Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-07988
Well Classification: OW Status: SI - 7/1/2018
Well Name/No:CHAMPLIN 248 AMOCO C #4
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:RENEGADE OIL & GAS COMPANY LLC - 74165
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date7/1/2018
FacilityID:202583LocationID:320093
County:ADAMS #001Location:SESW 33 2S64W 6
Field:RADAR - #71300Elevation:5428 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:660FSL  1980 FWLLat/Long: 39.827632 / -104.557470Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.827880 / -104.557540Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 7/1/2018             Measured TD: 8260 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 7/1/2018
Wellbore Permit
Permit #:19811813 Expiration Date:2/13/1982
Proposed Depth/Form:8200 ft.
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: DJSND , Formation: D & J SAND , Order: 0 , Unit Acreage: 80, Drill Unit: E2SW

Wellbore Completed
Completion Date:6/11/1983
Spud Date:10/21/1982Spud Date Is:ACTUAL
Measured TD:8260 ft.Measured PB depth:8211 ft.
True Vertical TD:0 ft.True Vertical PB depth:
Log Types: SP-IES FDC-GR CALIPER
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 209 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 0 ft., Bottom: , Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 8260 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 220, Top: 0 ft., Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
MUDDY D8042 ft.
MUDDY J8100 ft.

Formation JSND                     Formation Classification:  GW                     Status:  SI - 7/1/2018                  Interval Top: 8152 ft.    Interval Bottom: 8166 ft.

 Completed Information for Formation J SAND
1st Production Date:12/12/1981Choke Size:0.281 in.
Formation Name:J SANDCommingled:
Production Method:ROD PUMP
Open Hole Completion:
Formation Treatment
Treatment Date:6/11/1983
Treatment Summary:SEE SCANNED DOCUMENT #00370249
Tubing Size:2.875 in.Tubing Setting Depth:8228 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/15/1981Test Method:PUMPING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 131
CALC_BBLS_OIL 131
CALC_GOR 1908
CALC_MCF_GAS 250
GRAVITY_OIL 40.9
MCF_GAS 250
Perforation Data:
Interval Top:8152 ft.# Of Holes:40
Interval Bottom:8166 ft.Hole Size:0.41 in.

Formation DJSND                   Formation Classification:  GW                   Status:  CM - 6/11/1983                 Interval Top: 8056 ft.    Interval Bottom: 8118 ft.

 Completed Information for Formation D & J SAND
1st Production Date:12/12/1981Choke Size:1.000 in.
Formation Name:D & J SANDCommingled:
Production Method:PUMPING
Open Hole Completion:
Formation Treatment
Treatment Date:6/11/1983
Treatment Summary:SEE SCANNED DOCUMENT #00370258
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/11/1983Test Method:PUMPING
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 6
BBLS_OIL 9
CALC_BBLS_H2O 6
CALC_BBLS_OIL 9
CALC_GOR 12555
CALC_MCF_GAS 113
GRAVITY_OIL 42
MCF_GAS 113
Perforation Data:
Interval Top:8056 ft.# Of Holes:112
Interval Bottom:8118 ft.Hole Size:0.41 in.

Formation DSND                     Formation Classification:  GW                     Status:  SI - 6/1/2018

 Completed Information for Formation D SAND
1st Production Date:N/AChoke Size: 
Formation Name:D SANDCommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation DSND.
No Perforation Data was found for formation DSND.
Primary Well Designation:
Noticed Inactive      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveYNoticed Date
02/12/2024
Defined Inactive (SI )YDefined Inactive
06/30/2018
Low ProducingYProduction Period
10/2024 - 09/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No