|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 5/1/2024 Measured TD: 8886 ft. Vertical TD: 8603 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 5/1/2024 | Wellbore Permit | DIRECTIONAL | Permit #: | 20073740 | Expiration Date: | 7/10/2008 | Proposed Top PZ Location: | Sec: Twp: | Footage: 1810 FNL 632 FEL | Bottom Hole Location: | Sec:3 Twp: 1S 68W | Footage: 1810 FNL 582 FEL | Proposed Depth/Form: | 8886 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 80, Drill Unit: E/2 NE | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: , Unit Acreage: 160, Drill Unit: NE | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: NE | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1125 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 550, Top: 0 ft., Bottom: 1125 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8886 ft., Weight: 10.5 , Citings Type: PLANNED | Cement: | Sacks: 300, Top: 7000 ft., Bottom: 8886 ft. | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5836 ft., Weight: , Citings Type: PLANNED | Cement: | Sacks: 290, Top: 4550 ft., Bottom: 5836 ft. |
| | |
Wellbore Completed | Completion Date: | 6/29/2005 | Spud Date: | 6/20/2005 | Spud Date Is: | ACTUAL | Measured TD: | 8886 ft. | Measured PB depth: | 8838 ft. | True Vertical TD: | 8603 ft. | True Vertical PB depth: | 8555 ft. | Top PZ Location: | Sec: Twp: | Footage: 1810 FNL 632 FEL | Bottom Hole Location: | Sec:3 Twp: 1S 68W | Footage: 1810 N 582 E | Log Types: | CBL, IND, NEU-DENS | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1125 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 310, Top: 0 ft., Bottom: 1125 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8886 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 300, Top: 7000 ft., Bottom: 8886 ft., Determination Method: CBL | Casing: | String Type: 2ND, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 5835 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 290, Top: 4550 ft., Bottom: 5835 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 5118 ft. | | N | N | NIOBRARA | 7730 ft. | | N | N | FORT HAYS | 8168 ft. | | N | N | CODELL | 8188 ft. | | N | N | J SAND | 8614 ft. | | N | N | DAKOTA | 8776 ft. | | N | N |
Formation DKTA Formation Classification: GW Status: SI - 5/1/2024 Interval Top: 8780 ft. Interval Bottom: 8796 ft. Completed Information for Formation DAKOTA | 1st Production Date: | 1/24/2006 | Choke Size: | 0.250 in. | Formation Name: | DAKOTA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 8/19/2005 | Treatment Summary: | FRAC W/ 38000# 20/40 SAND & 742 BBL WATER |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 12/25/2005 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 20 | BBLS_OIL | 9 | CALC_BBLS_H2O | 20 | CALC_BBLS_OIL | 9 | CALC_GOR | 62000 | CALC_MCF_GAS | 558 | CASING_PRESS | 850 | MCF_GAS | 558 |
| Perforation Data: | Interval Top: | 8780 ft. | # Of Holes: | 48 | Interval Bottom: | 8796 ft. | Hole Size: | 0.42 in. |
|
Formation JSND Formation Classification: GW Status: SI - 5/1/2024 Interval Top: 8614 ft. Interval Bottom: 8635 ft. Completed Information for Formation J SAND | 1st Production Date: | 1/24/2006 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 8/24/2005 | Treatment Summary: | FRAC W/ 202,700# 20/40 SAND & 3445 BBL WATER ***FOR TEST INFORMATION SEE DAKOTA |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8614 ft. | # Of Holes: | 44 | Interval Bottom: | 8635 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | Y | Production Period 12/2023 - 11/2024 |
Total Oil Produced (Barrels) | 2 |
Total Gas Produced (MCF) | 43 |
GOR | 21500 |
GOR Determination | MCFE |
Average BOE per Day | 0.025 |
Average MCFE per Day | 0.150 |
Federal Financial Assurance | i | |
|
|