Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-08197
Well Classification: GW Status: SI - 10/1/2018
Well Name/No:BRADBURY #12-14
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:RENEGADE OIL & GAS COMPANY LLC - 74165
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:C-2936 A-F
Facility Status:SIStatus Date10/1/2018
FacilityID:202792LocationID:320138
County:ADAMS #001Location:SESW 12 2S60W 6
Field:BUCKSKIN EAST - #7686Elevation:4875 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:660FSL  1980 FWLLat/Long: 39.886374 / -104.049145Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.886240 / -104.049190Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/7/2013
End Date: 8/7/2013
Reported: 10/4/2013
Days to report: 58
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 10/1/2018             Measured TD: 6420 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 10/1/2018
Wellbore Permit
Permit #:19821467 Expiration Date:1/6/1983
Proposed Depth/Form:6400 ft.
Surface Mineral Owner Same:Not available
Mineral Owner:FEDERALSurface Owner:FEE
Unit: Unit Number:C-2936 A-F
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 40, Drill Unit: SESW

Wellbore Completed
Completion Date:2/22/1983
Spud Date:2/16/1983Spud Date Is:ACTUAL
Measured TD:6420 ft.Measured PB depth:6390 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CBL, CAL
Log Types:FDC-CNL-GR-CAL, DIL-SFL-SP, CBL-GR-CCL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 432 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 225, Top: 0 ft., Bottom: 432 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6411 ft., Weight: 10.5 , Citings Type: ACTUAL
Cement:Sacks: 230, Top: 5570 ft., Bottom: 6420 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 0 ft., Depth: 3000 ft., Bottom: 3000 ft., Sacks: 500, Method: 1 INCH
Additional Cement:String Type: 1ST , Top: 850 ft., Depth: 1060 ft., Bottom: 1100 ft., Sacks: 50, Method: SQUEEZE
Additional Cement:String Type: 1ST , Top: 3290 ft., Depth: 3625 ft., Bottom: 3625 ft., Sacks: 50, Method: SQUEEZE
FormationInterval TopLog BottomCoredDSTs
NIOBRARA5428 ft.
FORT HAYS5822 ft.
CARLILE5856 ft.
GREENHORN5906 ft.
GRANEROS6144 ft.
D SAND6255 ft.
HUNTSMAN6264 ft.
J SAND6297 ft.
SKULL CREEK6368 ft.

Formation JSND                     Formation Classification:  GW                     Status:  SI - 10/1/2018                 Interval Top: 6299 ft.    Interval Bottom: 6336 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/7/2013Treatment End Date:8/7/2013
Treatment Summary:Records indicate the well has never been fracture stimulated. Renegade purchased the well and repaired casing leaks. J sand was then fractured stimulated with 19,602 gallons crosslinked gelled water containing 15,220# 20/40 sand and 17,340# 18/40 Versaprop down 2-3/8" tubing at 13 BPM. Average pressure - 5250 psi. ISIP - 1420 psi. 5-min - 990 psi. 10-min - 580 psi. 15-min - 120 psi. Packer set at 5590' for frac (TOC @ 5570'). Small acid job was performed after the frac job and after one additional cement squeeze was done.
Total fluid used in treatment (bbls):467Max pressure during treatment (psi):5266
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):12Min frac gradient (psi/ft):0.66
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):479Disposition method For flowback:DISPOSAL
Total proppant used (lbs):32560Green completions techniques utilized:--
Reason green techniques Not utilized: PRESSURE
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
CALC_MCF_GAS 5230
MCF_GAS 5230
TUBING_PRESS 1000
Perforation Data:
Interval Top:6299 ft.# Of Holes:56
Interval Bottom:6336 ft.Hole Size:
Primary Well Designation:
Noticed Inactive      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveYNoticed Date
06/11/2023
Defined Inactive (SI )YDefined Inactive
05/31/2018
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No