Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-07984
Well Classification: GW Status: SI - 10/1/2018
Well Name/No:HOWLAND #2
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:RENEGADE OIL & GAS COMPANY LLC - 74165
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date10/1/2018
FacilityID:202579LocationID:320089
County:ADAMS #001Location:SWNE 25 2S60W 6
Field:DEER TRAIL - #16200Elevation:4871 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2300FNL  2030 FELLat/Long: 39.849355 / -104.045234Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.849150 / -104.045030Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/29/2016
End Date: 7/29/2016
Reported: 8/3/2016
Days to report: 5
Disclosure: Sidetrack #00
Start Date: 8/20/2016
End Date: 8/20/2016
Reported: 8/22/2016
Days to report: 2
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 10/1/2018             Measured TD: 6330 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 10/1/2018
Wellbore Permit
Permit #:19811801 Expiration Date:2/13/1982
Proposed Depth/Form:6350 ft.
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 160, Drill Unit: NE4

Wellbore Completed
Completion Date:11/3/1981
Spud Date:10/26/1981Spud Date Is:ACTUAL
Measured TD:6330 ft.Measured PB depth:6293 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CBL
Log Types:
Log Types:DIL, FDC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 207 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 190, Top: 0 ft., Bottom: 207 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6284 ft., Weight: 10.5 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 5124 ft., Bottom: 6284 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 0 ft., Depth: 2000 ft., Bottom: 2005 ft., Sacks: 300, Method: DV TOOL
Additional Cement:String Type: 1ST , Top: 2263 ft., Depth: 2379 ft., Bottom: 2379 ft., Sacks: 100, Method: SQUEEZE
FormationInterval TopLog BottomCoredDSTs
NIOBRARA5360 ft.
FORT HAYS5748 ft.
CODELL5782 ft.
CARLILE5796 ft.
GREENHORN5853 ft.
X BENTONITE6082 ft.
BENTONITE6082 ft.
D SAND6179 ft.
J SAND6228 ft. Y

Formation JSND                     Formation Classification:  GW                     Status:  SI - 10/1/2018                 Interval Top: 6231 ft.    Interval Bottom: 6242 ft.

 Completed Information for Formation J SAND
1st Production Date:11/13/1981Choke Size: 
Formation Name:J SANDCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/20/2016Treatment End Date:8/20/2016
Treatment Summary:Fracture stimulated J Sand with 410 barrels crosslinked gel containing 27,000# 16/30 sand at 17 BPM down 2-7/8" frac string at 4400 psi. ISIP-930 psi. Formation treatment was made necessary as an earlier treament resulted in a casing leak. Well was not fractured prior to this work.
Total fluid used in treatment (bbls):410Max pressure during treatment (psi):4912
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.58
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):410Disposition method For flowback:
Total proppant used (lbs):27000Green completions techniques utilized:--
Reason green techniques Not utilized: PRESSURE
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/29/2016Treatment End Date:7/29/2016
Treatment Summary:Fracture stimulated J Sand with 454 barrels crosslinked gelled water containing 25,500# 16/30 sand at approximately 20 BPM and 1400 psi. ISIP-1040 psi. The job was performed down the well's 4 1/2" casing string. Pressure data and subsequent findings indicated that a hole in the casing found at 2379' after the frac likely took a significant amount of the treatment. Repairs were made and another treatment down tubing was performed.
Total fluid used in treatment (bbls):454Max pressure during treatment (psi):2700
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.60
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):110
Fresh water used in treatment (bbls):454Disposition method For flowback:DISPOSAL
Total proppant used (lbs):25500Green completions techniques utilized:No
Reason green techniques Not utilized: PRESSURE
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
CALC_MCF_GAS 941
CASING_PRESS 185
MCF_GAS 941
TUBING_PRESS 95
Perforation Data:
Interval Top:6231 ft.# Of Holes:24
Interval Bottom:6242 ft.Hole Size:
Primary Well Designation:
Noticed Inactive      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveYNoticed Date
06/11/2023
Defined Inactive (SI )YDefined Inactive
05/31/2018
Low ProducingYProduction Period
07/2024 - 06/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
July 2024 - June 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No