|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 7/1/2018 Measured TD: 8180 ft. Vertical TD: 0 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 7/1/2018 | | Wellbore Permit | | | Permit #: | 19810966 | Expiration Date: | 10/3/1981 | | Proposed Depth/Form: | 8100 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: DJSND , Formation: D & J SAND , Order: 0 , Unit Acreage: 0, Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 7/13/1983 | | Spud Date: | 6/18/1981 | Spud Date Is: | ACTUAL | | Measured TD: | 8180 ft. | Measured PB depth: | 8154 ft. | | True Vertical TD: | 0 ft. | True Vertical PB depth: | | | Log Types: | SP-IES FDC-GR CALIPER | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 238 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 250, Top: 0 ft., Bottom: , Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 8180 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 0 ft., Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PIERRE | 2106 ft. | | | | | SUSSEX | 4860 ft. | | | | | SHANNON | 5262 ft. | | | | | NIOBRARA | 7210 ft. | | | | | CODELL | 7600 ft. | | | | | D SAND | 7980 ft. | | | | | J SAND | 8034 ft. | | | |
Formation JSND Formation Classification: GW Status: SI - 7/1/2018 Interval Top: 8084 ft. Interval Bottom: 8124 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 9/9/1981 | Choke Size: | 1.000 in. | | Formation Name: | J SAND | Commingled: | | | Production Method: | PUMPING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 7/13/1983 | | Treatment Summary: | SEE SCANNED DOCUMENT #00370219 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8058 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/9/1981 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 24 | | BBLS_OIL | 260 | | CALC_BBLS_H2O | 24 | | CALC_BBLS_OIL | 260 | | CALC_GOR | 1192 | | CALC_MCF_GAS | 310 | | GRAVITY_OIL | 44.4 | | MCF_GAS | 310 |
| | Perforation Data: | | Interval Top: | 8084 ft. | # Of Holes: | 160 | | Interval Bottom: | 8124 ft. | Hole Size: | 0.41 in. |
|
Formation DJSND Formation Classification: GW Status: CM - 8/31/1983 Interval Top: 7986 ft. Interval Bottom: 8002 ft.| Completed Information for Formation D & J SAND | | 1st Production Date: | 12/8/1982 | Choke Size: | 1.000 in. | | Formation Name: | D & J SAND | Commingled: | | | Production Method: | PUMPING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 7/13/1983 | | Treatment Summary: | SEE SCANNED DOCUMENT #00370218 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/31/1983 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 1 | | BBLS_OIL | 24 | | CALC_BBLS_H2O | 1 | | CALC_BBLS_OIL | 24 | | CALC_GOR | 10250 | | CALC_MCF_GAS | 246 | | GRAVITY_OIL | 40.8 | | MCF_GAS | 246 |
| | Perforation Data: | | Interval Top: | 7986 ft. | # Of Holes: | 64 | | Interval Bottom: | 8002 ft. | Hole Size: | 0.41 in. |
|
Formation DSND Formation Classification: GW Status: SI - 6/1/2018 Interval Top: 7980 ft. Interval Bottom: 8002 ft.| Completed Information for Formation D SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | D SAND | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation DSND. |
| | No Perforation Data was found for formation DSND. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | Y | Noticed Date 02/12/2024 |
| Defined Inactive (SI ) | Y | Defined Inactive 06/30/2018 |
| Low Producing | Y | Production Period 10/2024 - 09/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|