|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 1/21/2022 Measured TD: 8810 ft. Vertical TD: 8477 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 1/21/2022 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 1/8/2012 | Proposed Top PZ Location: | Sec:9 Twp: 1S 67W | Footage: 2021 FSL 1978 FWL | Bottom Hole Location: | Sec:9 Twp: 1S 67W | Footage: 2015 FSL 1979 FWL | Proposed Depth/Form: | 8866 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: W/2 | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: E2SW | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1300 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 910, Top: , Bottom: 1300 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8866 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 200, Top: , Bottom: 8866 ft. |
| | |
Wellbore Completed | Completion Date: | 10/20/2010 | Spud Date: | 10/15/2010 | Spud Date Is: | ACTUAL | Measured TD: | 8810 ft. | Measured PB depth: | 8762 ft. | True Vertical TD: | 8477 ft. | True Vertical PB depth: | 8429 ft. | Top PZ Location: | Sec:9 Twp: 1S 67W | Footage: 2021 FSL 1978 FWL | Bottom Hole Location: | Sec:9 Twp: 1S 67W | Footage: 2015 FSL 1979 FWL | Log Types: | PRELIMINARY FORM 5 | Log Types: | CD-CN-ML, DI-GL-GR, CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1330 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 870, Top: 0 ft., Bottom: 1330 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8799 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 1070, Top: 860 ft., Bottom: 8799 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 4773 ft. | | | | SUSSEX | 5270 ft. | | | | NIOBRARA | 7830 ft. | | | | CODELL | 8261 ft. | | | | J SAND | 8690 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 1/21/2022 Interval Top: 8704 ft. Interval Bottom: 8734 ft. Completed Information for Formation J SAND | 1st Production Date: | 1/26/2011 | Choke Size: | | Formation Name: | J SAND | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 1/4/2011 | Treatment Summary: | Frac J-Sand down 4-1/2" Csg w/ 146,454 gal Slickwater w/ 116,320# 40/70, 4,000# SB Excel |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_OIL | 21 | BTU_GAS | 1234 | CALC_BBLS_OIL | 21 | CALC_GOR | 1190 | CALC_MCF_GAS | 25 | CASING_PRESS | 1650 | GRAVITY_OIL | 40 | MCF_GAS | 25 |
| Perforation Data: | Interval Top: | 8704 ft. | # Of Holes: | 64 | Interval Bottom: | 8734 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 1/21/2022 Interval Top: 7850 ft. Interval Bottom: 8283 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 1/26/2011 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 1/14/2011 | Treatment Summary: | NB Perf 7850-8112 Holes 64 Size 0.42 CD Perf 8263-8283 Holes 60 Size 0.42
Frac Niobrara A & B & C down 4-1/2" Csg w/ 250 gal 15% HCl & 228,986 gal Slickwater w/ 200,960# 40/70, 4,000# SB Excel
Frac Codell down 4-1/2" Csg w/ 197,526 gal Slickwater w/ 150,760# 40/70, 4,000# SB Excel |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_OIL | 21 | BTU_GAS | 1234 | CALC_BBLS_OIL | 21 | CALC_GOR | 1190 | CALC_MCF_GAS | 25 | CASING_PRESS | 1650 | GRAVITY_OIL | 40 | MCF_GAS | 25 |
| Perforation Data: | Interval Top: | 7850 ft. | # Of Holes: | 124 | Interval Bottom: | 8283 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | Y | 01/21/2022 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|