|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 11/17/2018 Measured TD: 8492 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 11/17/2018 | | Wellbore Permit | | | Permit #: | 20001505 | Expiration Date: | 12/19/2001 | | Proposed Depth/Form: | 8500 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 160, Drill Unit: SE4 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 0 , Unit Acreage: 80, Drill Unit: W2SE | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 302 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 220, Top: 0 ft., Bottom: 302 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8042 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 508, Top: 6980 ft., Bottom: 8042 ft. | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 1215 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 375, Top: 60 ft., Bottom: 1215 ft. |
| | |
| Wellbore Completed | | Completion Date: | 9/17/1991 | | Spud Date: | 8/8/1991 | Spud Date Is: | ACTUAL | | Measured TD: | 8492 ft. | Measured PB depth: | 8469 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | GR, CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 302 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 220, Top: 0 ft., Bottom: 302 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8042 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 508, Top: 4470 ft., Bottom: 8042 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 1215 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 375, Top: 60 ft., Bottom: 1215 ft., Determination Method: | | Casing: | String Type: 1ST LINER, Hole Size: 3.75 in., Size: 2.875 in., Top: 0 ft., Depth: 8480 ft., Weight: 6.5 , Citings Type: ACTUAL | | Cement: | Sacks: 14, Top: 7764 ft., Bottom: 8480 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 1225 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 375, Top: 0 ft., Bottom: 1240 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4860 ft. | | N | N | | NIOBRARA | 7482 ft. | | N | N | | CODELL | 7924 ft. | | N | N | | J SAND | 8370 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 11/17/2018 Interval Top: 8370 ft. Interval Bottom: 8410 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 2/10/2001 | Choke Size: | 0.250 in. | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/17/1991 | | Treatment Summary: | 137,844 GALS IN 349,980# 20/40 |
| | Tubing Size: | 1.5 in. | Tubing Setting Depth: | 8352 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/29/2002 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 11 | | BBLS_OIL | 12 | | CALC_BBLS_H2O | 11 | | CALC_BBLS_OIL | 12 | | CALC_GOR | 18 | | CALC_MCF_GAS | 211 | | CASING_PRESS | 540 | | MCF_GAS | 211 | | TUBING_PRESS | 200 |
| | Perforation Data: | | Interval Top: | 8370 ft. | # Of Holes: | 70 | | Interval Bottom: | 8410 ft. | Hole Size: | 0.29 in. |
|
Formation CODL Formation Classification: GW Status: CM - 10/25/1991 Interval Top: 7681 ft. Interval Bottom: 7947 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 10/25/1991 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/17/1991 | | Treatment Summary: | 123,000 GALS IN 25,000# 100 MESH & 439,000# 20/40 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/25/1991 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 96 | | CALC_BBLS_OIL | 96 | | CALC_GOR | 1458 | | CALC_MCF_GAS | 140 | | MCF_GAS | 140 |
| | Perforation Data: | | Interval Top: | 7681 ft. | # Of Holes: | 13 | | Interval Bottom: | 7947 ft. | Hole Size: | 0.37 in. |
|
Formation J-CDL Formation Classification: GW Status: CM - 1/20/2003 Interval Top: 7681 ft. Interval Bottom: 8410 ft.| Completed Information for Formation J-CODELL | | 1st Production Date: | 8/22/2002 | Choke Size: | | | Formation Name: | J-CODELL | Commingled: | Yes | | Production Method: | FLOWING COMMINGLED | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/17/1991 | | Treatment Summary: | 123,000 GALS IN 25,000# 100 MESH & 439,000# 20/40 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/25/1991 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 96 | | CALC_BBLS_OIL | 96 | | CALC_GOR | 1458 | | CALC_MCF_GAS | 140 | | MCF_GAS | 140 |
| | Perforation Data: | | Interval Top: | 7681 ft. | # Of Holes: | 83 | | Interval Bottom: | 8410 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 11/17/2018 Interval Top: 7681 ft. Interval Bottom: 7947 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 10/25/1991 | Choke Size: | 0.000 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 9/17/1991 | | Treatment Summary: | SEE DOCUMENT # 305137 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/30/1991 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 96 | | CALC_BBLS_OIL | 96 | | CALC_GOR | 1458 | | CALC_MCF_GAS | 140 | | MCF_GAS | 140 |
| | Perforation Data: | | Interval Top: | 7681 ft. | # Of Holes: | 13 | | Interval Bottom: | 7947 ft. | Hole Size: | 0.37 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 1/24/1992 Interval Top: 7482 ft. Interval Bottom: 7947 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | No Perforation Data was found for formation NBRR. |
|
Formation NBCSX Formation Classification: GW Status: CM - 2/17/1993 Interval Top: 5088 ft. Interval Bottom: 7947 ft.| Completed Information for Formation NIOBRARA-CODELL-SUSSEX | | 1st Production Date: | 2/17/1993 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL-SUSSEX | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 9/17/1991 | | Treatment Summary: | SEE DOCUMENT # 305137 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/19/1993 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 5 | | BBLS_OIL | 24 | | CALC_BBLS_H2O | 5 | | CALC_BBLS_OIL | 24 | | CALC_GOR | 958 | | CALC_MCF_GAS | 23 | | CASING_PRESS | 50 | | MCF_GAS | 23 | | TUBING_PRESS | 150 |
| | Perforation Data: | | Interval Top: | 5088 ft. | # Of Holes: | 41 | | Interval Bottom: | 7947 ft. | Hole Size: | 0.37 in. |
|
Formation SUSX Formation Classification: GW Status: AB - 1/12/2001 Interval Top: 5088 ft. Interval Bottom: 5108 ft.| Completed Information for Formation SUSSEX | | 1st Production Date: | 7/10/2002 | Choke Size: | 0.156 in. | | Formation Name: | SUSSEX | Commingled: | No | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/17/1991 | | Treatment Summary: | 120,330 GALS, 22,000# 100 MESH, 116,500 12/20 & 208,000# 20/40 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/4/1992 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 21 | | BBLS_OIL | 50 | | CALC_BBLS_H2O | 21 | | CALC_BBLS_OIL | 50 | | CALC_GOR | 720 | | CALC_MCF_GAS | 36 | | CASING_PRESS | 200 | | MCF_GAS | 36 | | TUBING_PRESS | 200 |
| | Perforation Data: | | Interval Top: | 5088 ft. | # Of Holes: | 28 | | Interval Bottom: | 5108 ft. | Hole Size: | 0.37 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 11/17/2018 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|