Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-09950
Well Classification: OW Status: PR - 5/1/2025
Well Name/No:Rio LC #12-242HC
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/1/2025
FacilityID:446021LocationID:320491
County:ADAMS #001Location:NWNW 6 1S67W 6
Field:WATTENBERG - #90750Elevation:5070 ft.
Planned Location:413FNL  156 FWLLat/Long: 39.999207 / -104.939777Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.999207 / -104.939777Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 10/2/2019
End Date: 10/14/2019
Reported: 10/31/2019
Days to report: 17
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 5/1/2025             Measured TD: 13515 ft.    Vertical TD: 7929 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 5/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:6/6/2021
Proposed Top PZ Location:Sec:1 Twp: 1S 68W Footage: 543 FNL  545 FEL
Bottom Hole Location:Sec:12 Twp: 1S 68W Footage: 630 FNL  519 FEL
Proposed Depth/Form:13555 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-2483 , Unit Acreage: 1280, Drill Unit: Sec. 1 & 12 ALL
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1700 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 707, Top: 0 ft., Bottom: 1700 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 13555 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1201, Top: , Bottom: 13555 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7114 ft., Depth: 12523 ft., Weight: 13.5 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:8/1/2019
Spud Date:6/28/2019Spud Date Is:ACTUAL
Measured TD:13515 ft.Measured PB depth:13506 ft.
True Vertical TD:7929 ft.True Vertical PB depth:7928 ft.
Top PZ Location:Sec:1 Twp: 1S 68WFootage: 543 FNL  545 FEL
Bottom Hole Location:Sec:12 Twp: 1S 68WFootage: 630 FNL  519 FEL
Log Types:CBL, Mud Log, MWD/LWD, Composite
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1766 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 800, Top: 0 ft., Bottom: 1766 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 13515 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1760, Top: 3740 ft., Bottom: 13515 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4442 ft.4596 ft.NN
SUSSEX4808 ft.4982 ft.NN
SHANNON5418 ft.5496 ft.NN
SHARON SPRINGS7564 ft.NN
NIOBRARA7585 ft.NN
FORT HAYS8220 ft.NN
CODELL8307 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 7/29/2020                 Interval Top: 12527 ft.    Interval Bottom: 13229 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:11/10/2019Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:7/29/2020Treatment End Date:N/A
Treatment Summary:Niobrara perforation interval: 12527'-13229'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:12527 ft.# Of Holes:750
Interval Bottom:13229 ft.Hole Size:0.38 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 7/29/2020                 Interval Top: 8912 ft.    Interval Bottom: 9965 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:11/10/2019Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:7/29/2020Treatment End Date:N/A
Treatment Summary:Fort Hays perforation interval: 8912'-9965'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8912 ft.# Of Holes:750
Interval Bottom:9965 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 7/29/2020                 Interval Top: 8337 ft.    Interval Bottom: 12526 ft.

 Completed Information for Formation CODELL
1st Production Date:11/10/2019Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:7/29/2020Treatment End Date:N/A
Treatment Summary:Codell perforation intervals: 8337'-8911', 9966'-12526'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8337 ft.# Of Holes:750
Interval Bottom:12526 ft.Hole Size:0.38 in.

Formation NBFHC                   Formation Classification:  OW                   Status:  PR - 5/1/2025                  Interval Top: 8337 ft.    Interval Bottom: 13229 ft.

 Completed Information for Formation NIOBRARA-FT HAYS-CODELL
1st Production Date:11/10/2019Choke Size: 
Formation Name:NIOBRARA-FT HAYS-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/2/2019Treatment End Date:10/14/2019
Treatment Summary:24 bbls 15% HCL Acid; 256,860# 100 Mesh Sand; 4,743,107# 20/40 Sand; 87,171 bbls gelled fluid; Flowback determined from well test separator.
Total fluid used in treatment (bbls):87195Max pressure during treatment (psi):4143
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:25
Total acid used in treatment (bbls):24Min frac gradient (psi/ft):0.87
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):24791
Fresh water used in treatment (bbls):87171Disposition method For flowback:DISPOSAL
Total proppant used (lbs):4999967Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8124 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/14/2019Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 849
BBLS_OIL 652
BTU_GAS 1387
CALC_BBLS_H2O 849
CALC_BBLS_OIL 652
CALC_GOR 1640
CALC_MCF_GAS 1069
CASING_PRESS 2163
GRAVITY_OIL 45
MCF_GAS 1069
TUBING_PRESS 1631
Perforation Data:
Interval Top:8337 ft.# Of Holes:750
Interval Bottom:13229 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)1826
Total Gas Produced (MCF)32821
GOR17974
GOR DeterminationMCFE
Average BOE per Day20.324
Average MCFE per Day117.879

 Federal Financial Assurance  i 

 Tribal Well  i No