|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 2/6/2020 Measured TD: 8254 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 2/6/2020 | Wellbore Permit | DRIFTED | Permit #: | 19760059 | Expiration Date: | 5/28/1976 | Proposed Depth/Form: | 8250 ft. | Surface Mineral Owner Same: | Not available | Mineral Owner: | FEE | Surface Owner: | Not available | Unit: | | Unit Number: | | Formation And Spacing: | Code: DJSND , Formation: D & J SAND , Order: , Unit Acreage: 320, Drill Unit: W2 |
| | |
Wellbore Completed | Completion Date: | 2/27/1976 | Spud Date: | 1/29/1976 | Spud Date Is: | ACTUAL | Measured TD: | 8254 ft. | Measured PB depth: | 8214 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | INDUCTION ELECTROLOG, GR | Casing: | String Type: SURF, Hole Size: 11.75 in., Size: 8.625 in., Top: 0 ft., Depth: 210 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 200, Top: 0 ft., Bottom: 210 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8253 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 500, Top: 7710 ft., Bottom: 8253 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 1588 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 350, Top: 950 ft., Bottom: 1588 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 5000 ft. | | | | NIOBRARA | 7308 ft. | | | | D SAND | 8050 ft. | | | | J SAND | 8112 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 2/6/2020 Interval Top: 8110 ft. Interval Bottom: 8150 ft. Completed Information for Formation J SAND | 1st Production Date: | 2/27/1976 | Choke Size: | | Formation Name: | J SAND | Commingled: | | Production Method: | PUMPING | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 2/27/1976 | Treatment Summary: | 1,000 GAL ACID; 80 BALL SEALERS; 141,200# 20/40 SAND; 2,000# 8/12 BEADS; 107,184 GAL K-1 FLUID |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8110 ft. | # Of Holes: | | Interval Bottom: | 8150 ft. | Hole Size: | |
|
Formation DJSND Formation Classification: GW Status: CM - 5/29/1976 Interval Top: 8050 ft. Interval Bottom: 8150 ft. Completed Information for Formation D & J SAND | 1st Production Date: | 2/27/1976 | Choke Size: | 2.000 in. | Formation Name: | D & J SAND | Commingled: | | Production Method: | FLOWING | Open Hole Completion: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 5/29/1976 | Test Method: | PUMPING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
MCF_GAS | 110 |
| Perforation Data: | Interval Top: | 8050 ft. | # Of Holes: | | Interval Bottom: | 8150 ft. | Hole Size: | |
|
Formation DSND Formation Classification: GW Status: AB - 2/6/2020 Interval Top: 8050 ft. Interval Bottom: 8062 ft. Completed Information for Formation D SAND | 1st Production Date: | 2/27/1976 | Choke Size: | | Formation Name: | D SAND | Commingled: | | Production Method: | PUMPING | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 2/27/1976 | Treatment Summary: | 750 GAL ACID; 30,200# 20/40 SAND; 1,000# 8/12 BEADS; 39,690 GAL K-1 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation DSND. |
| Perforation Data: | Interval Top: | 8050 ft. | # Of Holes: | | Interval Bottom: | 8062 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | Y | 02/06/2020 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|