|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 12/5/2018 Measured TD: 8536 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 12/5/2018 | Wellbore Permit | | Permit #: | 19921098 | Expiration Date: | 1/8/1995 | Bottom Hole Location: | Sec:9 Twp: 1S 67W | Footage: 1503 FNL 1133 FWL | Proposed Depth/Form: | 8511 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JNBCD , Formation: J-NIOBRARA-CODELL , Order: 407-66 , Unit Acreage: 320, Drill Unit: W2 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: W2 |
| | |
Wellbore Completed | Completion Date: | 2/3/1995 | Spud Date: | 12/19/1992 | Spud Date Is: | ACTUAL | Measured TD: | 8536 ft. | Measured PB depth: | 8494 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | CDL-DIL-CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 323 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 325, Top: 0 ft., Bottom: 323 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8530 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 370, Top: 7240 ft., Bottom: 8530 ft., Determination Method: CBL | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5313 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 685, Top: 4656 ft., Bottom: 5313 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | NIOBRARA | 7499 ft. | | | | CODELL | 7926 ft. | | | | J SAND | 8358 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 12/5/2018 Interval Top: 8367 ft. Interval Bottom: 8397 ft. Completed Information for Formation J SAND | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J SAND | Commingled: | No | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 2/3/1995 | Treatment Summary: | 3,508 35# & 30# GEL; 50 BBLS OIL; 8,000# 100 MESH; 400,000# 20/40 SAND; ISDP 1660# ATP 2950# AT 34.5 BPM |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 17 | BBLS_OIL | 10 | CALC_GOR | 64000 | CASING_PRESS | 1000 | GRAVITY_OIL | 59 | MCF_GAS | 640 | TUBING_PRESS | 775 |
| Perforation Data: | Interval Top: | 8367 ft. | # Of Holes: | 48 | Interval Bottom: | 8397 ft. | Hole Size: | 0.375 in. |
|
Formation CODL Formation Classification: GW Status: CM - 8/26/1994 Interval Top: 7930 ft. Interval Bottom: 7939 ft. Completed Information for Formation CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CODELL | Commingled: | | Production Method: | | Open Hole Completion: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7930 ft. | # Of Holes: | 9 | Interval Bottom: | 7939 ft. | Hole Size: | |
|
Formation FTHYS Formation Classification: GW Status: CM - 8/26/1994 Interval Top: 7910 ft. Interval Bottom: 7922 ft. Completed Information for Formation FORT HAYS | 1st Production Date: | N/A | Choke Size: | | Formation Name: | FORT HAYS | Commingled: | | Production Method: | | Open Hole Completion: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation FTHYS. |
| Perforation Data: | Interval Top: | 7910 ft. | # Of Holes: | 3 | Interval Bottom: | 7922 ft. | Hole Size: | |
|
Formation JNFHC Formation Classification: GW Status: CM - 2/10/1995 Interval Top: 7533 ft. Interval Bottom: 8397 ft. Completed Information for Formation J-NIOBRARA-FT HAYS-CODELL | 1st Production Date: | 2/7/1995 | Choke Size: | 0.219 in. | Formation Name: | J-NIOBRARA-FT HAYS-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | Yes |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8353 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 2/10/1995 | Test Method: | | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 11 | BBLS_OIL | 17 | CALC_GOR | 28882 | CASING_PRESS | 950 | GRAVITY_OIL | 47.8 | MCF_GAS | 491 | TUBING_PRESS | 575 |
| Perforation Data: | Interval Top: | 7533 ft. | # Of Holes: | 77 | Interval Bottom: | 8397 ft. | Hole Size: | |
|
Formation NBFHC Formation Classification: GW Status: AB - 12/5/2018 Interval Top: 7533 ft. Interval Bottom: 7939 ft. Completed Information for Formation NIOBRARA-FT HAYS-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA-FT HAYS-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 2/3/1995 | Treatment Summary: | 94,950 GAL GEL W/10,000# 100 MESH; 325,000# 20/40 SAND; SPEARHEAD W/750 GAL 10% HCL; ATP 3432# AT 32.5 BPM |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 2 | BBLS_OIL | 50 | CALC_GOR | 1400 | CASING_PRESS | 820 | MCF_GAS | 70 |
| Perforation Data: | Interval Top: | 7533 ft. | # Of Holes: | 29 | Interval Bottom: | 7939 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: GW Status: CM - 8/26/1994 Interval Top: 7533 ft. Interval Bottom: 7708 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | | Production Method: | | Open Hole Completion: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7533 ft. | # Of Holes: | 17 | Interval Bottom: | 7708 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | Y | 12/05/2018 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|