Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-09383
Well Classification: GW Status: PR - 6/1/2017
Well Name/No:BOX ELDER #32-20
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:VERDAD RESOURCES LLC - 10651
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/1/2017
FacilityID:203823LocationID:320462
County:ADAMS #001Location:SWNE 20 1S65W 6
Field:WATTENBERG - #90750Elevation:5172 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1980FNL  2080 FELLat/Long: 39.952350 / -104.685895Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.952368 / -104.685955Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 6/1/2017             Measured TD: 8314 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 6/1/2017
Wellbore Permit
Permit #:20031769 Expiration Date:9/25/2004
Proposed Depth/Form:8322 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 80, Drill Unit: W/2NE
Formation And Spacing:Code: GRNHN , Formation: GREENHORN , Order: 318A , Unit Acreage: 80, Drill Unit: W/2NE
Formation And Spacing:Code: GRRS , Formation: GRANEROS , Order: 318A , Unit Acreage: 80, Drill Unit: W/2NE
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 318A , Unit Acreage: 320, Drill Unit: E/2
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 80, Drill Unit: W/2NE

Wellbore Completed
Completion Date:7/20/2003
Spud Date:6/28/2003Spud Date Is:ACTUAL
Measured TD:8314 ft.Measured PB depth:8277 ft.
True Vertical TD:True Vertical PB depth:
Log Types:COMPENSATED NEUTRON, CBL, GR, ARRY INDUCTION
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1561 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 570, Top: 0 ft., Bottom: 1561 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8292 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 6610 ft., Bottom: 8292 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4818 ft.NN
NIOBRARA7182 ft.NN
FORT HAYS7584 ft.NN
CODELL7609 ft.NN
BENTONITE7886 ft.NN
D SAND7990 ft.NN
MOWRY8035 ft.NN
J SAND8046 ft.NN
J-2 SAND8062 ft.NN
SKULL CREEK8155 ft.NN
DAKOTA8230 ft.NN

Formation DKTA                     Formation Classification:  GW                     Status:  AB - 7/18/2003                 Interval Top: 8238 ft.    Interval Bottom: 8252 ft.

 Completed Information for Formation DAKOTA
1st Production Date:7/18/2003Choke Size: 
Formation Name:DAKOTACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/20/2003
Treatment Summary:PERF'D THE DAKOTA FROM 8238'-8242' & 8247'-8252' W/4 SPF. PU PKR&TBG. SET PKR @ 8205'. SWAB TEST THE DAKOTA. FRAC'D THE DKTA W/40,000# 20/40 SAND. 10,000# 20/40 ACFRAC PR-6000 AND 6,000# 100 MESH SAND. SWAB, MOVE UP TO THE J SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation DKTA.
Perforation Data:
Interval Top:8238 ft.# Of Holes:36
Interval Bottom:8252 ft.Hole Size:0.45 in.

Formation JSND                     Formation Classification:  GW                     Status:  PR - 6/1/2017                  Interval Top: 8048 ft.    Interval Bottom: 8092 ft.

 Completed Information for Formation J SAND
1st Production Date:8/11/2003Choke Size: 
Formation Name:J SANDCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:7/20/2003
Treatment Summary:SET CIBP @ 8210', PERF THE J SAND FROM 8048'-8092'. FRAC'D W/196,000 GAL SLICK WATER CONTAINING 161,240# 20/40 SAND. TIH W/PROD TBG. SWAB.
Tubing Size:2.375 in.Tubing Setting Depth:8040 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/18/2003Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 55
BBLS_OIL 9
CALC_GOR 36222
CASING_PRESS 820
MCF_GAS 326
TUBING_PRESS 460
Perforation Data:
Interval Top:8048 ft.# Of Holes:44
Interval Bottom:8092 ft.Hole Size:0.45 in.

Formation GRRS                     Formation Classification:  GW                     Status:  PR - 6/1/2017                  Interval Top: 7940 ft.    Interval Bottom: 7975 ft.

 Completed Information for Formation GRANEROS
1st Production Date:11/9/2003Choke Size: 
Formation Name:GRANEROSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/20/2003
Treatment Summary:SET CIBP@8030'. PLACE 1 SX OF CMT ON PLUG. PERF'D THE GRANEROS FROM 7940'-7975' W/4 SPF. FRAC'D W/228,900 GAL SLICK WATER W/68,760# 100 MESH AND 46.620# 20/40 SAND. RIH W/PROD. TBG. LAND @ 7920'. SWAB.
Tubing Size:2.375 in.Tubing Setting Depth:7920 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/9/2003Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CASING_PRESS 600
MCF_GAS 0
TUBING_PRESS 207
Perforation Data:
Interval Top:7940 ft.# Of Holes:140
Interval Bottom:7975 ft.Hole Size:0.32 in.

Formation GRNHN                   Formation Classification:  GW                   Status:  SI - 1/13/2015                 Interval Top: 7782 ft.    Interval Bottom: 7816 ft.

 Completed Information for Formation GREENHORN
1st Production Date:11/3/2003Choke Size: 
Formation Name:GREENHORNCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:7/20/2003
Treatment Summary:SET CIBP@7900'. PERF'D THE GREENHORN FROM 7782'-7816' W/4 SPF. FRAC'D W/315,630 GAL SLICK WATER CONTAINING 150,700# 20/40 SAND. RIH W/PROD.TBG. LAND TBG@7757'. SWAB.
Tubing Size:2.375 in.Tubing Setting Depth:7757 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/3/2003Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 2
CALC_GOR 5500
CASING_PRESS 600
MCF_GAS 11
TUBING_PRESS 207
Perforation Data:
Interval Top:7782 ft.# Of Holes:126
Interval Bottom:7816 ft.Hole Size:0.38 in.

Formation JNBRR                   Formation Classification:  GW                   Status:  CM - 11/9/2003                 Interval Top: 7210 ft.    Interval Bottom: 8092 ft.

 Completed Information for Formation J-NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/20/2003
Treatment Summary:DRILL OUT CIBP @ 7730', 7900', 8030'. DID NOT DRILL CIBP ABOVE DAKOTA. POOH, TIH / PRODUCTION TBG. LAND EOT @ 8034'. BROACH TO SN. SWAB.
Tubing Size:2.375 in.Tubing Setting Depth:8034 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/9/2003Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 21
BBLS_OIL 11
CALC_GOR 16091
CASING_PRESS 600
MCF_GAS 177
TUBING_PRESS 207
Perforation Data:
Interval Top:7210 ft.# Of Holes:550
Interval Bottom:8092 ft.Hole Size:0.35 in.

Formation NBRR                     Formation Classification:  GW                     Status:  PR - 8/1/2024                  Interval Top: 7210 ft.    Interval Bottom: 7430 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:7/20/2003
Treatment Summary:SET CIBP @ 7730'. PLACE 1 SX OF CMT ON PLUG. PERF'D THE NIOBRARA FROM 7210' - 7240', 7400', - 7430' W/4 SPF,
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/17/2003Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 2
CALC_GOR 5500
CASING_PRESS 600
MCF_GAS 11
TUBING_PRESS 207
Perforation Data:
Interval Top:7210 ft.# Of Holes:240
Interval Bottom:7430 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)203
Total Gas Produced (MCF)7279
GOR35857
GOR DeterminationMCFE
Average BOE per Day4.273
Average MCFE per Day24.802

 Federal Financial Assurance  i 

 Tribal Well  i No