Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-10016
Well Classification: OW Status: PR - 5/17/2025
Well Name/No:ALMA WEST #35W-20-10
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/17/2025
FacilityID:449932LocationID:449925
County:ADAMS #001Location:SWSE 25 1S66W 6
Field:WATTENBERG - #90750Elevation:5176 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:237FSL  1981 FELLat/Long: 39.929500 / -104.721650Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/2/2025
End Date: 4/9/2025
Reported: 5/16/2025
Days to report: 37
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification:              Status: PR - 5/17/2025             Measured TD:

 Wellbore Data for Original WellboreWellbore Classification:         PR - 5/17/2025
Wellbore PermitHORIZONTAL
Permit #:Expiration Date:9/5/2025
Proposed Top PZ Location:Sec:35 Twp: 1S 66W Footage: 1848 FNL  300 FEL
Bottom Hole Location:Sec:34 Twp: 1S 66W Footage: 1848 FNL  300 FWL
Proposed Depth/Form:20095 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-3306 , Unit Acreage: 2560, Drill Unit: T1S R66W: Sec 26, 27
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18648 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2499, Top: , Bottom: 18648 ft.

Wellbore Completed
Completion Date:N/A
Spud Date:2/24/2025Spud Date Is:NOTICE
Measured TD:Measured PB depth:
True Vertical TD:True Vertical PB depth:
Top PZ Location:Sec:35 Twp: 1S 66WFootage: 1848 FNL  300 FEL

Formation NBRR                     Formation Classification:  OW                     Status:  WO - 2/1/2026                  Interval Top: 8896 ft.    Interval Bottom: 18659 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:4/30/2025Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:4/2/2025Treatment End Date:4/9/2025
Treatment Summary:Niobrara Frac'd with 56 stage plug and perf: 13073713 total pounds proppant pumped: 13073713 pounds 100 mesh; 468229 total bbls fluid pumped: 445267 bbls gelled fluid; 22297 bbls fresh water and 665 bbls 15% HCl Acid.
Total fluid used in treatment (bbls):468229Max pressure during treatment (psi):9246
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:56
Total acid used in treatment (bbls):665Min frac gradient (psi/ft):0.89
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):22297Disposition method For flowback:DISPOSAL
Total proppant used (lbs):13073713Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8494 ft.
Tubing Packer Depth:8493 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/17/2025Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 967
BBLS_OIL 458
BTU_GAS 1300
CALC_BBLS_H2O 967
CALC_BBLS_OIL 458
CALC_GOR 991
CALC_MCF_GAS 454
CASING_PRESS 484
GRAVITY_OIL 41
MCF_GAS 454
TUBING_PRESS 926
Perforation Data:
Interval Top:8896 ft.# Of Holes:3133
Interval Bottom:18659 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)105730
Total Gas Produced (MCF)152630
GOR1443
GOR DeterminationBOE
Average BOE per Day359.367
Average MCFE per Day2084.334

 Federal Financial Assurance  i 

 Tribal Well  i No