|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 11/18/2016 Measured TD: 8175 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 11/18/2016 | | Wellbore Permit | | | Permit #: | 19740174 | Expiration Date: | 3/20/1975 | | Proposed Depth/Form: | 8150 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 320, Drill Unit: E/2 |
| | |
| Wellbore Completed | | Completion Date: | 5/15/1974 | | Spud Date: | 3/23/1974 | Spud Date Is: | ACTUAL | | Measured TD: | 8175 ft. | Measured PB depth: | | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | IES - GAMMA RAY - DENSILOG | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 211 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 160, Top: 0 ft., Bottom: 211 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8174 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 150, Top: 6700 ft., Bottom: 8174 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 1340 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 350, Top: 350 ft., Bottom: 1340 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | D SAND | 7962 ft. | | | | | J SAND | 8016 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 11/18/2016 Interval Top: 8018 ft. Interval Bottom: 8058 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 5/15/1974 | Choke Size: | | | Formation Name: | J SAND | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 8/23/2002 | | Treatment Summary: | FRAC W/ 44500 GAL EMULSIFRAC W/ 15000# MESH SD, 50000# 20-40 SD, 2000' 8-12 GLASS BEADS | | Formation Treatment | | Treatment Date: | 5/15/1974 | | Treatment Summary: | SEE DOCUMENT # 320048 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8090 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/15/1974 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 8 | | CALC_BBLS_OIL | 8 | | CALC_GOR | 35265 | | CALC_MCF_GAS | 285 | | CASING_PRESS | 6000 | | GRAVITY_OIL | 66 | | MCF_GAS | 285 | | TUBING_PRESS | 240 |
| | Perforation Data: | | Interval Top: | 8018 ft. | # Of Holes: | 64 | | Interval Bottom: | 8058 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 11/18/2016 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|