Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-10014
Well Classification: OW Status: PR - 5/1/2025
Well Name/No:ALMA WEST #26W-20-02
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/1/2025
FacilityID:449930LocationID:449925
County:ADAMS #001Location:SWSE 25 1S66W 6
Field:WATTENBERG - #90750Elevation:5175 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:387FSL  1954 FELLat/Long: 39.929909 / -104.721550Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.929909 / -104.721550Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/20/2023
End Date: 5/1/2023
Reported: 5/23/2023
Days to report: 22
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 5/1/2025             Measured TD: 19477 ft.    Vertical TD: 7782 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 5/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:9/5/2025
Proposed Top PZ Location:Sec:26 Twp: 1S 66W Footage: 2524 FNL  311 FEL
Bottom Hole Location:Sec:27 Twp: 1S 66W Footage: 2525 FNL  301 FWL
Proposed Depth/Form:19517 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CLCDFH, Formation: CARLILE-CODELL-FORT HAYS , Order: 407-3459 , Unit Acreage: 2560, Drill Unit: T1S R66W: Sec 26, 27
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1590 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 550, Top: 0 ft., Bottom: 1590 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 19517 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2625, Top: , Bottom: 19517 ft.

Wellbore Completed
Completion Date:12/23/2022
Spud Date:7/13/2018Spud Date Is:ACTUAL
Measured TD:19477 ft.Measured PB depth:19471 ft.
True Vertical TD:7782 ft.True Vertical PB depth:7782 ft.
Top PZ Location:Sec:26 Twp: 1S 66WFootage: 2524 FNL  311 FEL
Bottom Hole Location:Sec:27 Twp: 1S 66WFootage: 2525 FNL  301 FWL
Log Types:NO LOGS RAN
Log Types:CBL, MWD/LWD, (Resistivity on 001-10027).
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 114 ft., Weight: 53 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 114 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1590 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 550, Top: 0 ft., Bottom: 1590 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 19471 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 3035, Top: 0 ft., Bottom: 19471 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN5154 ft.NN
SUSSEX5695 ft.NN
SHANNON6498 ft.NN
SHARON SPRINGS8642 ft.NN
NIOBRARA8666 ft.NN
FORT HAYS9348 ft.
CODELL9443 ft.
CARLILE13074 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 8/14/2024                 Interval Top: 13077 ft.    Interval Bottom: 15059 ft.

 Completed Information for Formation CARLILE
1st Production Date:7/8/2023Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:4/20/2023Treatment End Date:5/1/2023
Treatment Summary:Carlile Perforated Intervals: 13077'-13135'; 14925'-15059'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:13077 ft.# Of Holes:61
Interval Bottom:15059 ft.Hole Size:0.36 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 8/14/2024                 Interval Top: 12608 ft.    Interval Bottom: 19022 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:7/8/2023Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:4/20/2023Treatment End Date:5/1/2023
Treatment Summary:Fort Hays Perforated Intervals: 12608'-12747'; 14254'-14544'; 15446'-15658'; 18274'-18367'; 18937'-19022'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:12608 ft.# Of Holes:374
Interval Bottom:19022 ft.Hole Size:0.36 in.

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 5/1/2025                  Interval Top: 9520 ft.    Interval Bottom: 19407 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:7/8/2023Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:4/20/2023Treatment End Date:5/1/2023
Treatment Summary:Frac'd Carlile-Codell-Fort Hays with 54 stage plug and perf: 9936771 total lbs proppant pumped: 2241413 lbs 40/70 mesh and 7695358 pounds 100 mesh; 275582 total bbls fluid pumped: 248466 bbls gelled fluid, 27092 bbls fresh water, and 24 bbls 15% HCl acid.
Total fluid used in treatment (bbls):275582Max pressure during treatment (psi):8572
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:54
Total acid used in treatment (bbls):24Min frac gradient (psi/ft):0.83
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):27092Disposition method For flowback:DISPOSAL
Total proppant used (lbs):9936771Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:9153 ft.
Tubing Packer Depth:9150 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/17/2023Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 235
BBLS_OIL 260
BTU_GAS 1300
CALC_BBLS_H2O 235
CALC_BBLS_OIL 260
CALC_GOR 2065
CALC_MCF_GAS 537
CASING_PRESS 633
GRAVITY_OIL 40
MCF_GAS 537
TUBING_PRESS 1608
Perforation Data:
Interval Top:9520 ft.# Of Holes:3069
Interval Bottom:19407 ft.Hole Size:0.36 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 8/14/2024                 Interval Top: 9520 ft.    Interval Bottom: 19407 ft.

 Completed Information for Formation CODELL
1st Production Date:7/8/2023Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:4/20/2023Treatment End Date:5/1/2023
Treatment Summary:Codell Perforated Intervals: 9520'-12587'; 12768'-13063'; 13148'-14240'; 14557'-14912'; 15073'-15432'; 15670'-18254'; 18386'-18924'; 19035'-19407'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:9520 ft.# Of Holes:2634
Interval Bottom:19407 ft.Hole Size:0.36 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)23535
Total Gas Produced (MCF)33228
GOR1411
GOR DeterminationBOE
Average BOE per Day80.398
Average MCFE per Day466.281

 Federal Financial Assurance  i 

 Tribal Well  i No