|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 12/1/2018 Measured TD: 8669 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 12/1/2018 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 10/20/2010 | | Proposed Depth/Form: | 8669 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | STATE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: 499 , Unit Acreage: 320, Drill Unit: N2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: N2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: NW4 |
| | |
| Wellbore Completed | | Completion Date: | 2/18/2002 | | Spud Date: | 10/18/2001 | Spud Date Is: | ACTUAL | | Measured TD: | 8669 ft. | Measured PB depth: | 8636 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | PEAILC, PECNLD, PEML, CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1171 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 820, Top: 0 ft., Bottom: 1171 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8666 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 350, Top: 6990 ft., Bottom: 8666 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5320 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 150, Top: 4850 ft., Bottom: 5321 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4874 ft. | | N | N | | NIOBRARA | 7521 ft. | | N | N | | FORT HAYS | 7935 ft. | | N | N | | CODELL | 7958 ft. | | N | N | | J SAND | 8388 ft. | | N | N | | DAKOTA | 8567 ft. | | N | N |
Formation DKTA Formation Classification: GW Status: AB - 12/1/2018 Interval Top: 8567 ft. Interval Bottom: 8600 ft.| Completed Information for Formation DAKOTA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | DAKOTA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/29/2011 | | Treatment Summary: | REMOVED CIBP SET @ 8340-8342 TO COMMINGLE DKTA AND JSND WITH NB/CD | | Formation Treatment | | Treatment Date: | 2/10/2010 | | Treatment Summary: | CIBP SET @ 8340 WITH 2 SACKS OF CEMENT FOR MECHANICAL INTEGRITY. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 3 | | CALC_BBLS_H2O | 9 | | CALC_BBLS_OIL | 3 | | CALC_GOR | 25333 | | CALC_MCF_GAS | 76 | | CASING_PRESS | 950 | | GRAVITY_OIL | 60 | | MCF_GAS | 76 | | TUBING_PRESS | 925 |
| | Perforation Data: | | Interval Top: | 8567 ft. | # Of Holes: | 57 | | Interval Bottom: | 8600 ft. | Hole Size: | 0.38 in. |
|
Formation DK-J Formation Classification: GW Status: CM - 8/31/2006 Interval Top: 8397 ft. Interval Bottom: 8600 ft.| Completed Information for Formation DAKOTA-JSND | | 1st Production Date: | 7/28/2006 | Choke Size: | 1.000 in. | | Formation Name: | DAKOTA-JSND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/18/2002 | | Treatment Summary: | COMMINGLE DK-J, DRILL OUT CIBP @ 8540; IB 7/17/2006 JSND PERFS; 4/2002 8397-8434 DKTA PERFS; 11/2001 8667-8600 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8522 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/31/2006 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| CALC_BBLS_OIL | 3 | | CALC_GOR | 59333 | | CALC_MCF_GAS | 178 | | CASING_PRESS | 580 | | GRAVITY_OIL | 54 | | TUBING_PRESS | 460 |
| | Perforation Data: | | Interval Top: | 8397 ft. | # Of Holes: | | | Interval Bottom: | 8600 ft. | Hole Size: | |
|
Formation JSND Formation Classification: GW Status: AB - 12/1/2018 Interval Top: 8397 ft. Interval Bottom: 8431 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/29/2011 | | Treatment Summary: | REMOVED CIBP SET @ 8340-8342 TO COMMINGLE DKTA AND JSND WITH NB/CD | | Formation Treatment | | Treatment Date: | 2/11/2010 | | Treatment Summary: | CIBP SET @ 8305 WITH 2 SACKS OF CEMENT FOR MECHANICAL INTEGRITY. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 5 | | CALC_BBLS_OIL | 5 | | CALC_GOR | 53800 | | CALC_MCF_GAS | 269 | | CASING_PRESS | 395 | | GRAVITY_OIL | 60 | | MCF_GAS | 269 | | TUBING_PRESS | 205 |
| | Perforation Data: | | Interval Top: | 8397 ft. | # Of Holes: | 84 | | Interval Bottom: | 8431 ft. | Hole Size: | 0.38 in. |
|
Formation DKJNC Formation Classification: OW Status: CM - 9/20/2011 Interval Top: 7534 ft. Interval Bottom: 7724 ft.| Completed Information for Formation DAKOTA-J-NIOBRARA-CODELL | | 1st Production Date: | 9/6/2011 | Choke Size: | | | Formation Name: | DAKOTA-J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/29/2011 | | Treatment Summary: | REMOVED CIBP SET @ 8340-8342 TO COMMINGLE DKTA AND JSND WITH NB/CD |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/20/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 18 | | BTU_GAS | 1336 | | CALC_BBLS_OIL | 18 | | CALC_GOR | 7611 | | CALC_MCF_GAS | 137 | | CASING_PRESS | 883 | | GRAVITY_OIL | 42 | | MCF_GAS | 137 |
| | Perforation Data: | | Interval Top: | 7534 ft. | # Of Holes: | 69 | | Interval Bottom: | 7724 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 5/22/2018 Interval Top: 7534 ft. Interval Bottom: 7978 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 3/2/2010 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/16/2010 | | Treatment Summary: | NB PERF 7534-7812 HOLES 60@.42. CD PERF 7960-7978 HOLES 54@.38. FRAC NB W/ 500 GAL 15% HCL & 231172 GAL SW & 201480 # 40/70 SAND & 4000 # 20/40 SB EXCEL. FRAC CD W/192192 GAL SW & 150820 # 40/70 SAND & 4000 # 20/40 SB EXCEL. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BTU_GAS | 1430 | | CALC_BBLS_OIL | 79 | | CALC_GOR | 1405 | | CALC_MCF_GAS | 111 | | CASING_PRESS | 1000 | | GRAVITY_OIL | 46 |
| | Perforation Data: | | Interval Top: | 7534 ft. | # Of Holes: | 123 | | Interval Bottom: | 7978 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 12/01/2018 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|