Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-09845
Well Classification: OW Status: PR - 9/1/2023
Well Name/No:Ward Riverdale #14-4-12HC
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/1/2023
FacilityID:441675LocationID:441677
County:ADAMS #001Location:NWSW 14 1S67W 6
Field:WATTENBERG - #90750Elevation:5114 ft.
Planned Location:1880FSL  335 FWLLat/Long: 39.962840 / -104.864230Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.962843 / -104.864229Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/7/2015
End Date: 6/11/2015
Reported: 6/16/2015
Days to report: 5
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 9/1/2023             Measured TD: 12820 ft.    Vertical TD: 7856 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 9/1/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:4/30/2017
Proposed Top PZ Location:Sec:14 Twp: 1S 67W Footage: 480 FSL  460 FWL
Bottom Hole Location:Sec:14 Twp: 1S 67W Footage: 480 FSL  460 FEL
Proposed Depth/Form:12816 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-1038 , Unit Acreage: 640, Drill Unit: All
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1200 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 1005, Top: 0 ft., Bottom: 1200 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 12800 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 844, Top: 4400 ft., Bottom: 12800 ft.

Wellbore Completed
Completion Date:5/17/2015
Spud Date:5/8/2015Spud Date Is:ACTUAL
Measured TD:12820 ft.Measured PB depth:12755 ft.
True Vertical TD:7856 ft.True Vertical PB depth:7855 ft.
Top PZ Location:Sec:14 Twp: 1S 67WFootage: 505 FSL  585 FWL
Bottom Hole Location:Sec:14 Twp: 1S 67WFootage: 512 FSL  375 FEL
Log Types:CBL, Mud, MWD/LWD, PNN
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 20 in., Top: 0 ft., Depth: 108 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 175, Top: 0 ft., Bottom: 108 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1246 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 501, Top: 0 ft., Bottom: 1246 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 12800 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 1649, Top: 0 ft., Bottom: 12800 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4723 ft.4915 ft.NN
SUSSEX5057 ft.5263 ft.NN
SHANNON5806 ft.6068 ft.NN
SHARON SPRINGS7579 ft.NN
NIOBRARA7661 ft.NN
FORT HAYS8271 ft.NN
CODELL8364 ft.NN

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 11/13/2020                Interval Top: 9162 ft.    Interval Bottom: 11447 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:6/16/2015Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:11/13/2020Treatment End Date:N/A
Treatment Summary:9162-9594; 11273-11447
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:9162 ft.# Of Holes:720
Interval Bottom:11447 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 11/13/2020                Interval Top: 9022 ft.    Interval Bottom: 9161 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:6/16/2015Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:9022 ft.# Of Holes:720
Interval Bottom:9161 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 11/13/2020                Interval Top: 8538 ft.    Interval Bottom: 12621 ft.

 Completed Information for Formation CODELL
1st Production Date:6/16/2015Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:11/13/2020Treatment End Date:N/A
Treatment Summary:8538-9021; 9595-11272; 11448-12621
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8538 ft.# Of Holes:720
Interval Bottom:12621 ft.Hole Size:0.42 in.

Formation NBFHC                   Formation Classification:  OW                   Status:  PR - 9/1/2023                  Interval Top: 8538 ft.    Interval Bottom: 12621 ft.

 Completed Information for Formation NIOBRARA-FT HAYS-CODELL
1st Production Date:6/16/2015Choke Size: 
Formation Name:NIOBRARA-FT HAYS-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/7/2015Treatment End Date:6/11/2015
Treatment Summary:3,441,409# 40/70 sand; 958,743# 30/50 sand; 132,010 bbls slickwater and gelled fluid. Flowback determined from well test separator
Total fluid used in treatment (bbls):132010Max pressure during treatment (psi):6988
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:24
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.86
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):8429
Fresh water used in treatment (bbls):132010Disposition method For flowback:DISPOSAL
Total proppant used (lbs):4400152Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/25/2015Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:FLARED
Test TypeMeasure
BBLS_H2O 365
BBLS_OIL 550
BTU_GAS 1450
CALC_BBLS_H2O 365
CALC_BBLS_OIL 550
CALC_GOR 1009
CALC_MCF_GAS 555
CASING_PRESS 1440
GRAVITY_OIL 41
MCF_GAS 555
Perforation Data:
Interval Top:8538 ft.# Of Holes:720
Interval Bottom:12621 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
April 2024 - March 2025i
Total Oil Produced (Barrels)9239
Total Gas Produced (MCF)45580
GOR4933
GOR DeterminationBOE
Average BOE per Day47.011
Average MCFE per Day272.674

 Federal Financial Assurance  i 

 Tribal Well  i No