|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 12/1/2025 Measured TD: 7800 ft. Vertical TD: 0 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 12/1/2025 | | Wellbore Permit | | | Permit #: | 19810268 | Expiration Date: | 6/20/1981 | | Proposed Depth/Form: | 7800 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: DSND , Formation: D SAND , Order: 0 , Unit Acreage: 40, Drill Unit: SWSE |
| | |
| Wellbore Completed | | Completion Date: | 6/18/1981 | | Spud Date: | 2/9/1981 | Spud Date Is: | ACTUAL | | Measured TD: | 7800 ft. | Measured PB depth: | 7757 ft. | | True Vertical TD: | 0 ft. | True Vertical PB depth: | | | Log Types: | SP-IES, FDC-GR CALIPER LOG | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 231 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 250, Top: 0 ft., Bottom: , Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 7800 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 0 ft., Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | FOX HILLS BASE | 1070 ft. | | | | | FOX HILLS | 1070 ft. | | | | | SUSSEX | 4450 ft. | | | | | SHANNON | 4760 ft. | | | | | NIOBRARA | 6760 ft. | | | | | CODELL | 7304 ft. | | | | | BENTONITE | 7480 ft. | | | | | D SAND | 7572 ft. | | | | | J SAND | 7638 ft. | | | |
Formation JSND Formation Classification: OW Status: PR - 12/1/2025 Interval Top: 7890 ft. Interval Bottom: 7895 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 7/15/1989 | Choke Size: | | | Formation Name: | J SAND | Commingled: | | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 6/18/1981 | | Treatment Summary: | SEE SCANNED DOCUMENT #00319086 |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 7562 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/20/1989 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 3 | | CALC_BBLS_OIL | 3 | | CALC_MCF_GAS | 80 | | CASING_PRESS | 145 | | MCF_GAS | 80 | | TUBING_PRESS | 40 |
| | Perforation Data: | | Interval Top: | 7890 ft. | # Of Holes: | 20 | | Interval Bottom: | 7895 ft. | Hole Size: | |
|
Formation DSND Formation Classification: OW Status: PR - 12/1/2025 Interval Top: 7574 ft. Interval Bottom: 7584 ft.| Completed Information for Formation D SAND | | 1st Production Date: | 7/7/1981 | Choke Size: | 1.000 in. | | Formation Name: | D SAND | Commingled: | | | Production Method: | PUMPING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 6/18/1981 | | Treatment Summary: | SEE SCANNED DOCUMENT #00319087 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7756 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/6/1981 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 1 | | BBLS_OIL | 79 | | CALC_BBLS_H2O | 1 | | CALC_BBLS_OIL | 79 | | CALC_GOR | 1560 | | CALC_MCF_GAS | 123 | | GRAVITY_OIL | 44.8 | | MCF_GAS | 123 |
| | Perforation Data: | | Interval Top: | 7574 ft. | # Of Holes: | 40 | | Interval Bottom: | 7584 ft. | Hole Size: | 0.41 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 2 |
| Total Gas Produced (MCF) | 252 |
| GOR | 126000 |
| GOR Determination | MCFE |
| Average BOE per Day | 0.122 |
| Average MCFE per Day | 0.718 |
| Federal Financial Assurance | i | |
|
|