|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 5/1/2025 Measured TD: 12667 ft. Vertical TD: 8075 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 5/1/2025 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 12/22/2016 | | Proposed Top PZ Location: | Sec:18 Twp: 1S 67W | Footage: 460 FNL 230 FEL | | Bottom Hole Location: | Sec:18 Twp: 1S 67W | Footage: 470 FSL 230 FEL | | Proposed Depth/Form: | 12708 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 320, Drill Unit: GWA | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED | | Cement: | Sacks: 121, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1300 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 579, Top: 0 ft., Bottom: 1300 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8377 ft., Weight: 26 , Citings Type: PLANNED | | Cement: | Sacks: 716, Top: 1000 ft., Bottom: 8377 ft. |
| | |
| Wellbore Completed | | Completion Date: | 2/28/2015 | | Spud Date: | 12/5/2014 | Spud Date Is: | ACTUAL | | Measured TD: | 12667 ft. | Measured PB depth: | 12617 ft. | | True Vertical TD: | 8075 ft. | True Vertical PB depth: | 8075 ft. | | Top PZ Location: | Sec:18 Twp: 1S 67W | Footage: 526 FNL 201 FEL | | Bottom Hole Location: | Sec:18 Twp: 1S 67W | Footage: 472 FSL 233 FEL | | Log Types: | CBL, Mud Log, MWD/LWD, (Triple Combo in API # 001-09774-01) | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1303 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 575, Top: 0 ft., Bottom: 1303 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 12662 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 1266, Top: 786 ft., Bottom: 12662 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4644 ft. | 4832 ft. | N | N | | SUSSEX | 4992 ft. | 5169 ft. | N | N | | SHANNON | 6044 ft. | 6311 ft. | N | N | | SHARON SPRINGS | 7568 ft. | | N | N | | NIOBRARA | 7680 ft. | | N | N | | FORT HAYS | 8234 ft. | | N | N | | CODELL | 8321 ft. | | N | N |
Formation FTHYS Formation Classification: OW Status: CM - 8/14/2019 Interval Top: 9437 ft. Interval Bottom: 9599 ft.| Completed Information for Formation FORT HAYS | | 1st Production Date: | 4/12/2015 | Choke Size: | | | Formation Name: | FORT HAYS | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 8/14/2019 | Treatment End Date: | N/A | | Treatment Summary: | Fort Hays Perf Interval: 9437' - 9599' | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation FTHYS. |
| | Perforation Data: | | Interval Top: | 9437 ft. | # Of Holes: | 630 | | Interval Bottom: | 9599 ft. | Hole Size: | 0.42 in. |
|
Formation CD-FH Formation Classification: OW Status: AB - 5/1/2025 Interval Top: 8400 ft. Interval Bottom: 12520 ft.| Completed Information for Formation CODELL-FORT HAYS | | 1st Production Date: | 4/12/2015 | Choke Size: | | | Formation Name: | CODELL-FORT HAYS | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 3/19/2015 | Treatment End Date: | 3/31/2015 | | Treatment Summary: | 223,500 lbs 40/70 Sand; 2,995,200 lbs 20/40 Sand; 223,500 lbs 20/40 CRC Sand; 117,800 lbs 100 Mesh; 79,935 bbls Gelled Fluid; Flowback determined from well test separator. | | Total fluid used in treatment (bbls): | 79935 | Max pressure during treatment (psi): | 5208 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.33 | | Type Of gas: | | Number Of staged intervals: | 21 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.90 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 5262 | | Fresh water used in treatment (bbls): | 79935 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 3560000 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 363 | | BBLS_OIL | 383 | | BTU_GAS | 1313 | | CALC_BBLS_H2O | 363 | | CALC_BBLS_OIL | 383 | | CALC_GOR | 1342 | | CALC_MCF_GAS | 514 | | CASING_PRESS | 2228 | | GRAVITY_OIL | 44 | | MCF_GAS | 514 | | TUBING_PRESS | 855 |
| | Perforation Data: | | Interval Top: | 8400 ft. | # Of Holes: | 630 | | Interval Bottom: | 12520 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: OW Status: CM - 8/14/2019 Interval Top: 8400 ft. Interval Bottom: 12520 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 4/12/2015 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 8/14/2019 | Treatment End Date: | N/A | | Treatment Summary: | Codell Perf Interval: 8400' - 9436', 9600' - 12520' | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 8400 ft. | # Of Holes: | 630 | | Interval Bottom: | 12520 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 05/01/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|