Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-09950
Well Classification: OW Status: PR - 5/1/2025
Well Name/No:Rio LC #12-242HC
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/1/2025
FacilityID:446021LocationID:320491
County:ADAMS #001Location:NWNW 6 1S67W 6
Field:WATTENBERG - #90750Elevation:5070 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:413FNL  156 FWLLat/Long: 39.999207 / -104.939777Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.999207 / -104.939777Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 10/2/2019
End Date: 10/14/2019
Reported: 10/31/2019
Days to report: 17
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 5/1/2025             Measured TD: 13515 ft.    Vertical TD: 7929 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 5/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:6/6/2021
Proposed Top PZ Location:Sec:1 Twp: 1S 68W Footage: 543 FNL  545 FEL
Bottom Hole Location:Sec:12 Twp: 1S 68W Footage: 630 FNL  519 FEL
Proposed Depth/Form:13555 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-2483 , Unit Acreage: 1280, Drill Unit: Sec. 1 & 12 ALL
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1700 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 707, Top: 0 ft., Bottom: 1700 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 13555 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1201, Top: , Bottom: 13555 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7114 ft., Depth: 12523 ft., Weight: 13.5 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:8/1/2019
Spud Date:6/28/2019Spud Date Is:ACTUAL
Measured TD:13515 ft.Measured PB depth:13506 ft.
True Vertical TD:7929 ft.True Vertical PB depth:7928 ft.
Top PZ Location:Sec:1 Twp: 1S 68WFootage: 543 FNL  545 FEL
Bottom Hole Location:Sec:12 Twp: 1S 68WFootage: 630 FNL  519 FEL
Log Types:CBL, Mud Log, MWD/LWD, Composite
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1766 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 800, Top: 0 ft., Bottom: 1766 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 13515 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1760, Top: 3740 ft., Bottom: 13515 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4442 ft.4596 ft.NN
SUSSEX4808 ft.4982 ft.NN
SHANNON5418 ft.5496 ft.NN
SHARON SPRINGS7564 ft.NN
NIOBRARA7585 ft.NN
FORT HAYS8220 ft.NN
CODELL8307 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 7/29/2020                 Interval Top: 12527 ft.    Interval Bottom: 13229 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:11/10/2019Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:7/29/2020Treatment End Date:N/A
Treatment Summary:Niobrara perforation interval: 12527'-13229'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:12527 ft.# Of Holes:750
Interval Bottom:13229 ft.Hole Size:0.38 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 7/29/2020                 Interval Top: 8912 ft.    Interval Bottom: 9965 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:11/10/2019Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:7/29/2020Treatment End Date:N/A
Treatment Summary:Fort Hays perforation interval: 8912'-9965'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8912 ft.# Of Holes:750
Interval Bottom:9965 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 7/29/2020                 Interval Top: 8337 ft.    Interval Bottom: 12526 ft.

 Completed Information for Formation CODELL
1st Production Date:11/10/2019Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:7/29/2020Treatment End Date:N/A
Treatment Summary:Codell perforation intervals: 8337'-8911', 9966'-12526'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8337 ft.# Of Holes:750
Interval Bottom:12526 ft.Hole Size:0.38 in.

Formation NBFHC                   Formation Classification:  OW                   Status:  PR - 5/1/2025                  Interval Top: 8337 ft.    Interval Bottom: 13229 ft.

 Completed Information for Formation NIOBRARA-FT HAYS-CODELL
1st Production Date:11/10/2019Choke Size: 
Formation Name:NIOBRARA-FT HAYS-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/2/2019Treatment End Date:10/14/2019
Treatment Summary:24 bbls 15% HCL Acid; 256,860# 100 Mesh Sand; 4,743,107# 20/40 Sand; 87,171 bbls gelled fluid; Flowback determined from well test separator.
Total fluid used in treatment (bbls):87195Max pressure during treatment (psi):4143
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:25
Total acid used in treatment (bbls):24Min frac gradient (psi/ft):0.87
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):24791
Fresh water used in treatment (bbls):87171Disposition method For flowback:DISPOSAL
Total proppant used (lbs):4999967Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8124 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/14/2019Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 849
BBLS_OIL 652
BTU_GAS 1387
CALC_BBLS_H2O 849
CALC_BBLS_OIL 652
CALC_GOR 1640
CALC_MCF_GAS 1069
CASING_PRESS 2163
GRAVITY_OIL 45
MCF_GAS 1069
TUBING_PRESS 1631
Perforation Data:
Interval Top:8337 ft.# Of Holes:750
Interval Bottom:13229 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)6896
Total Gas Produced (MCF)84103
GOR12195
GOR DeterminationBOE
Average BOE per Day58.342
Average MCFE per Day338.379

 Federal Financial Assurance  i 

 Tribal Well  i No