|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 4/1/2024 Measured TD: 7809 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 4/1/2024 | | Wellbore Permit | | | Permit #: | 19801817 | Expiration Date: | 4/11/1981 | | Proposed Depth/Form: | 7900 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | |
| | |
| Wellbore Completed | | Completion Date: | 12/23/1980 | | Spud Date: | 12/16/1980 | Spud Date Is: | ACTUAL | | Measured TD: | 7809 ft. | Measured PB depth: | | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CBL-GR; CAL | | Log Types: | GR-CORRELATION | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 7.875 in., Top: 0 ft., Depth: 229 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 240, Top: 0 ft., Bottom: 229 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7796 ft., Weight: 10.5/11.6, Citings Type: ACTUAL | | Cement: | Sacks: 150, Top: 6970 ft., Bottom: 7796 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 3520 ft., Depth: 3825 ft., Bottom: 3835 ft., Sacks: 200, Method: SQUEEZE | | Additional Cement: | String Type: 1ST , Top: 0 ft., Depth: 1372 ft., Bottom: 1330 ft., Sacks: 100, Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | FOX HILLS | 1222 ft. | | N | N | | FOX HILLS BASE | 1347 ft. | | N | N | | SUSSEX | 4616 ft. | | N | N | | NIOBRARA | 6944 ft. | | N | N | | CARLILE | 7290 ft. | | N | N | | GREENHORN | 7355 ft. | | N | N | | BENTONITE | 7554 ft. | | N | N | | D SAND | 7650 ft. | | N | N | | HUNTSMAN | 7663 ft. | | N | N | | J SAND | 7703 ft. | | N | N | | SKULL CREEK | 7757 ft. | | N | N |
Formation JSND Formation Classification: OW Status: PR - 3/1/2025 Interval Top: 7742 ft. Interval Bottom: 7753 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 5/20/1981 | Choke Size: | 0.406 in. | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 10/14/1993 | | Treatment Summary: | SEE SCANNED DOCUMENT # 00417316 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/22/1981 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 5 | | CASING_PRESS | 450 | | GRAVITY_OIL | 42 | | MCF_GAS | 400 | | TUBING_PRESS | 400 |
| | Perforation Data: | | Interval Top: | 7742 ft. | # Of Holes: | 22 | | Interval Bottom: | 7753 ft. | Hole Size: | |
|
Formation DSND Formation Classification: OW Status: PR - 4/1/2024 Interval Top: 7650 ft. Interval Bottom: 7658 ft.| Completed Information for Formation D SAND | | 1st Production Date: | 2/15/1991 | Choke Size: | | | Formation Name: | D SAND | Commingled: | Yes | | Production Method: | PUMPING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 10/14/1993 | | Treatment Summary: | SEE SCANNED DOCUMENT # 00417308 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7701 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/28/1991 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 1 | | BBLS_OIL | 20 | | CALC_GOR | 1700 | | CASING_PRESS | 90 | | GRAVITY_OIL | 40 | | MCF_GAS | 34 | | TUBING_PRESS | 90 |
| | Perforation Data: | | Interval Top: | 7650 ft. | # Of Holes: | 32 | | Interval Bottom: | 7658 ft. | Hole Size: | 0.32 in. |
|
Formation DJSND Formation Classification: OW Status: CM - 12/5/1996| Completed Information for Formation D & J SAND | | 1st Production Date: | 10/14/1993 | Choke Size: | | | Formation Name: | D & J SAND | Commingled: | | | Production Method: | PUMPING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 10/14/1993 | | Treatment Summary: | NONE |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7755 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/14/1993 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 3 | | CALC_GOR | 10000 | | CASING_PRESS | 50 | | MCF_GAS | 30 | | TUBING_PRESS | 50 |
| | No Perforation Data was found for formation DJSND. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 170 |
| Total Gas Produced (MCF) | 708 |
| GOR | 4164 |
| GOR Determination | BOE |
| Average BOE per Day | 0.799 |
| Average MCFE per Day | 4.637 |
| Federal Financial Assurance | i | |
|
|