Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-08317
Well Classification: OW Status: SI - 3/1/2023
Well Name/No:WALKER ANN #2
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:RENEGADE OIL & GAS COMPANY LLC - 74165
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date3/1/2023
FacilityID:202912LocationID:320177
County:ADAMS #001Location:NWSW 29 2S62W 6
Field:WARLOCK - #90695Elevation:5215 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1980FSL  660 FWLLat/Long: 39.845313 / -104.355384Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.845250 / -104.355350Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 3/1/2023             Measured TD: 7367 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 3/1/2023
Wellbore Permit
Permit #:19831029 Expiration Date:12/31/1983
Proposed Depth/Form:7600 ft.
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 317 C, K , Unit Acreage: 40, Drill Unit: NWSW

Wellbore Completed
Completion Date:10/8/1983
Spud Date:8/19/1983Spud Date Is:ACTUAL
Measured TD:7367 ft.Measured PB depth:7245 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DIL-SFL, LDT-GR
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 252 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 180, Top: 0 ft., Bottom: , Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7367 ft., Weight: 10.5&11.6, Citings Type: ACTUAL
Cement:Sacks: 125, Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
NIOBRARA6431 ft.NN
CODELL6700 ft.NN
D SAND7208 ft.NN
J SAND7266 ft.NN

Formation JSND                     Formation Classification:  OW                     Status:  SI - 3/1/2023                  Interval Top: 7270 ft.    Interval Bottom: 7330 ft.

 Completed Information for Formation J SAND
1st Production Date:9/12/1983Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:PUMPING
Open Hole Completion:
Formation Treatment
Treatment Date:10/8/1983
Treatment Summary:SEE SCANNED DOCUMENT # 00347219
Tubing Size:2.375 in.Tubing Setting Depth:7345 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/14/1983Test Method:PUMPING
Hours Tested:24Gas Type:
Gas Disposal:VENTED
Test TypeMeasure
BBLS_H2O 16
BBLS_OIL 89
CALC_GOR 5011
GRAVITY_OIL 42.6
MCF_GAS 446
Perforation Data:
Interval Top:7270 ft.# Of Holes:62
Interval Bottom:7330 ft.Hole Size:

Formation DJSND                   Formation Classification:  OW                   Status:  CM - 6/28/1989                 Interval Top: 7212 ft.    Interval Bottom: 7330 ft.

 Completed Information for Formation D & J SAND
1st Production Date:6/28/1989Choke Size: 
Formation Name:D & J SANDCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:10/8/1983
Treatment Summary:SEE SCANNED DOCUMENT # 00347203
Tubing Size:2.375 in.Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/17/1989Test Method:PUMPING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 5
BBLS_OIL 7
CALC_GOR 7857
CASING_PRESS 35
GRAVITY_OIL 40
MCF_GAS 55
TUBING_PRESS 35
Perforation Data:
Interval Top:7212 ft.# Of Holes:78
Interval Bottom:7330 ft.Hole Size:

Formation DSND                     Formation Classification:  OW                     Status:  SI - 3/1/2023                  Interval Top: 7212 ft.    Interval Bottom: 7216 ft.

 Completed Information for Formation D SAND
1st Production Date:8/7/1984Choke Size: 
Formation Name:D SANDCommingled:Yes
Production Method:PUMPING
Open Hole Completion:
Formation Treatment
Treatment Date:10/8/1983
Treatment Summary:SEE SCANNED DOCUMENT # 00347202
Tubing Size:2.375 in.Tubing Setting Depth:7163 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/7/1984Test Method:PUMPING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 8
CALC_GOR 8125
CASING_PRESS 35
GRAVITY_OIL 40
MCF_GAS 65
TUBING_PRESS 35
Perforation Data:
Interval Top:7212 ft.# Of Holes:17
Interval Bottom:7216 ft.Hole Size:0.38 in.
Primary Well Designation:
Noticed Inactive      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveYNoticed Date
11/20/2025
Defined Inactive (SI)YLast Production
02/28/2023
Low ProducingYProduction Period
01/2025 - 12/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No