Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-09889
Well Classification: OW Status: PR - 9/25/2021
Well Name/No:Ivey LC #26-366HNX
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/25/2021
FacilityID:443785LocationID:442411
County:ADAMS #001Location:SWSE 11 1S68W 6
Field:WATTENBERG - #90750Elevation:5107 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1134FSL  1710 FELLat/Long: 39.975135 / -104.965521Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.975131 / -104.965521Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/3/2021
End Date: 8/29/2021
Reported: 9/13/2021
Days to report: 15
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 9/25/2021             Measured TD: 23370 ft.    Vertical TD: 7723 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 9/25/2021
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:11/9/2022
Proposed Top PZ Location:Sec:14 Twp: 1S 68W Footage: 460 FNL  1665 FEL
Bottom Hole Location:Sec:26 Twp: 1S 68W Footage: 370 FSL  1650 FEL
Proposed Depth/Form:23219 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 320, Drill Unit: GWA
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-1904 , Unit Acreage: 960, Drill Unit: Sec.14,23,26: E/2
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1700 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 717, Top: 0 ft., Bottom: 1700 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 23219 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 3155, Top: , Bottom: 23219 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7660 ft., Depth: 12853 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:4/9/2021
Spud Date:12/15/2020Spud Date Is:ACTUAL
Measured TD:23370 ft.Measured PB depth:23365 ft.
True Vertical TD:7723 ft.True Vertical PB depth:7723 ft.
Top PZ Location:Sec:14 Twp: 1S 68WFootage: 460 FNL  1655 FEL
Bottom Hole Location:Sec:26 Twp: 1S 68WFootage: 296 FSL  1642 FEL
Log Types:Mud log, MWD/LWD, CBL (Composite in 001-09900)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2032 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 895, Top: 0 ft., Bottom: 2032 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 23370 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 3255, Top: 4584 ft., Bottom: 23370 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4492 ft.4653 ft.NN
SUSSEX4809 ft.5006 ft.NN
SHANNON5273 ft.5368 ft.NN
SHARON SPRINGS7629 ft.NN
NIOBRARA7928 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 9/25/2021                 Interval Top: 8341 ft.    Interval Bottom: 23142 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:9/22/2021Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:8/3/2021Treatment End Date:8/29/2021
Treatment Summary:1262 bbls 7.5%, 1678 bbls 15%, 45 bbls 28% HCL Acid; 826,456 # 100 Mesh Sand; 9,367,223 # 20/40 Sand; 263,432 bbls Gelled Fluid; Flowback determind from well test separator
Total fluid used in treatment (bbls):266417Max pressure during treatment (psi):4614
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:64
Total acid used in treatment (bbls):2985Min frac gradient (psi/ft):0.86
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):42421
Fresh water used in treatment (bbls):263432Disposition method For flowback:DISPOSAL
Total proppant used (lbs):10193679Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7892 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/25/2021Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1218
BBLS_OIL 100
BTU_GAS 1398
CALC_BBLS_H2O 1218
CALC_BBLS_OIL 100
CALC_GOR 140
CALC_MCF_GAS 14
CASING_PRESS 2878
GRAVITY_OIL 45
MCF_GAS 14
TUBING_PRESS 1900
Perforation Data:
Interval Top:8341 ft.# Of Holes:1296
Interval Bottom:23142 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)16446
Total Gas Produced (MCF)195299
GOR11875
GOR DeterminationBOE
Average BOE per Day137.302
Average MCFE per Day796.334

 Federal Financial Assurance  i 

 Tribal Well  i No