|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 8/15/2018 Measured TD: 8078 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 8/15/2018 | Wellbore Permit | | Permit #: | 19811767 | Expiration Date: | 2/9/1982 | Proposed Depth/Form: | 8075 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | Not available | Unit: | | Unit Number: | |
| | |
Wellbore Completed | Completion Date: | 12/15/1981 | Spud Date: | 11/11/1981 | Spud Date Is: | ACTUAL | Measured TD: | 8078 ft. | Measured PB depth: | 8038 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | DIL/GR, FDC/CNL/GR, CCL/GR/CBL/VDL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 203 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 200, Top: 0 ft., Bottom: 203 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 8078 ft., Weight: 15.5 & 17, Citings Type: ACTUAL | Cement: | Sacks: 175, Top: 7150 ft., Bottom: 8078 ft., Determination Method: CALC | Casing: | String Type: STAGE TOOL, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 1253 ft., Weight: 15.5 , Citings Type: ACTUAL | Cement: | Sacks: 1000, Top: 1212 ft., Bottom: 1260 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | FOX HILLS BASE | 1200 ft. | | | | NIOBRARA | 7072 ft. | | | | FORT HAYS | 7482 ft. | | | | CODELL | 7508 ft. | | | | BENTONITE | 7780 ft. | | | | D SAND | 7884 ft. | | | | HUNTSMAN | 7900 ft. | | | | J SAND | 7948 ft. | | | | SKULL CREEK | 7982 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 8/15/2018 Interval Top: 7950 ft. Interval Bottom: 7980 ft. Completed Information for Formation J SAND | 1st Production Date: | 1/9/1982 | Choke Size: | | Formation Name: | J SAND | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 12/15/1981 | Treatment Summary: | 115,000 GALS VERSAGEL 1500; 174,000# 20/40 SAND; |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 7950 ft. | # Of Holes: | 34 | Interval Bottom: | 7980 ft. | Hole Size: | |
|
Formation DJSND Formation Classification: GW Status: CM - 9/23/1982 Interval Top: 7888 ft. Interval Bottom: 7980 ft. Completed Information for Formation D & J SAND | 1st Production Date: | 1/9/1982 | Choke Size: | | Formation Name: | D & J SAND | Commingled: | | Production Method: | | Open Hole Completion: | |
| Tubing Size: | 2.875 in. | Tubing Setting Depth: | 7814 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 9/23/1982 | Test Method: | PLUNGER 500 | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 30 | CALC_GOR | 8000 | MCF_GAS | 240 |
| Perforation Data: | Interval Top: | 7888 ft. | # Of Holes: | 49 | Interval Bottom: | 7980 ft. | Hole Size: | |
|
Formation DSND Formation Classification: GW Status: AB - 8/15/2018 Interval Top: 7888 ft. Interval Bottom: 7895 ft. Completed Information for Formation D SAND | 1st Production Date: | 1/9/1982 | Choke Size: | | Formation Name: | D SAND | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 12/15/1981 | Treatment Summary: | 26,000 GALS YF4SPD; 36,000# 20/40 SAND |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation DSND. |
| Perforation Data: | Interval Top: | 7888 ft. | # Of Holes: | 15 | Interval Bottom: | 7895 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | Y | 08/15/2018 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|