|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 2/1/2024 Measured TD: 9100 ft. Vertical TD: 8703 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 2/1/2024 | Wellbore Permit | DIRECTIONAL | Permit #: | 20073719 | Expiration Date: | 7/10/2008 | Proposed Top PZ Location: | Sec: Twp: | Footage: 1912 FNL 1852 FWL | Bottom Hole Location: | Sec:2 Twp: 1S 68W | Footage: 1912 FNL 1856 FWL | Proposed Depth/Form: | 9100 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: S/2 NW | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: NW | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1236 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 375, Top: 0 ft., Bottom: 1236 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 9093 ft., Weight: 11 , Citings Type: PLANNED | Cement: | Sacks: 280, Top: 7380 ft., Bottom: 9093 ft. | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4950 ft., Weight: , Citings Type: PLANNED | Cement: | Sacks: 150, Top: 4635 ft., Bottom: 4950 ft. |
| | |
Wellbore Completed | Completion Date: | 7/19/2005 | Spud Date: | 7/9/2005 | Spud Date Is: | ACTUAL | Measured TD: | 9100 ft. | Measured PB depth: | 9078 ft. | True Vertical TD: | 8703 ft. | True Vertical PB depth: | 8681 ft. | Top PZ Location: | Sec: Twp: | Footage: 1912 FNL 1852 FWL | Bottom Hole Location: | Sec:2 Twp: 1S 68W | Footage: 1912 N 1856 W | Log Types: | DIL/GL/GR, CDL/CNL/GR. CBL/CCL/GR | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1236 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 375, Top: 0 ft., Bottom: 1236 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 9093 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 280, Top: 7380 ft., Bottom: 9093 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5880 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 290, Top: 4380 ft., Bottom: 5880 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | NIOBRARA | 7970 ft. | | N | N | CODELL | 8408 ft. | | N | N | MOWRY | 8824 ft. | | N | N | DAKOTA | 9009 ft. | | N | N |
Formation DKTA Formation Classification: OW Status: SI - 2/1/2024 Interval Top: 9008 ft. Interval Bottom: 9040 ft. Completed Information for Formation DAKOTA | 1st Production Date: | N/A | Choke Size: | | Formation Name: | DAKOTA | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 8/19/2005 | Treatment Summary: | FRAC W/ 48,050 LBS SAND & 814 BBLS GELLED WATER. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 30 | CASING_PRESS | 1300 |
| Perforation Data: | Interval Top: | 9008 ft. | # Of Holes: | 48 | Interval Bottom: | 9040 ft. | Hole Size: | 0.42 in. |
|
Formation JSND Formation Classification: OW Status: SI - 2/1/2024 Interval Top: 8854 ft. Interval Bottom: 8864 ft. Completed Information for Formation J SAND | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 7/24/2007 | Treatment Summary: | Frac J-Sand Formation w/ 3906 bbls treated water, 300,000 # Sand |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8833 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8854 ft. | # Of Holes: | 40 | Interval Bottom: | 8864 ft. | Hole Size: | 0.42 in. |
|
Formation DKNCD Formation Classification: OW Status: CM - 10/7/2011 Interval Top: 7976 ft. Interval Bottom: 9040 ft. Completed Information for Formation DAKOTA-CODELL-NIOBRARA | 1st Production Date: | 12/24/2005 | Choke Size: | 0.219 in. | Formation Name: | DAKOTA-CODELL-NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 7/19/2005 | Treatment Summary: | COMMINGLE DAKOTA,CODELL, AND NIOBRARA. COMBINED TEST PER PHONE CONVERSATION WITH BOB BLEVINS, 7/6/2007. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8942 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 12/24/2005 | Test Method: | GAGUE | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 30 | BBLS_OIL | 81 | CALC_BBLS_H2O | 30 | CALC_BBLS_OIL | 81 | CALC_GOR | 2580 | CALC_MCF_GAS | 2009 | CASING_PRESS | 1300 | MCF_GAS | 209 | TUBING_PRESS | 400 |
| Perforation Data: | Interval Top: | 7976 ft. | # Of Holes: | 160 | Interval Bottom: | 9040 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: OW Status: SI - 2/1/2024 Interval Top: 7976 ft. Interval Bottom: 8422 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 8/30/2005 | Treatment Summary: | STAGE 1 - 245,260# SAND & 4302 BBLS GELLED WATER. STAGE 2 - 245,240# SAND & 3,242 BBLS GELLED WATER. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7976 ft. | # Of Holes: | 112 | Interval Bottom: | 8422 ft. | Hole Size: | 0.42 in. |
|
Formation DKJNC Formation Classification: OW Status: CM - 3/1/2013 Interval Top: 7676 ft. Interval Bottom: 9040 ft. Completed Information for Formation DAKOTA-J-NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | DAKOTA-J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8833 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 3/1/2013 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 1 | BTU_GAS | 1278 | CALC_BBLS_OIL | 1 | CALC_GOR | 67000 | CALC_MCF_GAS | 67 | GRAVITY_OIL | 49 | MCF_GAS | 67 |
| Perforation Data: | Interval Top: | 7676 ft. | # Of Holes: | 210 | Interval Bottom: | 9040 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | Y | Production Period 12/2023 - 11/2024 |
Total Oil Produced (Barrels) | 2 |
Total Gas Produced (MCF) | 8 |
GOR | 4000 |
GOR Determination | BOE |
Average BOE per Day | 0.011 |
Average MCFE per Day | 0.054 |
Federal Financial Assurance | i | |
|
|