Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-10013
Well Classification: OW Status: PR - 7/17/2023
Well Name/No:ALMA WEST #35W-20-06
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/17/2023
FacilityID:449929LocationID:449925
County:ADAMS #001Location:SWSE 25 1S66W 6
Field:WATTENBERG - #90750Elevation:5175 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:387FSL  1926 FELLat/Long: 39.929910 / -104.721449Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.929910 / -104.721449Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/2/2023
End Date: 5/14/2023
Reported: 5/23/2023
Days to report: 9
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 7/17/2023             Measured TD: 20561 ft.    Vertical TD: 7814 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 7/17/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:9/5/2025
Proposed Top PZ Location:Sec:35 Twp: 1S 66W Footage: 659 FSL  300 FEL
Bottom Hole Location:Sec:34 Twp: 1S 66W Footage: 662 FSL  300 FWL
Proposed Depth/Form:20641 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CD-CRL, Formation: CODELL-CARLILE , Order: 407-3459 , Unit Acreage: 2560, Drill Unit: T1S R66W: Sec 26, 27
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1584 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 550, Top: 0 ft., Bottom: 1584 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 20641 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2789, Top: , Bottom: 20641 ft.

Wellbore Completed
Completion Date:12/28/2022
Spud Date:7/13/2018Spud Date Is:ACTUAL
Measured TD:20561 ft.Measured PB depth:20561 ft.
True Vertical TD:7814 ft.True Vertical PB depth:7814 ft.
Top PZ Location:Sec:35 Twp: 1S 66WFootage: 710 FSL  321 FEL
Bottom Hole Location:Sec:34 Twp: 1S 66WFootage: 692 FSL  301 FWL
Log Types:NO LOGS RAN
Log Types:CBL, MWD/LWD, (Resistivity on 001-10027).
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 114 ft., Weight: 53 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 114 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1588 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 550, Top: 0 ft., Bottom: 1588 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 20561 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 3175, Top: 0 ft., Bottom: 20561 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN5524 ft.NN
SUSSEX6186 ft.NN
SHANNON7184 ft.NN
SHARON SPRINGS9678 ft.NN
NIOBRARA9711 ft.NN
FORT HAYS10466 ft.
CODELL10590 ft.
CARLILE17196 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 8/14/2024                 Interval Top: 17196 ft.    Interval Bottom: 17255 ft.

 Completed Information for Formation CARLILE
1st Production Date:7/8/2023Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:5/2/2023Treatment End Date:5/14/2023
Treatment Summary:
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:17196 ft.# Of Holes:12
Interval Bottom:17255 ft.Hole Size:0.36 in.

Formation CD-CRL                 Formation Classification:  OW                 Status:  PR - 7/17/2023                 Interval Top: 10602 ft.    Interval Bottom: 20455 ft.

 Completed Information for Formation CODELL-CARLILE
1st Production Date:7/8/2023Choke Size: 
Formation Name:CODELL-CARLILECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:5/2/2023Treatment End Date:5/14/2023
Treatment Summary:Frac'd Codell-Carlile with 54 stage plug and perf: 9849161 total lbs proppant pumped: 7491238 lbs 40/70 mesh and 2357923 lbs 100 mesh; 282577 total bbls fluid pumped: 249512 bbls gelled fluid, 33017 bbls fresh water, and 48 bbls 15% HCl acid.
Total fluid used in treatment (bbls):282577Max pressure during treatment (psi):8676
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:54
Total acid used in treatment (bbls):48Min frac gradient (psi/ft):0.86
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):33017Disposition method For flowback:DISPOSAL
Total proppant used (lbs):9849161Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:10438 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/17/2023Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 402
BBLS_OIL 328
BTU_GAS 1300
CALC_BBLS_H2O 402
CALC_BBLS_OIL 328
CALC_GOR 988
CALC_MCF_GAS 324
CASING_PRESS 1607
GRAVITY_OIL 40
MCF_GAS 324
TUBING_PRESS 1467
Perforation Data:
Interval Top:10602 ft.# Of Holes:3314
Interval Bottom:20455 ft.Hole Size:0.36 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 8/14/2024                 Interval Top: 10602 ft.    Interval Bottom: 20455 ft.

 Completed Information for Formation CODELL
1st Production Date:7/8/2023Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:5/2/2023Treatment End Date:5/14/2023
Treatment Summary:Codell Perforated Intervals: 10602'-17195'; 17226'-20455'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:10602 ft.# Of Holes:3302
Interval Bottom:20455 ft.Hole Size:0.36 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)19341
Total Gas Produced (MCF)31831
GOR1645
GOR DeterminationBOE
Average BOE per Day68.107
Average MCFE per Day395.023

 Federal Financial Assurance  i 

 Tribal Well  i No