|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 9/22/2018 Measured TD: 8154 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 9/22/2018 | | Wellbore Permit | DRIFTED | | Permit #: | 19920260 | Expiration Date: | 7/5/1992 | | Proposed Depth/Form: | 8100 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E2 |
| | |
| Wellbore Completed | | Completion Date: | 4/26/1992 | | Spud Date: | 3/17/1992 | Spud Date Is: | ACTUAL | | Measured TD: | 8154 ft. | Measured PB depth: | 8127 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | DI-FL/GR; CNL-CDL W/HIGH RES | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 305 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 240, Top: 0 ft., Bottom: 305 ft., Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8149 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 7318 ft., Bottom: 8149 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 1462 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 425, Top: 338 ft., Bottom: 1488 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 7133 ft. | | | | | D SAND | 7934 ft. | | | | | J SAND | 7995 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 9/22/2018 Interval Top: 8015 ft. Interval Bottom: 8043 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 6/17/1992 | Choke Size: | 0.375 in. | | Formation Name: | J SAND | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 4/26/1992 | | Treatment Summary: | 300,000# 20/40 SAND |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7988 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/4/1992 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 11 | | CALC_GOR | 61636 | | CASING_PRESS | 440 | | MCF_GAS | 678 | | TUBING_PRESS | 250 |
| | Perforation Data: | | Interval Top: | 8015 ft. | # Of Holes: | 104 | | Interval Bottom: | 8043 ft. | Hole Size: | 0.4 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 09/22/2018 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|