Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-07984
Well Classification: GW Status: SI - 10/1/2018
Well Name/No:HOWLAND #2
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:RENEGADE OIL & GAS COMPANY LLC - 74165
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date10/1/2018
FacilityID:202579LocationID:320089
County:ADAMS #001Location:SWNE 25 2S60W 6
Field:DEER TRAIL - #16200Elevation:4871 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2300FNL  2030 FELLat/Long: 39.849355 / -104.045234Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.849150 / -104.045030Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/29/2016
End Date: 7/29/2016
Reported: 8/3/2016
Days to report: 5
Disclosure: Sidetrack #00
Start Date: 8/20/2016
End Date: 8/20/2016
Reported: 8/22/2016
Days to report: 2
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 10/1/2018             Measured TD: 6330 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 10/1/2018
Wellbore Permit
Permit #:19811801 Expiration Date:2/13/1982
Proposed Depth/Form:6350 ft.
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 160, Drill Unit: NE4

Wellbore Completed
Completion Date:11/3/1981
Spud Date:10/26/1981Spud Date Is:ACTUAL
Measured TD:6330 ft.Measured PB depth:6293 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CBL
Log Types:
Log Types:DIL, FDC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 207 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 190, Top: 0 ft., Bottom: 207 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6284 ft., Weight: 10.5 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 5124 ft., Bottom: 6284 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 0 ft., Depth: 2000 ft., Bottom: 2005 ft., Sacks: 300, Method: DV TOOL
Additional Cement:String Type: 1ST , Top: 2263 ft., Depth: 2379 ft., Bottom: 2379 ft., Sacks: 100, Method: SQUEEZE
FormationInterval TopLog BottomCoredDSTs
NIOBRARA5360 ft.
FORT HAYS5748 ft.
CODELL5782 ft.
CARLILE5796 ft.
GREENHORN5853 ft.
X BENTONITE6082 ft.
BENTONITE6082 ft.
D SAND6179 ft.
J SAND6228 ft. Y

Formation JSND                     Formation Classification:  GW                     Status:  SI - 10/1/2018                 Interval Top: 6231 ft.    Interval Bottom: 6242 ft.

 Completed Information for Formation J SAND
1st Production Date:11/13/1981Choke Size: 
Formation Name:J SANDCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/20/2016Treatment End Date:8/20/2016
Treatment Summary:Fracture stimulated J Sand with 410 barrels crosslinked gel containing 27,000# 16/30 sand at 17 BPM down 2-7/8" frac string at 4400 psi. ISIP-930 psi. Formation treatment was made necessary as an earlier treament resulted in a casing leak. Well was not fractured prior to this work.
Total fluid used in treatment (bbls):410Max pressure during treatment (psi):4912
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.58
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):410Disposition method For flowback:
Total proppant used (lbs):27000Green completions techniques utilized:--
Reason green techniques Not utilized: PRESSURE
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/29/2016Treatment End Date:7/29/2016
Treatment Summary:Fracture stimulated J Sand with 454 barrels crosslinked gelled water containing 25,500# 16/30 sand at approximately 20 BPM and 1400 psi. ISIP-1040 psi. The job was performed down the well's 4 1/2" casing string. Pressure data and subsequent findings indicated that a hole in the casing found at 2379' after the frac likely took a significant amount of the treatment. Repairs were made and another treatment down tubing was performed.
Total fluid used in treatment (bbls):454Max pressure during treatment (psi):2700
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.60
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):110
Fresh water used in treatment (bbls):454Disposition method For flowback:DISPOSAL
Total proppant used (lbs):25500Green completions techniques utilized:No
Reason green techniques Not utilized: PRESSURE
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
CALC_MCF_GAS 941
CASING_PRESS 185
MCF_GAS 941
TUBING_PRESS 95
Perforation Data:
Interval Top:6231 ft.# Of Holes:24
Interval Bottom:6242 ft.Hole Size:
Primary Well Designation:
Noticed Inactive      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveYNoticed Date
06/11/2023
Defined Inactive (SI )YDefined Inactive
05/31/2018
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No