|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 9/1/2024 Measured TD: 8035 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 9/1/2024 | | Wellbore Permit | | | Permit #: | 19710802 | Expiration Date: | 2/18/1972 | | Proposed Depth/Form: | 8035 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | STATE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: DSND , Formation: D SAND , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 11/18/1971 | | Spud Date: | 10/19/1971 | Spud Date Is: | ACTUAL | | Measured TD: | 8035 ft. | Measured PB depth: | 7996 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | INDUCTION ELECTROLOG COMPENSATED DENSILOG | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 328 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 0 ft., Bottom: , Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 8034 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 0 ft., Bottom: , Determination Method: | | Casing: | String Type: 2ND LINER, Hole Size: , Size: , Top: , Depth: 1520 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 600, Top: , Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 7142 ft. | | | | | FORT HAYS | 7481 ft. | | | | | GREENHORN | 7566 ft. | | | | | GRANEROS | 7634 ft. | | | | | BENTONITE | 7783 ft. | | | | | D SAND | 7885 ft. | | | | | J SAND | 7948 ft. | | | Y | | SKULL CREEK | 8000 ft. | | | |
Formation DSND Formation Classification: OW Status: PR - 1/1/2025 Interval Top: 7886 ft. Interval Bottom: 7900 ft.| Completed Information for Formation D SAND | | 1st Production Date: | 11/18/1971 | Choke Size: | | | Formation Name: | D SAND | Commingled: | | | Production Method: | PUMPING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 11/18/1971 | | Treatment Summary: | 250 GALS 7.5% HCL; 29,000 GALS GELLED D SAND CRUDE; 6,250# 20/40 SAND; 6,250# 10/20 SAND; 2,000# 8/12 BEADS |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 7939 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/19/1971 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | VENTED | |
| Test Type | Measure |
|---|
| BBLS_OIL | 120 | | CALC_GOR | 470 | | GRAVITY_OIL | 40.2 | | MCF_GAS | 56.4 |
| | Perforation Data: | | Interval Top: | 7886 ft. | # Of Holes: | | | Interval Bottom: | 7900 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 37 |
| Total Gas Produced (MCF) | 133 |
| GOR | 3594 |
| GOR Determination | BOE |
| Average BOE per Day | 0.170 |
| Average MCFE per Day | 0.967 |
| Federal Financial Assurance | i | |
|
|