Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-09472
Well Classification: GW Status: PA - 6/19/2024
Well Name/No:TIPPERARY #34-8
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:VERDAD RESOURCES LLC - 10651
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date6/19/2024
FacilityID:268227LocationID:320496
County:ADAMS #001Location:SWSE 8 1S65W 6
Field:WATTENBERG - #90750Elevation:5118 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:562FSL  1979 FELLat/Long: 39.973920 / -104.685565Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.973936 / -104.685519Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: AB - 6/19/2024             Measured TD: 8300 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        AB - 6/19/2024
Wellbore Permit
Permit #:Expiration Date:8/11/2004
Proposed Depth/Form:8300 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407;407-66, Unit Acreage: 320, Drill Unit: S/2
Formation And Spacing:Code: DSND , Formation: D SAND , Order: , Unit Acreage: 320, Drill Unit: S/2
Formation And Spacing:Code: GRNHN , Formation: GREENHORN , Order: 318A , Unit Acreage: 320, Drill Unit: S/2
Formation And Spacing:Code: GRRS , Formation: GRANEROS , Order: 318A , Unit Acreage: 320, Drill Unit: S/2
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232;318A , Unit Acreage: 320, Drill Unit: S/2
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407;407-66, Unit Acreage: 320, Drill Unit: S/2
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1441 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 525, Top: 0 ft., Bottom: 1441 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8305 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 335, Top: 6500 ft., Bottom: 8305 ft.

Wellbore Completed
Completion Date:7/10/2003
Spud Date:6/23/2003Spud Date Is:ACTUAL
Measured TD:8300 ft.Measured PB depth:
True Vertical TD:True Vertical PB depth:
Log Types:CBL, ARRAY INDUCTION, GR, CN
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1441 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 525, Top: 0 ft., Bottom: 1441 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8305 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 335, Top: 6500 ft., Bottom: 8305 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4748 ft.NN
NIOBRARA7121 ft.NN
FORT HAYS7526 ft.NN
CODELL7554 ft.NN
GREENHORN7621 ft.NN
GRANEROS7825 ft.NN
D SAND7928 ft.NN
MOWRY7975 ft.NN
J SAND7986 ft.NN
J-2 SAND8005 ft.NN
SKULL CREEK8094 ft.NN
DAKOTA8170 ft.NN

Formation LKTA                     Formation Classification:  GW                     Status:  AB - 6/19/2024                 Interval Top: 8226 ft.    Interval Bottom: 8239 ft.

 Completed Information for Formation LAKOTA
1st Production Date:N/AChoke Size:0.250 in.
Formation Name:LAKOTACommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:7/10/2003
Treatment Summary:PERF THE LAKOTA FROM 8226'-8230' W/ 4 SPF. RIH W/ TBG & PKR. SET PKR @ 8200'. SWAB
Tubing Size:2.375 in.Tubing Setting Depth:8200 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/23/2003Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 2
BBLS_OIL 0
CALC_BBLS_H2O 2
CALC_BBLS_OIL 0
CALC_MCF_GAS 199
CASING_PRESS 85
MCF_GAS 199
Perforation Data:
Interval Top:8226 ft.# Of Holes:16
Interval Bottom:8239 ft.Hole Size:

Formation JSND                     Formation Classification:  GW                     Status:  AB - 6/19/2024                 Interval Top: 7992 ft.    Interval Bottom: 8036 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size:0.250 in.
Formation Name:J SANDCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:7/10/2003
Treatment Summary:REL PKR. POOH.SET CIBP 8200'. PERF'D THE J SAND F/7992'-7996',8018'-8020',8023'-8028',8035'- 8036' W/4 SPF. FRAC'D W/178,374 GAL SLICK WATER CONTAINING 124,788# 20/40 SAND. FLOW BACK WELL. RIGH W/PROD.TBG. LAND EOT@7977'. SWAB IN WELL.
Tubing Size:2.375 in.Tubing Setting Depth:7977 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/10/2003Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 1
CALC_BBLS_H2O 0
CALC_BBLS_OIL 1
CALC_GOR 112000
CALC_MCF_GAS 112
CASING_PRESS 85
MCF_GAS 112
Perforation Data:
Interval Top:7992 ft.# Of Holes:48
Interval Bottom:8036 ft.Hole Size:0.38 in.

