|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 3/1/2016 Measured TD: 8200 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 3/1/2016 | Wellbore Permit | | Permit #: | 19830301 | Expiration Date: | 3/29/1983 | Proposed Depth/Form: | 8200 ft. | Surface Mineral Owner Same: | Not available | Mineral Owner: | FEE | Surface Owner: | Not available | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 320, Drill Unit: E2 |
| | |
Wellbore Completed | Completion Date: | 6/1/1983 | Spud Date: | 4/11/1983 | Spud Date Is: | ACTUAL | Measured TD: | 8200 ft. | Measured PB depth: | 8156 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | DUAL INDUCTION-SFL, LITHODENSITY | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 250 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 250, Top: 0 ft., Bottom: , Determination Method: | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8200 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 300, Top: 0 ft., Bottom: , Determination Method: | Formation | Interval Top | Log Bottom | Cored | DSTs | FOX HILLS BASE | 1470 ft. | | | | SUSSEX | 4960 ft. | | | | NIOBRARA | 7216 ft. | | | | D SAND | 8014 ft. | | | | J SAND | 8061 ft. | | | |
Formation JSND Formation Classification: GW Status: PR - 3/1/2016 Interval Top: 8064 ft. Interval Bottom: 8098 ft. Completed Information for Formation J SAND | 1st Production Date: | 3/2/1984 | Choke Size: | | Formation Name: | J SAND | Commingled: | | Production Method: | FLOWING | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 6/1/1983 | Treatment Summary: | 1,000 GAL 7.5% NE ACID; 20,000 GAL PREPAD; 30,000 GAL PAD; 25,000# 100 MESH; 379,000# 20/40 SAND; 168,000 GAL VERSAGEL; 5,600 GAL KCL WTR; 48 TONS CO2 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 1/27/1984 | Test Method: | FLOWING | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
CALC_BBLS_OIL | 26 | CALC_GOR | 15.692 | CALC_MCF_GAS | 415 |
| Perforation Data: | Interval Top: | 8064 ft. | # Of Holes: | 15 | Interval Bottom: | 8098 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 122 |
Total Gas Produced (MCF) | 7671 |
GOR | 62877 |
GOR Determination | MCFE |
Average BOE per Day | 3.956 |
Average MCFE per Day | 22.935 |
Federal Financial Assurance | i | |
|
|