Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-09773
Well Classification: OW Status: PA - 5/1/2025
Well Name/No:Willow Bend LD #18-23HN
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date5/1/2025
FacilityID:434394LocationID:434399
Municipality/County:THORNTON / ADAMS #001Location:NENE 18 1S67W 6
Field:WATTENBERG - #90750Elevation:5231 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:336FNL  646 FELLat/Long: 39.970961 / -104.924311Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.970961 / -104.924309Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/18/2015
End Date: 3/31/2015
Reported: 4/7/2015
Days to report: 7
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 5/1/2025             Measured TD: 12721 ft.    Vertical TD: 7941 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 5/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:9/25/2015
Proposed Top PZ Location:Sec:18 Twp: 1S 67W Footage: 508 FNL  1665 FEL
Bottom Hole Location:Sec:18 Twp: 1S 67W Footage: 485 FSL  1650 FEL
Proposed Depth/Form:12661 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 121, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1300 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 579, Top: 0 ft., Bottom: 1300 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 12661 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1205, Top: 1300 ft., Bottom: 12661 ft.

Wellbore Completed
Completion Date:2/9/2015
Spud Date:12/10/2014Spud Date Is:ACTUAL
Measured TD:12721 ft.Measured PB depth:12666 ft.
True Vertical TD:7941 ft.True Vertical PB depth:7942 ft.
Top PZ Location:Sec:18 Twp: 1S 67WFootage: 508 FNL  1665 FEL
Bottom Hole Location:Sec:18 Twp: 1S 67WFootage: 485 FSL  1650 FEL
Log Types:CBL, Mud Log, MWD/LWD, (Triple Combo in API # 001-09774-01)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1305 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 575, Top: 0 ft., Bottom: 1305 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 12714 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1255, Top: 870 ft., Bottom: 12714 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4655 ft.4833 ft.NN
SUSSEX5012 ft.5204 ft.NN
SHANNON6062 ft.6314 ft.NN
SHARON SPRINGS7704 ft.NN
NIOBRARA7842 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  AB - 5/1/2025                  Interval Top: 8436 ft.    Interval Bottom: 12576 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:4/8/2015Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/18/2015Treatment End Date:3/31/2015
Treatment Summary:706 bbls 15% HCL Acid; 369,260 lbs 40/70 Sand; 2,251,070 lbs 20/40 Sand; 166,000lbs 20/40 CRC Sand; 225,300 lbs 100 Mesh; 96,079 bbls Gelled Fluid; Flowback determined from well test separator.
Total fluid used in treatment (bbls):96785Max pressure during treatment (psi):6082
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:28
Total acid used in treatment (bbls):706Min frac gradient (psi/ft):0.95
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):17246
Fresh water used in treatment (bbls):96079Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3011630Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 198
BBLS_OIL 314
BTU_GAS 1313
CALC_BBLS_H2O 198
CALC_BBLS_OIL 314
CALC_GOR 1615
CALC_MCF_GAS 507
CASING_PRESS 2086
GRAVITY_OIL 45
MCF_GAS 507
TUBING_PRESS 771
Perforation Data:
Interval Top:8436 ft.# Of Holes:840
Interval Bottom:12576 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY05/01/2025
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
September 2024 - August 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No