|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 1/1/2019 Measured TD: 7932 ft. Vertical TD: 7932 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 1/1/2019 | | Wellbore Permit | | | Permit #: | 19820548 | Expiration Date: | 7/31/1982 | | Proposed Depth/Form: | 7600 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | STATE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: DSND , Formation: D SAND , Order: 0 , Unit Acreage: 0, Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 4/27/1982 | | Spud Date: | 4/16/1982 | Spud Date Is: | ACTUAL | | Measured TD: | 7932 ft. | Measured PB depth: | 7888 ft. | | True Vertical TD: | 7932 ft. | True Vertical PB depth: | | | Log Types: | IND-SFL, GR-CBL, CFD | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 217 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 170, Top: 0 ft., Bottom: 217 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7917 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 250, Top: 6840 ft., Bottom: 7917 ft., Determination Method: CALC | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 1358 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 0, Top: 1358 ft., Bottom: 1358 ft., Determination Method: CALC | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: 4.5 in., Top: , Depth: 1358 ft., Weight: , Citings Type: HISTORICAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 6920 ft. | | | | | FORT HAYS | 7345 ft. | | | | | CARLILE | 7382 ft. | | | | | GREENHORN | 7427 ft. | | | | | BENTONITE | 7663 ft. | | | | | D SAND | 7764 ft. | | | |
Formation DSND Formation Classification: GW Status: SI - 1/1/2019 Interval Top: 7768 ft. Interval Bottom: 7774 ft.| Completed Information for Formation D SAND | | 1st Production Date: | 6/3/1982 | Choke Size: | 0.000 in. | | Formation Name: | D SAND | Commingled: | | | Production Method: | PUMPING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 4/27/1982 | | Treatment Summary: | SEE SCANNED DOCUMENT #00319428 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7748 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/9/1982 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | VENTED | |
| Test Type | Measure |
|---|
| BBLS_OIL | 35 | | CALC_BBLS_OIL | 35 | | CALC_GOR | 2686 | | CASING_PRESS | 425 | | GRAVITY_OIL | 42.4 | | MCF_GAS | 94 |
| | Perforation Data: | | Interval Top: | 7768 ft. | # Of Holes: | 19 | | Interval Bottom: | 7774 ft. | Hole Size: | 3.125 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI ) | Y | Defined Inactive 09/30/2018 |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|