Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-09773
Well Classification: OW Status: PA - 5/1/2025
Well Name/No:Willow Bend LD #18-23HN
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date5/1/2025
FacilityID:434394LocationID:434399
Municipality/County:THORNTON / ADAMS #001Location:NENE 18 1S67W 6
Field:WATTENBERG - #90750Elevation:5231 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:336FNL  646 FELLat/Long: 39.970961 / -104.924311Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.970961 / -104.924309Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/18/2015
End Date: 3/31/2015
Reported: 4/7/2015
Days to report: 7
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 5/1/2025             Measured TD: 12721 ft.    Vertical TD: 7941 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 5/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:9/25/2015
Proposed Top PZ Location:Sec:18 Twp: 1S 67W Footage: 508 FNL  1665 FEL
Bottom Hole Location:Sec:18 Twp: 1S 67W Footage: 485 FSL  1650 FEL
Proposed Depth/Form:12661 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 121, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1300 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 579, Top: 0 ft., Bottom: 1300 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 12661 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1205, Top: 1300 ft., Bottom: 12661 ft.

Wellbore Completed
Completion Date:2/9/2015
Spud Date:12/10/2014Spud Date Is:ACTUAL
Measured TD:12721 ft.Measured PB depth:12666 ft.
True Vertical TD:7941 ft.True Vertical PB depth:7942 ft.
Top PZ Location:Sec:18 Twp: 1S 67WFootage: 508 FNL  1665 FEL
Bottom Hole Location:Sec:18 Twp: 1S 67WFootage: 485 FSL  1650 FEL
Log Types:CBL, Mud Log, MWD/LWD, (Triple Combo in API # 001-09774-01)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1305 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 575, Top: 0 ft., Bottom: 1305 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 12714 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1255, Top: 870 ft., Bottom: 12714 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4655 ft.4833 ft.NN
SUSSEX5012 ft.5204 ft.NN
SHANNON6062 ft.6314 ft.NN
SHARON SPRINGS7704 ft.NN
NIOBRARA7842 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  AB - 5/1/2025                  Interval Top: 8436 ft.    Interval Bottom: 12576 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:4/8/2015Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/18/2015Treatment End Date:3/31/2015
Treatment Summary:706 bbls 15% HCL Acid; 369,260 lbs 40/70 Sand; 2,251,070 lbs 20/40 Sand; 166,000lbs 20/40 CRC Sand; 225,300 lbs 100 Mesh; 96,079 bbls Gelled Fluid; Flowback determined from well test separator.
Total fluid used in treatment (bbls):96785Max pressure during treatment (psi):6082
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:28
Total acid used in treatment (bbls):706Min frac gradient (psi/ft):0.95
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):17246
Fresh water used in treatment (bbls):96079Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3011630Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 198
BBLS_OIL 314
BTU_GAS 1313
CALC_BBLS_H2O 198
CALC_BBLS_OIL 314
CALC_GOR 1615
CALC_MCF_GAS 507
CASING_PRESS 2086
GRAVITY_OIL 45
MCF_GAS 507
TUBING_PRESS 771
Perforation Data:
Interval Top:8436 ft.# Of Holes:840
Interval Bottom:12576 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY05/01/2025
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No