|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 10/17/2021 Measured TD: 23554 ft. Vertical TD: 7846 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 10/17/2021 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 11/9/2022 | Proposed Top PZ Location: | Sec:14 Twp: 1S 68W | Footage: 460 FNL 2090 FEL | Bottom Hole Location: | Sec:26 Twp: 1S 68W | Footage: 370 FSL 2070 FEL | Proposed Depth/Form: | 23348 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-1904 , Unit Acreage: 960, Drill Unit: Sec: 14,23,36: E/2 | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1700 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 717, Top: 0 ft., Bottom: 1700 ft. | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 23348 ft., Weight: 17 , Citings Type: PLANNED | Cement: | Sacks: 3177, Top: , Bottom: 23348 ft. | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7186 ft., Depth: 12652 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: , Top: , Bottom: |
| | |
Wellbore Completed | Completion Date: | 4/20/2021 | Spud Date: | 12/12/2020 | Spud Date Is: | ACTUAL | Measured TD: | 23554 ft. | Measured PB depth: | 23549 ft. | True Vertical TD: | 7846 ft. | True Vertical PB depth: | 7846 ft. | Top PZ Location: | Sec:14 Twp: 1S 68W | Footage: 460 FNL 2038 FEL | Bottom Hole Location: | Sec:26 Twp: 1S 68W | Footage: 298 FSL 2023 FEL | Log Types: | Mud log, MWD/LWD, CBL (Composite in 001-09900) | Log Types: | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2054 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 980, Top: 0 ft., Bottom: 2054 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 23554 ft., Weight: 20 , Citings Type: ACTUAL | Cement: | Sacks: 3285, Top: 4850 ft., Bottom: 23554 ft., Determination Method: CBL | Additional Cement: | String Type: 1ST , Top: 4286 ft., Depth: 4480 ft., Bottom: 4480 ft., Sacks: 1125, Method: SQUEEZE | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 4482 ft. | 4647 ft. | N | N | SUSSEX | 4793 ft. | 5008 ft. | N | N | SHANNON | 5275 ft. | 5360 ft. | N | N | SHARON SPRINGS | 7617 ft. | | N | N | NIOBRARA | 7856 ft. | | N | N |
Formation NBRR Formation Classification: OW Status: PR - 10/17/2021 Interval Top: 8527 ft. Interval Bottom: 23328 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 10/13/2021 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | HYDRAULIC FRACTURING | Treatment Date: | 6/15/2021 | Treatment End Date: | 8/30/2021 | Treatment Summary: | 2447 bbls 15% HCL Acid & 1064 bbls of 7.5% Acid; 1,148,842 # 100 Mesh Sand; 13,220,063 # 20/40 Sand; 326,666 bbls Gelled Fluid; Flowback determind from well test separator | Total fluid used in treatment (bbls): | 330177 | Max pressure during treatment (psi): | 5008 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.33 | Type Of gas: | | Number Of staged intervals: | 74 | Total acid used in treatment (bbls): | 3511 | Min frac gradient (psi/ft): | 0.84 | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 32979 | Fresh water used in treatment (bbls): | 326666 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 14368905 | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8133 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 10/17/2021 | Test Method: | Flowing | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 609 | BBLS_OIL | 389 | BTU_GAS | 1398 | CALC_BBLS_H2O | 609 | CALC_BBLS_OIL | 389 | CALC_GOR | 1676 | CALC_MCF_GAS | 652 | CASING_PRESS | 1660 | GRAVITY_OIL | 45 | MCF_GAS | 652 | TUBING_PRESS | 1943 |
| Perforation Data: | Interval Top: | 8527 ft. | # Of Holes: | 1480 | Interval Bottom: | 23328 ft. | Hole Size: | 0.34 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 32409 |
Total Gas Produced (MCF) | 261461 |
GOR | 8067 |
GOR Determination | BOE |
Average BOE per Day | 212.057 |
Average MCFE per Day | 1229.923 |
Federal Financial Assurance | i | |
|
|