Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 This operator is no longer active in the State of Colorado.
 Surface Location
 API# 05-001-07005
Well Classification: OW Status: PA - 9/6/2019
Well Name/No:NORTH COLORADO BLVD #1 (OWP)
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:ENERGY SEARCH CO ADBA ENERGY SEARCH CO INC - 27635
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date9/6/2019
FacilityID:201602LocationID:319856
County:ADAMS #001Location:SENE 13 1S68W 6
Field:SPINDLE - #77900Elevation:5200 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1980FNL  660 FELLat/Long: 39.966519 / -104.942573Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.966699 / -104.942622Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 9/6/2019             Measured TD: 8240 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 9/6/2019
Wellbore Permit
Permit #:19750251 Expiration Date:8/2/1975
Proposed Depth/Form:8200 ft.
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: NBCSX , Formation: NIOBRARA-CODELL-SUSSEX , Order: , Unit Acreage: 40, Drill Unit: SENE

Wellbore Completed
Completion Date:8/20/1975
Spud Date:4/29/1975Spud Date Is:ACTUAL
Measured TD:8240 ft.Measured PB depth:8210 ft.
True Vertical TD:True Vertical PB depth:
Log Types:IES, DENSITY
Casing:String Type: SURF, Hole Size: , Size: 8.625 in., Top: 0 ft., Depth: 234 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 0 ft., Bottom: 234 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 8230 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 7275 ft., Bottom: 8230 ft., Determination Method: CALC
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 1220 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 275, Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
NIOBRARA7640 ft.
TIMPAS-CODELL8034 ft.

Formation TP-CD                   Formation Classification:  GW                   Status:  CM - 9/30/2008                 Interval Top: 8024 ft.    Interval Bottom: 8070 ft.

 Completed Information for Formation TIMPAS-CODELL
1st Production Date:8/20/1975Choke Size:0.188 in.
Formation Name:TIMPAS-CODELLCommingled:
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:8/20/1975
Treatment Summary:78,600 GAL PLUS 75,000# SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/20/1975Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:VENTED
Test TypeMeasure
BBLS_OIL 55
Perforation Data:
Interval Top:8024 ft.# Of Holes:12
Interval Bottom:8070 ft.Hole Size:

Formation N-T-C                   Formation Classification:  GW                   Status:  AB - 9/6/2019                  Interval Top: 7640 ft.    Interval Bottom: 8070 ft.

 Completed Information for Formation NIOBRARA-TIMPAS-CODELL
1st Production Date:8/20/1975Choke Size:0.188 in.
Formation Name:NIOBRARA-TIMPAS-CODELLCommingled:
Production Method:FLOWING
Open Hole Completion:
Tubing Size:2.375 in.Tubing Setting Depth:7970 ft.
Tubing Packer Depth:7950 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/20/1975Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:VENTED
Test TypeMeasure
BBLS_OIL 165
CASING_PRESS 850
GRAVITY_OIL 41
TUBING_PRESS 300
Perforation Data:
Interval Top:7640 ft.# Of Holes:33
Interval Bottom:8070 ft.Hole Size:

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 9/30/2008                 Interval Top: 7640 ft.    Interval Bottom: 7920 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:8/20/1975Choke Size:0.188 in.
Formation Name:NIOBRARACommingled:
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:8/20/1975
Treatment Summary:86,500 GAL PLUS 100,000# SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/20/1975Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:VENTED
Test TypeMeasure
BBLS_OIL 110
Perforation Data:
Interval Top:7640 ft.# Of Holes:21
Interval Bottom:7920 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY09/06/2019
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No