Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-08859
Well Classification: GW Status: SI - 6/1/2018
Well Name/No:AMOCO #44-17
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date6/1/2018
FacilityID:203350LocationID:320283
County:ADAMS #001Location:S2SE 17 1S65W 6
Field:WATTENBERG - #90750Elevation:5144 ft.
Planned Location:990FSL  1320 FELLat/Long: 39.960500 / -104.683245Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.960580 / -104.682950Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 6/1/2018             Measured TD: 8130 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 6/1/2018
Wellbore Permit
Permit #:19880286 Expiration Date:7/31/1988
Proposed Depth/Form:8150 ft.
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: DJSND , Formation: D & J SAND , Order: , Unit Acreage: 320, Drill Unit: S2

Wellbore Completed
Completion Date:5/16/1988
Spud Date:4/20/1988Spud Date Is:ACTUAL
Measured TD:8130 ft.Measured PB depth:8065 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DUAL IND W/GR COMP DEN W/GR, CDL-VDL-GR
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 224 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 0 ft., Bottom: 224 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8129 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 65, Top: 7772 ft., Bottom: 8129 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 1458 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 120, Top: 853 ft., Bottom: 1460 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
FOX HILLS1140 ft.
SUSSEX4944 ft.
NIOBRARA7211 ft.
CODELL7564 ft.
D SAND7934 ft.
J SAND7990 ft.

Formation JSND                     Formation Classification:  GW                     Status:  SI - 6/1/2018                  Interval Top: 7992 ft.    Interval Bottom: 8030 ft.

 Completed Information for Formation J SAND
1st Production Date:6/4/1988Choke Size: 
Formation Name:J SANDCommingled:
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:5/16/1988
Treatment Summary:303,000# 20/40 M SAND; 3,019 BBLS GELLED 2% KCL WTR; AIR 32 BPM AT 3,000 PSI
Tubing Size:2.375 in.Tubing Setting Depth:7973 ft.
Tubing Packer Depth:7971 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/5/1988Test Method:FLOWING
Hours Tested:11Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 16
BBLS_OIL 0.92
CALC_BBLS_H2O 35
CALC_BBLS_OIL 2
CALC_GOR 289000
CALC_MCF_GAS 578
CASING_PRESS 500
GRAVITY_OIL 40
MCF_GAS 265
TUBING_PRESS 50
Perforation Data:
Interval Top:7992 ft.# Of Holes:34
Interval Bottom:8030 ft.Hole Size:0.38 in.
Primary Well Designation:
Reported Plugged      i
            All DesignationsDate
Reported PluggedY02/13/2025
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2029
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI )YDefined Inactive
05/31/2018
Low ProducingYProduction Period
12/2023 - 11/2024

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No