|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 9/22/1986 Measured TD: 8210 ft. Vertical TD: 0 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 9/22/1986 | | Wellbore Permit | | | Permit #: | 19740423 | Expiration Date: | 6/13/1975 | | Proposed Depth/Form: | 8175 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 0, Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 7/5/1974 | | Spud Date: | 6/11/1974 | Spud Date Is: | ACTUAL | | Measured TD: | 8210 ft. | Measured PB depth: | 7900 ft. | | True Vertical TD: | 0 ft. | True Vertical PB depth: | | | Log Types: | IES - GAMMA RAY - DENSITY | | Casing: | String Type: SURF, Hole Size: , Size: 10.75 in., Top: 0 ft., Depth: 221 ft., Weight: UNK , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 221 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: , Top: 0 ft., Depth: 8209 ft., Weight: 26 , Citings Type: ACTUAL | | Cement: | Sacks: 263, Top: 7300 ft., Bottom: 8209 ft., Determination Method: CALC | | Casing: | String Type: STAGE TOOL, Hole Size: 8.75 in., Size: 8 in., Top: , Depth: 1345 ft., Weight: UNK , Citings Type: ACTUAL | | Cement: | Sacks: 120, Top: 610 ft., Bottom: 1345 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 7334 ft. | | | | | D SAND | 8028 ft. | | | | | J SAND | 8078 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 9/22/1986 Interval Top: 8078 ft. Interval Bottom: 8118 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 7/5/1974 | Choke Size: | 0.281 in. | | Formation Name: | J SAND | Commingled: | | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 7/5/1974 | | Treatment Summary: | SEE DOCUMENT # 320080 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/25/1974 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| CALC_MCF_GAS | 75 | | CASING_PRESS | 375 | | MCF_GAS | 75 | | TUBING_PRESS | 50 |
| | Perforation Data: | | Interval Top: | 8078 ft. | # Of Holes: | | | Interval Bottom: | 8118 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: GW Status: AB - 9/22/1986 Interval Top: 7478 ft. Interval Bottom: 7502 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 8/1/1986 | Choke Size: | 1.000 in. | | Formation Name: | NIOBRARA | Commingled: | | | Production Method: | CASING SWAB | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 7/5/1974 | | Treatment Summary: | SEE DOCUMENT # 320079 |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 7500 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/22/1986 | Test Method: | CASING SWAB | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | VENTED | |
| Test Type | Measure |
|---|
| BBLS_OIL | 10 | | CALC_BBLS_H2O | 120 | | CALC_BBLS_OIL | 2 | | CALC_GOR | 2000 | | CALC_MCF_GAS | 10 | | GRAVITY_OIL | 36 | | MCF_GAS | 20 |
| | Perforation Data: | | Interval Top: | 7478 ft. | # Of Holes: | | | Interval Bottom: | 7502 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 09/22/1986 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|