|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 1/1/2020 Measured TD: 8141 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 1/1/2020 | | Wellbore Permit | | | Permit #: | 19750286 | Expiration Date: | 8/17/1975 | | Proposed Depth/Form: | 8127 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 320, Drill Unit: W2 |
| | |
| Wellbore Completed | | Completion Date: | 6/6/1975 | | Spud Date: | 4/16/1975 | Spud Date Is: | ACTUAL | | Measured TD: | 8141 ft. | Measured PB depth: | 8071 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | SP - IES; FDC-GR CALIPER | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 237 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 225, Top: 0 ft., Bottom: , Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 8139 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 0 ft., Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | FOX HILLS BASE | 1313 ft. | | | | | MUDDY J | 7996 ft. | | | |
Formation JSND Formation Classification: GW Status: PR - 1/1/2020 Interval Top: 8000 ft. Interval Bottom: 8031 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 6/15/1975 | Choke Size: | 0.188 in. | | Formation Name: | J SAND | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 6/6/1975 | | Treatment Summary: | 175,980 GALS; 252,000 20/40 SAND; 25,000 10/20 SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/6/1975 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| CASING_PRESS | 800 | | GRAVITY_OIL | 60 | | MCF_GAS | 147 | | TUBING_PRESS | 275 |
| | Perforation Data: | | Interval Top: | 8000 ft. | # Of Holes: | | | Interval Bottom: | 8031 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 218 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.102 |
| Average MCFE per Day | 0.600 |
| Federal Financial Assurance | i | |
|
|