|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 4/1/2025 Measured TD: 8160 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 4/1/2025 | | Wellbore Permit | | | Permit #: | 19761323 | Expiration Date: | 12/28/1977 | | Proposed Depth/Form: | 8160 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 80, Drill Unit: N2NE |
| | |
| Wellbore Completed | | Completion Date: | 1/14/1977 | | Spud Date: | 1/4/1977 | Spud Date Is: | ACTUAL | | Measured TD: | 8160 ft. | Measured PB depth: | 8121 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | IND, GR, CBL | | Log Types: | IES, FDC W/GR | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 215 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 0 ft., Bottom: 215 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 8155 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: , Bottom: , Determination Method: | | Additional Cement: | String Type: 1ST , Top: 940 ft., Depth: 1646 ft., Bottom: 1650 ft., Sacks: 100, Method: DV TOOL | | Additional Cement: | String Type: 1ST , Top: 440 ft., Depth: 950 ft., Bottom: 950 ft., Sacks: 150, Method: 1 INCH | | Additional Cement: | String Type: 1ST , Top: 150 ft., Depth: 218 ft., Bottom: 340 ft., Sacks: 65, Method: SQUEEZE | | Formation | Interval Top | Log Bottom | Cored | DSTs | | FOX HILLS | 1366 ft. | | | | | NIOBRARA | 7183 ft. | | | | | D SAND | 7925 ft. | | | | | J SAND | 7979 ft. | | | | | SKULL CREEK | 8047 ft. | | | |
Formation JSND Formation Classification: GW Status: PR - 4/1/2025 Interval Top: 7996 ft. Interval Bottom: 8027 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 9/6/1977 | Choke Size: | 0.000 in. | | Formation Name: | J SAND | Commingled: | | | Production Method: | PUMPING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 8/18/1977 | | Treatment Summary: | SEE SCANNED DOCUMENT #00369970 |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 7700 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/17/1977 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 11 | | CALC_GOR | 17455 | | GRAVITY_OIL | 42.3 | | MCF_GAS | 192 |
| | Perforation Data: | | Interval Top: | 7996 ft. | # Of Holes: | 25 | | Interval Bottom: | 8027 ft. | Hole Size: | 0.48 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 5 |
| Total Gas Produced (MCF) | 379 |
| GOR | 75800 |
| GOR Determination | MCFE |
| Average BOE per Day | 0.187 |
| Average MCFE per Day | 1.108 |
| Federal Financial Assurance | i | |
|
|