|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 8/7/2019 Measured TD: 8763 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 8/7/2019 | Wellbore Permit | | Permit #: | 19820807 | Expiration Date: | 9/7/1982 | Prop Depth/Form: | 8500 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 80, Drill Unit: E2NW4 | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: , Unit Acreage: 160, Drill Unit: NW4 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 40, Drill Unit: NENW |
| | |
Wellbore Completed | Completion Date: | N/A | Spud Date: | 5/3/1982 | Spud Date Is: | ACTUAL | Measured TD: | 8763 ft. | Measured PB depth: | 8588 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | DILL, GR, CNR, FDC, SPECTROSCOPY | Log Types: | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 10.75 in., Top: 0 ft., Depth: 276 ft., Weight: 40.5 , Citings Type: ACTUAL | Cement: | Sacks: 250, Top: 0 ft., Bottom: 276 ft., Determination Method: | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 8709 ft., Weight: 17 , Citings Type: ACTUAL | Cement: | Sacks: 260, Top: 6740 ft., Bottom: 8709 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5484 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 222, Top: 4480 ft., Bottom: 5484 ft., Determination Method: CALC | Casing: | String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 2245 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 370, Top: 575 ft., Bottom: 2245 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.3, Hole Size: , Size: , Top: , Depth: 550 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 100, Top: 80 ft., Bottom: 550 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | J SAND | 8458 ft. | | | |
Formation DKTA Formation Classification: OW Status: AB - 1/17/2001 Interval Top: 8614 ft. Interval Bottom: 8624 ft. Completed Information for Formation DAKOTA | 1st Production Date: | 3/1/2000 | Choke Size: | | Formation Name: | DAKOTA | Commingled: | No | Production Method: | FLOW - PLUNGER | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 9/13/1982 | Treatment Summary: | FRAC DAKOTA W/23,490# OF 20/40 SAND + 8000# OF 20/40 ACFRAC BLACK, 32,550 GALLONS OF PHOENIX GE @ 16-18 BPM - ISIP 4448 |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8546 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 3/1/2000 | Test Method: | FLOW | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 2 | BTU_GAS | 1250 | CASING_PRESS | 335 | MCF_GAS | 2 | TUBING_PRESS | 210 |
| Perforation Data: | Interval Top: | 8614 ft. | # Of Holes: | 41 | Interval Bottom: | 8624 ft. | Hole Size: | 0.5 in. |
|
Formation JSND Formation Classification: OW Status: AB - 1/17/2001 Interval Top: 8458 ft. Interval Bottom: 8463 ft. Completed Information for Formation J SAND | 1st Production Date: | 12/1/1984 | Choke Size: | | Formation Name: | J SAND | Commingled: | | Production Method: | FLOWING | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 9/13/1982 | Treatment Summary: | 120,000 GALS GWX-07 FLUSH KCL WATER 300,000 BBLS 20/40 MESH SAND W/4012 PSI. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8378 ft. | Tubing Packer Depth: | 8378 ft. | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 10/5/1982 | Test Method: | FLOWING | Hours Tested: | 21 | Gas Type: | | Gas Disposal: | FLARED | |
Test Type | Measure |
---|
BBLS_H2O | 41.3 | BBLS_OIL | 13 | CALC_GOR | 39385 | CALC_MCF_GAS | 512 | GRAVITY_OIL | 56 | TUBING_PRESS | 625 |
| Perforation Data: | Interval Top: | 8458 ft. | # Of Holes: | | Interval Bottom: | 8463 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: OW Status: CM - 4/30/2008 Interval Top: 8007 ft. Interval Bottom: 8026 ft. Completed Information for Formation CODELL | 1st Production Date: | 2/6/2001 | Choke Size: | 0.500 in. | Formation Name: | CODELL | Commingled: | No | Production Method: | PLUNGER LIFT | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 9/13/1982 | Treatment Summary: | APR 2004 FRACTURE STIMULATION: TIP SCREENOUT WITH ONLY 64K OTTAWA 20/40 DURING 3 PPG JOB. DISPLACED BUT HAD SAND BRIDGE IN TUBING. CODELL ZONE OPEN. RBP SET @ 8290' W/2 SX CMT CAP ISOLATING J SAND AND DAKOTA FORMATIONS. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7984 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 2/6/2001 | Test Method: | TEST SEPARATOR | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 5 | BBLS_OIL | 149 | BTU_GAS | 1259 | CALC_GOR | 2248 | CASING_PRESS | 2000 | GRAVITY_OIL | 45 | MCF_GAS | 335 | TUBING_PRESS | 1000 |
| Perforation Data: | Interval Top: | 8007 ft. | # Of Holes: | 72 | Interval Bottom: | 8026 ft. | Hole Size: | 0.34 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 8/7/2019 Interval Top: 7612 ft. Interval Bottom: 8026 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 4/1/2005 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | | Production Method: | PLUNGER 500 | Open Hole Completion: | No |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7612 ft. | # Of Holes: | 243 | Interval Bottom: | 8026 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 4/30/2008 Interval Top: 7612 ft. Interval Bottom: 7865 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 12/9/2004 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | PUMP | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 9/13/1982 | Treatment Summary: | FRAC NIOBRARA FORMATION WITH 1,000 GALS 15% HCL AND 28,000 GALS FR WATER, SHUT DOWN, PACKER FAILURE. RE-FRAC WITH 39,000 GALS FR WATER, 93,550 GALS SILVERSTIM FLUID, 250,540 LBS 20/40 SAND, AIR 23.8 BPM, AIR 5,888 PSI, ISIP 3,888 PSI. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7589 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 12/9/2004 | Test Method: | PUMP | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 36 | BBLS_OIL | 15 | BTU_GAS | 1339 | CALC_GOR | 5867 | CASING_PRESS | 500 | GRAVITY_OIL | 44.3 | MCF_GAS | 88 | TUBING_PRESS | 400 |
| Perforation Data: | Interval Top: | 7612 ft. | # Of Holes: | 171 | Interval Bottom: | 7865 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|