 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:4/4/2018Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/27/2018Treatment End Date:3/5/2018
Treatment Summary:Frac'd Niobrara with 49-stage plug-and-perf; 14700670 total lbs proppant pumped: 7347080 lbs 40/70 mesh sand and 7353590 lbs 30/50 mesh sand; 15337 total bbls fluid pumped: 14991 bbls fresh water and 346 bbls 15% HCL acid.
Total fluid used in treatment (bbls):15337Max pressure during treatment (psi):8406
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:49
Total acid used in treatment (bbls):346Min frac gradient (psi/ft):0.89
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):11081
Fresh water used in treatment (bbls):14991Disposition method For flowback:DISPOSAL
Total proppant used (lbs):14700670Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8417 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/26/2018Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 406
BBLS_OIL 381
BTU_GAS 1340
CALC_BBLS_H2O 406
CALC_BBLS_OIL 381
CALC_GOR 1270
CALC_MCF_GAS 484
GRAVITY_OIL 41
MCF_GAS 484
TUBING_PRESS 577
Perforation Data:
Interval Top:8595 ft.# Of Holes:1765
Interval Bottom:15793 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)1750
Total Gas Produced (MCF)10232
GOR5846
GOR DeterminationBOE
Average BOE per Day9.575
Average MCFE per Day55.526

 Federal Financial Assurance  i 

 Tribal Well  i No