Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-09947
Well Classification: OW Status: PR - 5/1/2025
Well Name/No:Rio LC #12-365HC
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/1/2025
FacilityID:446018LocationID:320491
County:ADAMS #001Location:NWNW 6 1S67W 6
Field:WATTENBERG - #90750Elevation:5070 ft.
Planned Location:368FNL  155 FWLLat/Long: 39.999331 / -104.939779Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.999331 / -104.939778Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/25/2019
End Date: 10/14/2019
Reported: 10/31/2019
Days to report: 17
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 5/1/2025             Measured TD: 18081 ft.    Vertical TD: 7917 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 5/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:6/6/2021
Proposed Top PZ Location:Sec:1 Twp: 1S 68W Footage: 460 FNL  1125 FEL
Bottom Hole Location:Sec:12 Twp: 1S 68W Footage: 360 FSL  1140 FEL
Proposed Depth/Form:17968 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-2483 , Unit Acreage: 1280, Drill Unit: Sec. 1 & 12: All
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1700 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 707, Top: 0 ft., Bottom: 1700 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17968 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1806, Top: , Bottom: 17968 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7225 ft., Depth: 12646 ft., Weight: 13.5 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:7/26/2019
Spud Date:7/1/2019Spud Date Is:ACTUAL
Measured TD:18081 ft.Measured PB depth:18072 ft.
True Vertical TD:7917 ft.True Vertical PB depth:7917 ft.
Top PZ Location:Sec:1 Twp: 1S 68WFootage: 566 FNL  1155 FEL
Bottom Hole Location:Sec:12 Twp: 1S 68WFootage: 238 FSL  1137 FEL
Log Types:CBL, Mud Log, MWD/LWD, (Composite in API# 001-09950)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1759 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 800, Top: 0 ft., Bottom: 1759 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18081 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 2491, Top: 2670 ft., Bottom: 18081 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4444 ft.4548 ft.NN
SUSSEX4812 ft.4972 ft.NN
SHANNON5426 ft.5485 ft.NN
SHARON SPRINGS7675 ft.NN
NIOBRARA7692 ft.NN
FORT HAYS8337 ft.NN
CODELL8458 ft.NN
CARLILE10792 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 7/29/2020                 Interval Top: 11946 ft.    Interval Bottom: 12472 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:11/19/2019Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:7/29/2020Treatment End Date:N/A
Treatment Summary:Niobrara Perf Interval: 11946-12472
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:11946 ft.# Of Holes:1410
Interval Bottom:12472 ft.Hole Size:0.38 in.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 7/29/2020                 Interval Top: 10792 ft.    Interval Bottom: 11790 ft.

 Completed Information for Formation CARLILE
1st Production Date:11/19/2019Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:7/29/2020Treatment End Date:N/A
Treatment Summary:Carlile Perf Interval: 10792-11220, 11363-11790
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:10792 ft.# Of Holes:1410
Interval Bottom:11790 ft.Hole Size:0.38 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 7/29/2020                 Interval Top: 9711 ft.    Interval Bottom: 12647 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:11/19/2019Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:7/29/2020Treatment End Date:N/A
Treatment Summary:Fort Hays Perf Interval: 9711-9953, 12473-12647
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:9711 ft.# Of Holes:1410
Interval Bottom:12647 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 7/29/2020                 Interval Top: 8532 ft.    Interval Bottom: 17794 ft.

 Completed Information for Formation CODELL
1st Production Date:11/19/2019Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:7/29/2020Treatment End Date:N/A
Treatment Summary:Codell Perf Interval: 8532-9710, 9954-10791, 11221-11362, 11791-11945, 12648-17794
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8532 ft.# Of Holes:1410
Interval Bottom:17794 ft.Hole Size:0.38 in.

Formation NFCC                     Formation Classification:  OW                     Status:  PR - 5/1/2025                  Interval Top: 8532 ft.    Interval Bottom: 17794 ft.

 Completed Information for Formation NIOBRARA-FORT HAYS-CODELL-CARLILE
1st Production Date:11/19/2019Choke Size: 
Formation Name:NIOBRARA-FORT HAYS-CODELL-CARLILECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/25/2019Treatment End Date:10/14/2019
Treatment Summary:469,976# 100 Mesh Sand; 8,830,915# 20/40 Sand; 165,991 bbls gelled fluid; Flowback determined from well test separator.
Total fluid used in treatment (bbls):165991Max pressure during treatment (psi):4420
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:47
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.83
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):15539
Fresh water used in treatment (bbls):165991Disposition method For flowback:DISPOSAL
Total proppant used (lbs):9300891Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8255 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/21/2019Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 486
BBLS_OIL 566
BTU_GAS 1387
CALC_BBLS_H2O 486
CALC_BBLS_OIL 566
CALC_GOR 2120
CALC_MCF_GAS 1200
CASING_PRESS 2043
GRAVITY_OIL 45
MCF_GAS 1200
TUBING_PRESS 1440
Perforation Data:
Interval Top:8532 ft.# Of Holes:1410
Interval Bottom:17794 ft.Hole Size:0.38 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
05/2024 - 04/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No