|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 3/1/2023 Measured TD: 7266 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 3/1/2023 | | Wellbore Permit | | | Permit #: | 19720392 | Expiration Date: | 5/31/1973 | | Proposed Depth/Form: | 7300 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | |
| | |
| Wellbore Completed | | Completion Date: | 6/9/1972 | | Spud Date: | 5/28/1972 | Spud Date Is: | ACTUAL | | Measured TD: | 7266 ft. | Measured PB depth: | | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | IND (6/6/1972); DENS-GR (6/6/1972); CBL (4/21/2003) | | Log Types: | SCHLUMBERGER IES | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 181 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 150, Top: 0 ft., Bottom: 181 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7263 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 6644 ft., Bottom: 7263 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 1040 ft., Depth: 1148 ft., Bottom: 1155 ft., Sacks: 400, Method: SQUEEZE | | Additional Cement: | String Type: 1ST , Top: 1467 ft., Depth: 2367 ft., Bottom: 2380 ft., Sacks: 200, Method: SQUEEZE | | Additional Cement: | String Type: S.C. 1.1 , Top: 435 ft., Depth: 878 ft., Bottom: 920 ft., Sacks: 120, Method: DV TOOL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 6266 ft. | | N | | | FORT HAYS | 6648 ft. | | N | | | CARLILE | 6684 ft. | | N | | | GREENHORN | 6742 ft. | | N | | | BENTONITE | 6962 ft. | | N | | | D SAND | 7052 ft. | | N | Y | | J SAND | 7120 ft. | | N | Y |
Formation JSND Formation Classification: OG Status: SI - 3/1/2023 Interval Top: 7145 ft. Interval Bottom: 7151 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 6/27/1972 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/10/2010 | | Treatment Summary: | Fracture stimulate J Sand perforations from 7145'-7151' down 2 7/8" frac string with 1113 barrels cross linked gelled water at average of 17 BPM and 5000 psi. ISIP-2710 psi. 5 min-2136 psi. 10 min-1799 psi. 15 min-1483 psi. Strong vacuum with IFL at 5300' next morning. | | Formation Treatment | | Treatment Date: | 7/22/1973 | | Treatment Summary: | SEE SCANNED DOCUMENT # 00338942 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 225 | | CALC_GOR | 800 | | CASING_PRESS | 650 | | GRAVITY_OIL | 39.6 | | MCF_GAS | 180 | | TUBING_PRESS | 275 |
| | Perforation Data: | | Interval Top: | 7145 ft. | # Of Holes: | 24 | | Interval Bottom: | 7151 ft. | Hole Size: | 0.5 in. |
|
Formation DSND Formation Classification: OW Status: SI - 3/1/2023 Interval Top: 7054 ft. Interval Bottom: 7091 ft.| Completed Information for Formation D SAND | | 1st Production Date: | 7/27/1973 | Choke Size: | | | Formation Name: | D SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/17/2010 | | Treatment Summary: | Fracture stimulate D Sand perforations 7054'-7091' with 1344 barrels cross linked gelled 5% KCl water containing 113,900# 20/40 sand and 12,000# 16/30 interprop down 2 7/8" frac string at an average of 20 BPM and 6400 psi. Annulus was filled but no pressure was held. ISIP-3000 psi, 5 min-2780 psi, 10 min-2540 psi, 15 min-2060 psi, 20 min-1780 psi, 25 min-1590 psi, 30 min-1460 psi. Well on vacuum in 2 hours. | | Formation Treatment | | Treatment Date: | 7/22/1973 | | Treatment Summary: | SEE SCANNED DOCUMENT # 00338941 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 287 | | CALC_GOR | 1226 | | CASING_PRESS | 820 | | GRAVITY_OIL | 40 | | MCF_GAS | 342 | | TUBING_PRESS | 320 |
| | Perforation Data: | | Interval Top: | 7054 ft. | # Of Holes: | 84 | | Interval Bottom: | 7091 ft. | Hole Size: | 0.5 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | Y | Noticed Date 11/25/2025 |
| Defined Inactive (SI ) | Y | Defined Inactive 02/28/2023 |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|