|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 1/4/2024 Measured TD: 11715 ft. Vertical TD: 7594 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 1/4/2024 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 7/11/2014 | | Proposed Top PZ Location: | Sec:21 Twp: 3S 64W | Footage: 650 FSL 650 FWL | | Bottom Hole Location: | Sec:21 Twp: 3S 64W | Footage: 650 FSL 650 FEL | | Proposed Depth/Form: | 8246 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 535-167 , Unit Acreage: 640, Drill Unit: Sec. 21 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1910 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 534, Top: 0 ft., Bottom: 1910 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7748 ft., Weight: 23 , Citings Type: PLANNED | | Cement: | Sacks: 720, Top: 1400 ft., Bottom: 7748 ft. | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 11761 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 438, Top: 6357 ft., Bottom: 11761 ft. | | Casing: | String Type: OPEN HOLE, Hole Size: 8.75 in., Size: , Top: 1910 ft., Depth: 8246 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 924, Top: 6624 ft., Bottom: 8246 ft. |
| | |
| Wellbore Completed | | Completion Date: | 1/20/2013 | | Spud Date: | 1/4/2013 | Spud Date Is: | ACTUAL | | Measured TD: | 11715 ft. | Measured PB depth: | 11645 ft. | | True Vertical TD: | 7594 ft. | True Vertical PB depth: | 7595 ft. | | Top PZ Location: | Sec:21 Twp: 3S 64W | Footage: 650 FSL 650 FWL | | Bottom Hole Location: | Sec:21 Twp: 3S 64W | Footage: 650 FSL 650 FEL | | Log Types: | MWD, CBL, resistivity log run on WEP 4-28-11-3-64 API #05-001-09753. | | Casing: | String Type: CONDUCTOR, Hole Size: , Size: , Top: 0 ft., Depth: 60 ft., Weight: 36.9 , Citings Type: ACTUAL | | Cement: | Sacks: 8, Top: 0 ft., Bottom: 60 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 3035 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 1181, Top: 0 ft., Bottom: 3035 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: , Top: 0 ft., Depth: 7578 ft., Weight: 23 , Citings Type: ACTUAL | | Cement: | Sacks: 492, Top: 2557 ft., Bottom: 7578 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6909 ft., Depth: 11695 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 5278 ft. | 5534 ft. | N | N | | SUSSEX | 5804 ft. | 6048 ft. | N | N | | SHARON SPRINGS | 7303 ft. | 7496 ft. | N | N | | NIOBRARA | 7496 ft. | | N | N |
Formation NBRR Formation Classification: OW Status: AB - 1/4/2024 Interval Top: 8151 ft. Interval Bottom: 11715 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 2/19/2013 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | Yes |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 1/25/2013 | Treatment End Date: | 2/8/2013 | | Treatment Summary: | Fracture stimulated through a 14 stage port and packer system with 3,775,152 lbs of sand and 110,964 bbls of fresh water. | | Total fluid used in treatment (bbls): | 110964 | Max pressure during treatment (psi): | 6195 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.33 | | Type Of gas: | | Number Of staged intervals: | 14 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.93 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 35508 | | Fresh water used in treatment (bbls): | 110964 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 3775152 | Green completions techniques utilized: | No | | Reason green techniques Not utilized: PIPELINE |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7130 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/6/2013 | Test Method: | | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | FLARED | |
| Test Type | Measure |
|---|
| BBLS_H2O | 300 | | BBLS_OIL | 18 | | BTU_GAS | 1488 | | CALC_BBLS_H2O | 300 | | CALC_BBLS_OIL | 18 | | CALC_GOR | 1666 | | CALC_MCF_GAS | 30 | | CASING_PRESS | 220 | | GRAVITY_OIL | 35 | | MCF_GAS | 30 | | TUBING_PRESS | 100 |
| | Perforation Data: | | Interval Top: | 8151 ft. | # Of Holes: | | | Interval Bottom: | 11715 ft. | Hole Size: | |
|
Sidetrack #01 Wellbore Classification: Status: AB - 1/4/2013 Measured TD: | Wellbore Data for Sidetrack #01 | Wellbore Classification: AB - 1/4/2013 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 7/11/2014 | | Proposed Top PZ Location: | Sec:21 Twp: 3S 64W | Footage: 650 FSL 650 FWL | | Bottom Hole Location: | Sec:28 Twp: 3S 64W | Footage: 650 FSL 650 FEL | | Proposed Depth/Form: | 12123 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 535-167 , Unit Acreage: 640, Drill Unit: Sec. 21 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1910 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 534, Top: 0 ft., Bottom: 1910 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7748 ft., Weight: 23 , Citings Type: PLANNED | | Cement: | Sacks: 720, Top: 1400 ft., Bottom: 7748 ft. | | Casing: | String Type: 1ST LINER, Hole Size: 6.25 in., Size: 4.5 in., Top: 0 ft., Depth: 12123 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 438, Top: 6357 ft., Bottom: 12123 ft. |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Spud Date: | 1/4/2013 | Spud Date Is: | NOTICE | | Measured TD: | | Measured PB depth: | | | True Vertical TD: | | True Vertical PB depth: | | | No formation data to display. |
|
|
|
|
|
|
| Reported Plugged | Y | 01/04/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2027 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|