|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 12/1/2018 Measured TD: 8669 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 12/1/2018 | Wellbore Permit | | Permit #: | | Expiration Date: | 10/20/2010 | Proposed Depth/Form: | 8669 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | STATE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: 499 , Unit Acreage: 320, Drill Unit: N2 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: N2 | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: NW4 |
| | |
Wellbore Completed | Completion Date: | 2/18/2002 | Spud Date: | 10/18/2001 | Spud Date Is: | ACTUAL | Measured TD: | 8669 ft. | Measured PB depth: | 8636 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | PEAILC, PECNLD, PEML, CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1171 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 820, Top: 0 ft., Bottom: 1171 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8666 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 350, Top: 6990 ft., Bottom: 8666 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5320 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 150, Top: 4850 ft., Bottom: 5321 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4874 ft. | | N | N | NIOBRARA | 7521 ft. | | N | N | FORT HAYS | 7935 ft. | | N | N | CODELL | 7958 ft. | | N | N | J SAND | 8388 ft. | | N | N | DAKOTA | 8567 ft. | | N | N |
Formation DKTA Formation Classification: GW Status: AB - 12/1/2018 Interval Top: 8567 ft. Interval Bottom: 8600 ft. Completed Information for Formation DAKOTA | 1st Production Date: | N/A | Choke Size: | | Formation Name: | DAKOTA | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 8/29/2011 | Treatment Summary: | REMOVED CIBP SET @ 8340-8342 TO COMMINGLE DKTA AND JSND WITH NB/CD | Formation Treatment | Treatment Date: | 2/10/2010 | Treatment Summary: | CIBP SET @ 8340 WITH 2 SACKS OF CEMENT FOR MECHANICAL INTEGRITY. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_OIL | 3 | CALC_BBLS_H2O | 9 | CALC_BBLS_OIL | 3 | CALC_GOR | 25333 | CALC_MCF_GAS | 76 | CASING_PRESS | 950 | GRAVITY_OIL | 60 | MCF_GAS | 76 | TUBING_PRESS | 925 |
| Perforation Data: | Interval Top: | 8567 ft. | # Of Holes: | 57 | Interval Bottom: | 8600 ft. | Hole Size: | 0.38 in. |
|
Formation DK-J Formation Classification: GW Status: CM - 8/31/2006 Interval Top: 8397 ft. Interval Bottom: 8600 ft. Completed Information for Formation DAKOTA-JSND | 1st Production Date: | 7/28/2006 | Choke Size: | 1.000 in. | Formation Name: | DAKOTA-JSND | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 2/18/2002 | Treatment Summary: | COMMINGLE DK-J, DRILL OUT CIBP @ 8540; IB 7/17/2006 JSND PERFS; 4/2002 8397-8434 DKTA PERFS; 11/2001 8667-8600 |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8522 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 8/31/2006 | Test Method: | FLOWING | Hours Tested: | | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
CALC_BBLS_OIL | 3 | CALC_GOR | 59333 | CALC_MCF_GAS | 178 | CASING_PRESS | 580 | GRAVITY_OIL | 54 | TUBING_PRESS | 460 |
| Perforation Data: | Interval Top: | 8397 ft. | # Of Holes: | | Interval Bottom: | 8600 ft. | Hole Size: | |
|
Formation JSND Formation Classification: GW Status: AB - 12/1/2018 Interval Top: 8397 ft. Interval Bottom: 8431 ft. Completed Information for Formation J SAND | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J SAND | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 8/29/2011 | Treatment Summary: | REMOVED CIBP SET @ 8340-8342 TO COMMINGLE DKTA AND JSND WITH NB/CD | Formation Treatment | Treatment Date: | 2/11/2010 | Treatment Summary: | CIBP SET @ 8305 WITH 2 SACKS OF CEMENT FOR MECHANICAL INTEGRITY. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_OIL | 5 | CALC_BBLS_OIL | 5 | CALC_GOR | 53800 | CALC_MCF_GAS | 269 | CASING_PRESS | 395 | GRAVITY_OIL | 60 | MCF_GAS | 269 | TUBING_PRESS | 205 |
| Perforation Data: | Interval Top: | 8397 ft. | # Of Holes: | 84 | Interval Bottom: | 8431 ft. | Hole Size: | 0.38 in. |
|
Formation DKJNC Formation Classification: OW Status: CM - 9/20/2011 Interval Top: 7534 ft. Interval Bottom: 7724 ft. Completed Information for Formation DAKOTA-J-NIOBRARA-CODELL | 1st Production Date: | 9/6/2011 | Choke Size: | | Formation Name: | DAKOTA-J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 8/29/2011 | Treatment Summary: | REMOVED CIBP SET @ 8340-8342 TO COMMINGLE DKTA AND JSND WITH NB/CD |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 9/20/2011 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 18 | BTU_GAS | 1336 | CALC_BBLS_OIL | 18 | CALC_GOR | 7611 | CALC_MCF_GAS | 137 | CASING_PRESS | 883 | GRAVITY_OIL | 42 | MCF_GAS | 137 |
| Perforation Data: | Interval Top: | 7534 ft. | # Of Holes: | 69 | Interval Bottom: | 7724 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 5/22/2018 Interval Top: 7534 ft. Interval Bottom: 7978 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 3/2/2010 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 2/16/2010 | Treatment Summary: | NB PERF 7534-7812 HOLES 60@.42. CD PERF 7960-7978 HOLES 54@.38. FRAC NB W/ 500 GAL 15% HCL & 231172 GAL SW & 201480 # 40/70 SAND & 4000 # 20/40 SB EXCEL. FRAC CD W/192192 GAL SW & 150820 # 40/70 SAND & 4000 # 20/40 SB EXCEL. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BTU_GAS | 1430 | CALC_BBLS_OIL | 79 | CALC_GOR | 1405 | CALC_MCF_GAS | 111 | CASING_PRESS | 1000 | GRAVITY_OIL | 46 |
| Perforation Data: | Interval Top: | 7534 ft. | # Of Holes: | 123 | Interval Bottom: | 7978 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | Y | 12/01/2018 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|