|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 3/1/2023 Measured TD: 7292 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 3/1/2023 | | Wellbore Permit | | | Permit #: | 19720232 | Expiration Date: | 4/3/1973 | | Proposed Depth/Form: | 7275 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | |
| | |
| Wellbore Completed | | Completion Date: | 4/19/1972 | | Spud Date: | 4/9/1972 | Spud Date Is: | ACTUAL | | Measured TD: | 7292 ft. | Measured PB depth: | | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | | | Log Types: | CBL (7/21/2009) | | Log Types: | IES & FDC | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 126 ft., Weight: 20 , Citings Type: ACTUAL | | Cement: | Sacks: 150, Top: 0 ft., Bottom: 126 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 7280 ft., Weight: 17/15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 150, Top: 6586 ft., Bottom: 7280 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 626 ft., Depth: 1032 ft., Bottom: 1045 ft., Sacks: 120, Method: DV TOOL | | Additional Cement: | String Type: 1ST , Top: 1645 ft., Depth: 2150 ft., Bottom: 1800 ft., Sacks: 235, Method: RETAINER | | Additional Cement: | String Type: 1ST , Top: 2500 ft., Depth: 2508 ft., Bottom: 2508 ft., Sacks: 125, Method: SQUEEZE | | Additional Cement: | String Type: 1ST , Top: 145 ft., Depth: 200 ft., Bottom: 155 ft., Sacks: 65, Method: SQUEEZE | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 6276 ft. | | N | N | | FORT HAYS | 6662 ft. | | N | N | | CARLILE | 6699 ft. | | N | N | | GREENHORN | 6760 ft. | | N | N | | BENTONITE | 6982 ft. | | N | N | | D SAND | 7076 ft. | | N | N | | J SAND | 7138 ft. | | N | N |
Formation JSND Formation Classification: OG Status: SI - 3/1/2023 Interval Top: 7141 ft. Interval Bottom: 7178 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 7/28/1973 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/24/1973 | | Treatment Summary: | Fracture stimulate J1 perforations from 7141'-7145' down 2-7/8" tubing with packer at 7116' with 176 barrels containing 2600# 20/40 sand at 6 BPM and 4500 psi.
Job screened out with only 1780# 20/40 sand in formation. Released packer and reversed out sand. | | Formation Treatment | | Treatment Date: | 5/16/1972 | | Treatment Summary: | SEE SCANNED DOCUMENT # 00338879 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7141 ft. | # Of Holes: | 20 | | Interval Bottom: | 7178 ft. | Hole Size: | 0.5 in. |
|
Formation DJSND Formation Classification: OW Status: CM - 4/11/2023 Interval Top: 7076 ft. Interval Bottom: 7178 ft.| Completed Information for Formation D & J SAND | | 1st Production Date: | 7/28/1973 | Choke Size: | | | Formation Name: | D & J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/15/1986 | | Treatment Summary: | Well was refractured utilizing 695 barrels lease oil containing 20,000# 20/40 sand down casing at 25 BPM and 2800 psi. ISIP-2450 psi. 5 min-1800 psi, 10 min-1350 psi. 15 min-750 psi. The D Sand, Upper J Sand and Lower J Sand perforations were all open during the frac. Normally in the area the J Sand has a lower frac gradient than the D Sand. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation DJSND. |
| | Perforation Data: | | Interval Top: | 7076 ft. | # Of Holes: | 215 | | Interval Bottom: | 7178 ft. | Hole Size: | |
|
Formation DSND Formation Classification: OW Status: SI - 3/1/2023 Interval Top: 7076 ft. Interval Bottom: 7110 ft.| Completed Information for Formation D SAND | | 1st Production Date: | 5/16/1972 | Choke Size: | | | Formation Name: | D SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/24/2009 | | Treatment Summary: | Fracture stimulate D Sand perforation from 7076'-7079' & 7090'-7110' with 1007 barrels 5% KCl crosslinked gelled water containing 62,900# 20/40 sand and 9,600# 16/30 Versaprop down 2 7/8" tubing with packer at 21 BPM at average of 5200 psi while holding an average of 600 psi on the annulus. ISIP-3220 psi. 5 min-2606 psi. 10 min-2150 psi. 15 min-1647 psi. 30 min-766 psi. Vacuum in 42 minutes. | | Formation Treatment | | Treatment Date: | 5/16/1972 | | Treatment Summary: | SEE SCANNED DOCUMENT # 00338879 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 275 | | CALC_GOR | 400 | | CASING_PRESS | 25 | | GRAVITY_OIL | 40 | | MCF_GAS | 110 | | TUBING_PRESS | 25 |
| | Perforation Data: | | Interval Top: | 7076 ft. | # Of Holes: | 118 | | Interval Bottom: | 7110 ft. | Hole Size: | 0.5 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | Y | Noticed Date 11/25/2025 |
| Defined Inactive (SI ) | Y | Defined Inactive 02/28/2023 |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|