Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-09947
Well Classification: OW Status: PR - 5/1/2025
Well Name/No:Rio LC #12-365HC
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/1/2025
FacilityID:446018LocationID:320491
County:ADAMS #001Location:NWNW 6 1S67W 6
Field:WATTENBERG - #90750Elevation:5070 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:368FNL  155 FWLLat/Long: 39.999331 / -104.939779Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.999331 / -104.939778Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/25/2019
End Date: 10/14/2019
Reported: 10/31/2019
Days to report: 17
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 5/1/2025             Measured TD: 18081 ft.    Vertical TD: 7917 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 5/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:6/6/2021
Proposed Top PZ Location:Sec:1 Twp: 1S 68W Footage: 460 FNL  1125 FEL
Bottom Hole Location:Sec:12 Twp: 1S 68W Footage: 360 FSL  1140 FEL
Proposed Depth/Form:17968 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-2483 , Unit Acreage: 1280, Drill Unit: Sec. 1 & 12: All
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1700 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 707, Top: 0 ft., Bottom: 1700 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17968 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1806, Top: , Bottom: 17968 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7225 ft., Depth: 12646 ft., Weight: 13.5 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:7/26/2019
Spud Date:7/1/2019Spud Date Is:ACTUAL
Measured TD:18081 ft.Measured PB depth:18072 ft.
True Vertical TD:7917 ft.True Vertical PB depth:7917 ft.
Top PZ Location:Sec:1 Twp: 1S 68WFootage: 566 FNL  1155 FEL
Bottom Hole Location:Sec:12 Twp: 1S 68WFootage: 238 FSL  1137 FEL
Log Types:CBL, Mud Log, MWD/LWD, (Composite in API# 001-09950)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1759 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 800, Top: 0 ft., Bottom: 1759 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18081 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 2491, Top: 2670 ft., Bottom: 18081 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4444 ft.4548 ft.NN
SUSSEX4812 ft.4972 ft.NN
SHANNON5426 ft.5485 ft.NN
SHARON SPRINGS7675 ft.NN
NIOBRARA7692 ft.NN
FORT HAYS8337 ft.NN
CODELL8458 ft.NN
CARLILE10792 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 7/29/2020                 Interval Top: 11946 ft.    Interval Bottom: 12472 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:11/19/2019Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:7/29/2020Treatment End Date:N/A
Treatment Summary:Niobrara Perf Interval: 11946-12472
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:11946 ft.# Of Holes:1410
Interval Bottom:12472 ft.Hole Size:0.38 in.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 7/29/2020                 Interval Top: 10792 ft.    Interval Bottom: 11790 ft.

 Completed Information for Formation CARLILE
1st Production Date:11/19/2019Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:7/29/2020Treatment End Date:N/A
Treatment Summary:Carlile Perf Interval: 10792-11220, 11363-11790
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:10792 ft.# Of Holes:1410
Interval Bottom:11790 ft.Hole Size:0.38 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 7/29/2020                 Interval Top: 9711 ft.    Interval Bottom: 12647 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:11/19/2019Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:7/29/2020Treatment End Date:N/A
Treatment Summary:Fort Hays Perf Interval: 9711-9953, 12473-12647
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:9711 ft.# Of Holes:1410
Interval Bottom:12647 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 7/29/2020                 Interval Top: 8532 ft.    Interval Bottom: 17794 ft.

 Completed Information for Formation CODELL
1st Production Date:11/19/2019Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:7/29/2020Treatment End Date:N/A
Treatment Summary:Codell Perf Interval: 8532-9710, 9954-10791, 11221-11362, 11791-11945, 12648-17794
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8532 ft.# Of Holes:1410
Interval Bottom:17794 ft.Hole Size:0.38 in.

Formation NFCC                     Formation Classification:  OW                     Status:  PR - 5/1/2025                  Interval Top: 8532 ft.    Interval Bottom: 17794 ft.

 Completed Information for Formation NIOBRARA-FORT HAYS-CODELL-CARLILE
1st Production Date:11/19/2019Choke Size: 
Formation Name:NIOBRARA-FORT HAYS-CODELL-CARLILECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/25/2019Treatment End Date:10/14/2019
Treatment Summary:469,976# 100 Mesh Sand; 8,830,915# 20/40 Sand; 165,991 bbls gelled fluid; Flowback determined from well test separator.
Total fluid used in treatment (bbls):165991Max pressure during treatment (psi):4420
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:47
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.83
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):15539
Fresh water used in treatment (bbls):165991Disposition method For flowback:DISPOSAL
Total proppant used (lbs):9300891Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8255 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/21/2019Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 486
BBLS_OIL 566
BTU_GAS 1387
CALC_BBLS_H2O 486
CALC_BBLS_OIL 566
CALC_GOR 2120
CALC_MCF_GAS 1200
CASING_PRESS 2043
GRAVITY_OIL 45
MCF_GAS 1200
TUBING_PRESS 1440
Perforation Data:
Interval Top:8532 ft.# Of Holes:1410
Interval Bottom:17794 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)3591
Total Gas Produced (MCF)60334
GOR16801
GOR DeterminationMCFE
Average BOE per Day38.116
Average MCFE per Day221.087

 Federal Financial Assurance  i 

 Tribal Well  i No