Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-07980
Well Classification: GW Status: PA - 8/15/2018
Well Name/No:KALLSEN 32-9 #2
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date8/15/2018
FacilityID:202575LocationID:320086
County:ADAMS #001Location:SWNE 9 1S65W 6
Field:WATTENBERG - #90750Elevation:5133 ft.
Planned Location:1650FNL  1650 FELLat/Long: 39.982200 / -104.665425Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.982290 / -104.665470Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 8/15/2018             Measured TD: 8078 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 8/15/2018
Wellbore Permit
Permit #:19811767 Expiration Date:2/9/1982
Proposed Depth/Form:8075 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 

Wellbore Completed
Completion Date:12/15/1981
Spud Date:11/11/1981Spud Date Is:ACTUAL
Measured TD:8078 ft.Measured PB depth:8038 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DIL/GR, FDC/CNL/GR, CCL/GR/CBL/VDL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 203 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 0 ft., Bottom: 203 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 8078 ft., Weight: 15.5 & 17, Citings Type: ACTUAL
Cement:Sacks: 175, Top: 7150 ft., Bottom: 8078 ft., Determination Method: CALC
Casing:String Type: STAGE TOOL, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 1253 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 1000, Top: 1212 ft., Bottom: 1260 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
FOX HILLS BASE1200 ft.
NIOBRARA7072 ft.
FORT HAYS7482 ft.
CODELL7508 ft.
BENTONITE7780 ft.
D SAND7884 ft.
HUNTSMAN7900 ft.
J SAND7948 ft.
SKULL CREEK7982 ft.

Formation JSND                     Formation Classification:  GW                     Status:  AB - 8/15/2018                 Interval Top: 7950 ft.    Interval Bottom: 7980 ft.

 Completed Information for Formation J SAND
1st Production Date:1/9/1982Choke Size: 
Formation Name:J SANDCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:12/15/1981
Treatment Summary:115,000 GALS VERSAGEL 1500; 174,000# 20/40 SAND;
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:7950 ft.# Of Holes:34
Interval Bottom:7980 ft.Hole Size:

Formation DJSND                   Formation Classification:  GW                   Status:  CM - 9/23/1982                 Interval Top: 7888 ft.    Interval Bottom: 7980 ft.

 Completed Information for Formation D & J SAND
1st Production Date:1/9/1982Choke Size: 
Formation Name:D & J SANDCommingled:
Production Method:
Open Hole Completion:
Tubing Size:2.875 in.Tubing Setting Depth:7814 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/23/1982Test Method:PLUNGER 500
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 30
CALC_GOR 8000
MCF_GAS 240
Perforation Data:
Interval Top:7888 ft.# Of Holes:49
Interval Bottom:7980 ft.Hole Size:

Formation DSND                     Formation Classification:  GW                     Status:  AB - 8/15/2018                 Interval Top: 7888 ft.    Interval Bottom: 7895 ft.

 Completed Information for Formation D SAND
1st Production Date:1/9/1982Choke Size: 
Formation Name:D SANDCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:12/15/1981
Treatment Summary:26,000 GALS YF4SPD; 36,000# 20/40 SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation DSND.
Perforation Data:
Interval Top:7888 ft.# Of Holes:15
Interval Bottom:7895 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY08/15/2018
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
April 2024 - March 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No