|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 1/29/2024 Measured TD: 8173 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 1/29/2024 | | Wellbore Permit | | | Permit #: | 19950314 | Expiration Date: | 9/24/1995 | | Proposed Depth/Form: | 8230 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | STATE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 160, Drill Unit: NW4 |
| | |
| Wellbore Completed | | Completion Date: | 7/15/1995 | | Spud Date: | 5/26/1995 | Spud Date Is: | ACTUAL | | Measured TD: | 8173 ft. | Measured PB depth: | 8133 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | DIL-GR, LDT-CNL-GR, ML-GR LOGNET | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1549 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 1390, Top: 0 ft., Bottom: 1549 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8173 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 365, Top: 6620 ft., Bottom: 8173 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 5016 ft. | | | Y | | NIOBRARA | 7164 ft. | | | | | CODELL | 7592 ft. | | | | | D SAND | 7947 ft. | | | | | J SAND | 8006 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 1/29/2024 Interval Top: 8008 ft. Interval Bottom: 8048 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 7/15/1995 | Choke Size: | | | Formation Name: | J SAND | Commingled: | | | Production Method: | PUMPING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 7/15/1995 | | Treatment Summary: | 300,000# 20/40 SAND; 2,156 BBLS SATURN III GEL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8008 ft. | # Of Holes: | | | Interval Bottom: | 8048 ft. | Hole Size: | |
|
Formation DJSND Formation Classification: GW Status: CM - 7/15/1995 Interval Top: 7948 ft. Interval Bottom: 8048 ft.| Completed Information for Formation D & J SAND | | 1st Production Date: | 7/15/1995 | Choke Size: | | | Formation Name: | D & J SAND | Commingled: | | | Production Method: | PUMPING | | Open Hole Completion: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8102 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/6/1995 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 8 | | BBLS_OIL | 30 | | CALC_GOR | 6900 | | CASING_PRESS | 85 | | GRAVITY_OIL | 38 | | MCF_GAS | 207 | | TUBING_PRESS | 85 |
| | Perforation Data: | | Interval Top: | 7948 ft. | # Of Holes: | | | Interval Bottom: | 8048 ft. | Hole Size: | |
|
Formation DSND Formation Classification: GW Status: AB - 1/29/2024 Interval Top: 7948 ft. Interval Bottom: 7956 ft.| Completed Information for Formation D SAND | | 1st Production Date: | 7/15/1995 | Choke Size: | | | Formation Name: | D SAND | Commingled: | | | Production Method: | PUMPING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 7/15/1995 | | Treatment Summary: | 30,000# W/30,000# 20/40 ACFRAC VIKING I GEL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation DSND. |
| | Perforation Data: | | Interval Top: | 7948 ft. | # Of Holes: | | | Interval Bottom: | 7956 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 01/29/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|