Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-09887
Well Classification: OW Status: PR - 10/17/2021
Well Name/No:Ivey LC #26-368HN
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/17/2021
FacilityID:443783LocationID:442411
County:ADAMS #001Location:SWSE 11 1S68W 6
Field:WATTENBERG - #90750Elevation:5107 ft.
Planned Location:1162FSL  1700 FELLat/Long: 39.975212 / -104.965484Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/15/2021
End Date: 8/30/2021
Reported: 9/13/2021
Days to report: 14
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 10/17/2021             Measured TD: 23554 ft.    Vertical TD: 7846 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 10/17/2021
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:11/9/2022
Proposed Top PZ Location:Sec:14 Twp: 1S 68W Footage: 460 FNL  2090 FEL
Bottom Hole Location:Sec:26 Twp: 1S 68W Footage: 370 FSL  2070 FEL
Proposed Depth/Form:23348 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-1904 , Unit Acreage: 960, Drill Unit: Sec: 14,23,36: E/2
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1700 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 717, Top: 0 ft., Bottom: 1700 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 23348 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 3177, Top: , Bottom: 23348 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7186 ft., Depth: 12652 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:4/20/2021
Spud Date:12/12/2020Spud Date Is:ACTUAL
Measured TD:23554 ft.Measured PB depth:23549 ft.
True Vertical TD:7846 ft.True Vertical PB depth:7846 ft.
Top PZ Location:Sec:14 Twp: 1S 68WFootage: 460 FNL  2038 FEL
Bottom Hole Location:Sec:26 Twp: 1S 68WFootage: 298 FSL  2023 FEL
Log Types:Mud log, MWD/LWD, CBL (Composite in 001-09900)
Log Types:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2054 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 980, Top: 0 ft., Bottom: 2054 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 23554 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 3285, Top: 4850 ft., Bottom: 23554 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 4286 ft., Depth: 4480 ft., Bottom: 4480 ft., Sacks: 1125, Method: SQUEEZE
FormationInterval TopLog BottomCoredDSTs
PARKMAN4482 ft.4647 ft.NN
SUSSEX4793 ft.5008 ft.NN
SHANNON5275 ft.5360 ft.NN
SHARON SPRINGS7617 ft.NN
NIOBRARA7856 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 10/17/2021                Interval Top: 8527 ft.    Interval Bottom: 23328 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/13/2021Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:6/15/2021Treatment End Date:8/30/2021
Treatment Summary:2447 bbls 15% HCL Acid & 1064 bbls of 7.5% Acid; 1,148,842 # 100 Mesh Sand; 13,220,063 # 20/40 Sand; 326,666 bbls Gelled Fluid; Flowback determind from well test separator
Total fluid used in treatment (bbls):330177Max pressure during treatment (psi):5008
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:74
Total acid used in treatment (bbls):3511Min frac gradient (psi/ft):0.84
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):32979
Fresh water used in treatment (bbls):326666Disposition method For flowback:DISPOSAL
Total proppant used (lbs):14368905Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8133 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/17/2021Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 609
BBLS_OIL 389
BTU_GAS 1398
CALC_BBLS_H2O 609
CALC_BBLS_OIL 389
CALC_GOR 1676
CALC_MCF_GAS 652
CASING_PRESS 1660
GRAVITY_OIL 45
MCF_GAS 652
TUBING_PRESS 1943
Perforation Data:
Interval Top:8527 ft.# Of Holes:1480
Interval Bottom:23328 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)32409
Total Gas Produced (MCF)261461
GOR8067
GOR DeterminationBOE
Average BOE per Day212.057
Average MCFE per Day1229.923

 Federal Financial Assurance  i 

 Tribal Well  i No