Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-09884
Well Classification: OW Status: PR - 3/1/2025
Well Name/No:Kortum LD #33-179HC
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/1/2025
FacilityID:443424LocationID:443415
County:ADAMS #001Location:NWNE 21 1S67W 6
Field:WATTENBERG - #90750Elevation:5188 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:215FNL  2070 FELLat/Long: 39.957016 / -104.891703Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.957016 / -104.891703Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/5/2021
End Date: 2/22/2021
Reported: 3/24/2021
Days to report: 30
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 3/1/2025             Measured TD: 21563 ft.    Vertical TD: 8079 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 3/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:3/29/2022
Proposed Top PZ Location:Sec:21 Twp: 1S 67W Footage: 460 FNL  509 FWL
Bottom Hole Location:Sec:33 Twp: 1S 67W Footage: 2348 FNL  524 FWL
Proposed Depth/Form:20859 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CARL , Formation: CARLILE , Order: 407-3470 , Unit Acreage: 1600, Drill Unit: S. 21&28 All; 33: N2
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-3470 , Unit Acreage: 1600, Drill Unit: S. 21&28 All; 33: N2
Formation And Spacing:Code: FTHYS , Formation: FORT HAYS , Order: 407-3470 , Unit Acreage: 1600, Drill Unit: S. 21&28 All; 33: N2
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-3470 , Unit Acreage: 1600, Drill Unit: S. 21&28 All; 33: N2
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 121, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1700 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 707, Top: 0 ft., Bottom: 1700 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 20859 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 2206, Top: , Bottom: 20859 ft.

Wellbore Completed
Completion Date:9/2/2020
Spud Date:7/19/2020Spud Date Is:ACTUAL
Measured TD:21563 ft.Measured PB depth:21500 ft.
True Vertical TD:8079 ft.True Vertical PB depth:8079 ft.
Top PZ Location:Sec:21 Twp: 1S 67WFootage: 460 FNL  509 FWL
Bottom Hole Location:Sec:33 Twp: 1S 67WFootage: 2348 FNL  524 FWL
Log Types:Mud log, MWD/LWD, CBL, Composite.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2042 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 930, Top: 0 ft., Bottom: 2042 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 21563 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2940, Top: 930 ft., Bottom: 21563 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4686 ft.4786 ft.NN
SUSSEX5240 ft.5443 ft.NN
SHANNON6000 ft.6098 ft.NN
SHARON SPRINGS8038 ft.NN
NIOBRARA8224 ft.NN
FORT HAYS8851 ft.NN
CODELL8939 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 10/4/2024                 Interval Top: 17652 ft.    Interval Bottom: 18165 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:4/19/2021Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/4/2024Treatment End Date:N/A
Treatment Summary:NBRR perf interval: 17652-18165'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:17652 ft.# Of Holes:1464
Interval Bottom:18165 ft.Hole Size:0.38 in.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 10/4/2024                 Interval Top: 12199 ft.    Interval Bottom: 12246 ft.

 Completed Information for Formation CARLILE
1st Production Date:4/19/2021Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/4/2024Treatment End Date:N/A
Treatment Summary:Carlile perf interval: 12199-12246'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:12199 ft.# Of Holes:1464
Interval Bottom:12246 ft.Hole Size:0.38 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 10/4/2024                 Interval Top: 9355 ft.    Interval Bottom: 17651 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:4/19/2021Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/4/2024Treatment End Date:N/A
Treatment Summary:Fort Hays perf interval: 9355-9554', 10954-11141', 14603-14725', 17011-17263', 17321-17651'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:9355 ft.# Of Holes:1464
Interval Bottom:17651 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 10/4/2024                 Interval Top: 9166 ft.    Interval Bottom: 21313 ft.

 Completed Information for Formation CODELL
1st Production Date:4/19/2021Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/4/2024Treatment End Date:N/A
Treatment Summary:Codell perf interval: 9166-9354', 9555-10953', 11142-12198', 12247-14602', 14726-17010', 17264-17320', 18166-21313'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:9166 ft.# Of Holes:1464
Interval Bottom:21313 ft.Hole Size:0.38 in.

Formation NFCC                     Formation Classification:  OW                     Status:  PR - 3/1/2025                  Interval Top: 9166 ft.    Interval Bottom: 21313 ft.

 Completed Information for Formation NIOBRARA-FORT HAYS-CODELL-CARLILE
1st Production Date:4/19/2021Choke Size: 
Formation Name:NIOBRARA-FORT HAYS-CODELL-CARLILECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:2/5/2021Treatment End Date:2/22/2021
Treatment Summary:36 bbls 15% HCL Acid; 612,635 # 100 Mesh Sand; 8,521,283 # 20/40 Sand; 206,830 bbls gelled fluid; Flowback determined from well test separator.
Total fluid used in treatment (bbls):206866Max pressure during treatment (psi):4310
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:61
Total acid used in treatment (bbls):36Min frac gradient (psi/ft):0.85
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):46368
Fresh water used in treatment (bbls):206830Disposition method For flowback:DISPOSAL
Total proppant used (lbs):9133918Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8751 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/21/2021Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 300
BBLS_OIL 621
BTU_GAS 1451
CALC_BBLS_H2O 300
CALC_BBLS_OIL 621
CALC_GOR 1410
CALC_MCF_GAS 876
CASING_PRESS 2316
GRAVITY_OIL 47
MCF_GAS 876
TUBING_PRESS 1954
Perforation Data:
Interval Top:9166 ft.# Of Holes:1464
Interval Bottom:21313 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)18718
Total Gas Produced (MCF)173112
GOR9248
GOR DeterminationBOE
Average BOE per Day132.148
Average MCFE per Day766.440

 Federal Financial Assurance  i 

 Tribal Well  i No