Formation GRRS                     Formation Classification:  GW                     Status:  AB - 6/19/2024                 Interval Top: 7880 ft.    Interval Bottom: 7920 ft.

 Completed Information for Formation GRANEROS
1st Production Date:N/AChoke Size: 
Formation Name:GRANEROSCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:7/10/2003
Treatment Summary:SET CIBP @ 7980'. PLACE 1 SK OF CMT ON CIBP. SET SECONG CIBP@7960'. PLACE 1 SK OF CMT ON CIBP, PERF'D THE GRANEROS F/7880'-7920' W/SPF. FRAC'D W/227,350 GAL SLICK WATER W/68,380# 100-MESH&47,320# 20/40 SAND. FLOW BACK FRAC. RIH W/PROD.TBG. LAND EOT@7854'
Tubing Size:2.375 in.Tubing Setting Depth:7854 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/14/2003Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 2
BBLS_OIL 0
CALC_BBLS_H2O 2
CALC_BBLS_OIL 0
CALC_GOR 0
CALC_MCF_GAS 0
CASING_PRESS 1310
MCF_GAS 0
TUBING_PRESS 520
Perforation Data:
Interval Top:7880 ft.# Of Holes:160
Interval Bottom:7920 ft.Hole Size:0.32 in.

Formation GRNHN                   Formation Classification:  GW                   Status:  AB - 6/19/2024                 Interval Top: 7728 ft.    Interval Bottom: 7763 ft.

 Completed Information for Formation GREENHORN
1st Production Date:N/AChoke Size: 
Formation Name:GREENHORNCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:7/10/2003
Treatment Summary:SET CIBP @ 7850'. PLACE 3/4 SK OF CMT ON PLUG. PERF'D THE GREENHORN FROM 7728' - 7763' W/4 SPF.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/16/2003Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_GOR 0
CALC_MCF_GAS 0
CASING_PRESS 13100
MCF_GAS 0
TUBING_PRESS 520
Perforation Data:
Interval Top:7728 ft.# Of Holes:140
Interval Bottom:7763 ft.Hole Size:0.35 in.

Formation LKT-J                   Formation Classification:  GW                   Status:  CM - 12/27/2003                Interval Top: 7158 ft.    Interval Bottom: 8230 ft.

 Completed Information for Formation LAKOTA - J SAND
1st Production Date:N/AChoke Size: 
Formation Name:LAKOTA - J SANDCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:7/10/2003
Treatment Summary:DRILLED OUT CIBP'S. RIH W/PRODUCTION TBG. LAND EOT @ 7983'. SWAB.
Tubing Size:2.375 in.Tubing Setting Depth:7983 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/27/2003Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_GOR 0
CALC_MCF_GAS 1
CASING_PRESS 1350
MCF_GAS 1
TUBING_PRESS 520
Perforation Data:
Interval Top:7158 ft.# Of Holes:620
Interval Bottom:8230 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  GW                     Status:  AB - 6/19/2024                 Interval Top: 7158 ft.    Interval Bottom: 7380 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:7/10/2003
Treatment Summary:SET CIBP@7685'. DUMP 1 SX CMT ON CIBP. PERF'D THE NIOBRARA FROM 7348'-7380',7158'-7190' W/4 SPF. FRAC'D W/314,126 GAL SLICK WATER W/151,140# 20/40 SAND. RIH W/TBG. LAND TBG @ 7155'. SWAB
Tubing Size:2.375 in.Tubing Setting Depth:7155 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/13/2003Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_GOR 0
CALC_MCF_GAS 0
CASING_PRESS 1310
MCF_GAS 0
TUBING_PRESS 520
Perforation Data:
Interval Top:7158 ft.# Of Holes:256
Interval Bottom:7380 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY06/19/2024
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No