Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-09926
Well Classification: OW Status: PA - 8/25/2022
Well Name/No:Ward Riverdale #15-2-11HC
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date8/25/2022
FacilityID:444304LocationID:441677
County:ADAMS #001Location:NWSW 14 1S67W 6
Field:WATTENBERG - #90750Elevation:5114 ft.
Planned Location:1880FSL  375 FWLLat/Long: 39.962840 / -104.864090Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.962843 / -104.864087Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 10/31/2016
End Date: 11/4/2016
Reported: 11/25/2016
Days to report: 21
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 8/25/2022             Measured TD: 12798 ft.    Vertical TD: 7946 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 8/25/2022
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:12/12/2017
Proposed Top PZ Location:Sec:15 Twp: 1S 67W Footage: 880 FSL  460 FEL
Bottom Hole Location:Sec:15 Twp: 1S 67W Footage: 880 FSL  460 FWL
Proposed Depth/Form:12885 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-1309 , Unit Acreage: 640, Drill Unit: All
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 509, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 12885 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 1667, Top: 0 ft., Bottom: 12885 ft.

Wellbore Completed
Completion Date:8/26/2016
Spud Date:8/18/2016Spud Date Is:ACTUAL
Measured TD:12798 ft.Measured PB depth:12708 ft.
True Vertical TD:7946 ft.True Vertical PB depth:7939 ft.
Top PZ Location:Sec:15 Twp: 1S 67WFootage: 896 FSL  497 FEL
Bottom Hole Location:Sec:15 Twp: 1S 67WFootage: 874 FSL  327 FWL
Log Types:MWD/LWD w/Resistivity, CBL, Mud, (PNN in API#001-09845)
Casing:String Type: CONDUCTOR, Hole Size: , Size: , Top: 0 ft., Depth: 90 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 175, Top: 0 ft., Bottom: 90 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1522 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 540, Top: 0 ft., Bottom: 1522 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 12759 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 1805, Top: 2470 ft., Bottom: 12759 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4631 ft.4823 ft.NN
SUSSEX4973 ft.5244 ft.NN
SHANNON5613 ft.5922 ft.NN
SHARON SPRINGS7417 ft.NN
NIOBRARA7494 ft.NN
FORT HAYS8284 ft.NN
CODELL8461 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 11/13/2020                Interval Top: 10468 ft.    Interval Bottom: 10712 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:11/10/2016Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:10468 ft.# Of Holes:720
Interval Bottom:10712 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 1/4/2021                  Interval Top: 8461 ft.    Interval Bottom: 11194 ft.

 Completed Information for Formation CODELL
1st Production Date:11/10/2016Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:2/22/2021Treatment End Date:N/A
Treatment Summary:8461-10253; 10713-11194'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:
Treatment Date:11/13/2020Treatment End Date:N/A
Treatment Summary:8461-10253; 10713-11329; 11516-11902
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8461 ft.# Of Holes:720
Interval Bottom:11194 ft.Hole Size:0.42 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 1/4/2021                  Interval Top: 8322 ft.    Interval Bottom: 10467 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:11/10/2016Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:2/22/2021Treatment End Date:N/A
Treatment Summary:8322-8460; 10254-10467'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:
Treatment Date:11/13/2020Treatment End Date:N/A
Treatment Summary:8322-8460; 10254-10467; 11330-11515; 11903-12450
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8322 ft.# Of Holes:720
Interval Bottom:10467 ft.Hole Size:0.42 in.

Formation NBFHC                   Formation Classification:  OW                   Status:  AB - 8/25/2022                 Interval Top: 8322 ft.    Interval Bottom: 11194 ft.

 Completed Information for Formation NIOBRARA-FT HAYS-CODELL
1st Production Date:11/10/2016Choke Size: 
Formation Name:NIOBRARA-FT HAYS-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/31/2016Treatment End Date:11/4/2016
Treatment Summary:267 bbls 15% HCl; 3,630,469# 40/70 sand; 906,744# 30/50 sand; 125,697 bbls slickwater and gelled fluid. Flowback determined from well test separator
Total fluid used in treatment (bbls):125964Max pressure during treatment (psi):8022
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:25
Total acid used in treatment (bbls):267Min frac gradient (psi/ft):0.85
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):9750
Fresh water used in treatment (bbls):125697Disposition method For flowback:DISPOSAL
Total proppant used (lbs):4537213Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 566
BBLS_OIL 230
BTU_GAS 1350
CALC_BBLS_H2O 566
CALC_BBLS_OIL 230
CALC_GOR 1222
CALC_MCF_GAS 281
CASING_PRESS 1750
GRAVITY_OIL 44
MCF_GAS 281
Perforation Data:
Interval Top:8322 ft.# Of Holes:720
Interval Bottom:11194 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY08/25/2022
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
April 2024 - March 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No