|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 11/26/2018 Measured TD: 8500 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 11/26/2018 | Wellbore Permit | | Permit #: | | Expiration Date: | 1/6/2011 | Proposed Depth/Form: | 8500 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: DK-J , Formation: DAKOTA-JSND , Order: 499 , Unit Acreage: 320, Drill Unit: W2 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: W2 | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: SW/4 |
| | |
Wellbore Completed | Completion Date: | 1/9/1997 | Spud Date: | 12/13/1996 | Spud Date Is: | ACTUAL | Measured TD: | 8500 ft. | Measured PB depth: | 8414 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | PHASOR INDUCTION-SFL W/LINEAR CORRELATION, CBL, COMPENSATED NEUTRON LITHO-DENSITY | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1200 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 720, Top: 0 ft., Bottom: 1215 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8496 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 315, Top: 7040 ft., Bottom: 8496 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL | Cement: | Sacks: 175, Top: 4390 ft., Bottom: 4990 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | FOX HILLS | 400 ft. | | | | SUSSEX | 4850 ft. | | | | SHANNON | 5485 ft. | | | | NIOBRARA | 7455 ft. | | | | CODELL | 7905 ft. | | | | MUDDY J | 8332 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 11/8/2018 Interval Top: 8348 ft. Interval Bottom: 8378 ft. Completed Information for Formation J SAND | 1st Production Date: | 1/25/1999 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 9/1/2011 | Treatment Summary: | REMOVED SAND PLUG @ 8198-8200 TO COMMINGLE JSND WITH NB/CD | Formation Treatment | Treatment Date: | 2/15/2010 | Treatment Summary: | SET SAND PLUG @ 8198' FOR MECHANICAL INTEGRITY. OUR INTENT IS TO DRILL OUT THE PLUG AND COMMINGLE THE WELL IN THE NEXT SIX MONTHS. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 67 | BBLS_OIL | 5 | CALC_GOR | 7400 | CASING_PRESS | 2000 | MCF_GAS | 37 | TUBING_PRESS | 650 |
| Perforation Data: | Interval Top: | 8348 ft. | # Of Holes: | 120 | Interval Bottom: | 8378 ft. | Hole Size: | 0.38 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 9/19/2011 Interval Top: 7472 ft. Interval Bottom: 8378 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 9/8/2011 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 9/1/2011 | Treatment Summary: | REMOVED SAND PLUG @ 8198-8200 TO COMMINGLE JSND WITH NB/CD |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 9/19/2011 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 8 | BTU_GAS | 1336 | CALC_BBLS_OIL | 8 | CALC_GOR | 2000 | CALC_MCF_GAS | 19 | CASING_PRESS | 807 | GRAVITY_OIL | 42 | MCF_GAS | 19 |
| Perforation Data: | Interval Top: | 7472 ft. | # Of Holes: | 222 | Interval Bottom: | 8378 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 11/8/2018 Interval Top: 7472 ft. Interval Bottom: 7928 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 3/8/2010 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 2/24/2010 | Treatment Summary: | NB PERF 7472-7768 HOLES 58 SIZE 0.38. CD PERF 7906-7928 HOLES 44 SIZE 0.38. FRAC NB W/500 GAL 15% HCL & 171,280 GAL DYNAFLOW 2 HYBRID W/252,520# 20/40 & 4,000# SUPER LC. FRAC CD W/120,670 GAL DYNAFLOW 2 W/252,420# 20/40 & 4,000# 20/40 SUPER LC. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BTU_GAS | 1430 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 22 | CALC_GOR | 5455 | CALC_MCF_GAS | 120 | CASING_PRESS | 750 | GRAVITY_OIL | 47 |
| Perforation Data: | Interval Top: | 7472 ft. | # Of Holes: | 102 | Interval Bottom: | 7928 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
Reported Plugged | Y | 11/26/2018 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|