|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 3/1/2023 Measured TD: 8070 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 3/1/2023 | | Wellbore Permit | | | Permit #: | 19710714 | Expiration Date: | 1/20/1972 | | Proposed Depth/Form: | 8185 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | STATE | Surface Owner: | Not available | | Unit: | | Unit Number: | |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Spud Date: | 9/24/1971 | Spud Date Is: | ACTUAL | | Measured TD: | 8070 ft. | Measured PB depth: | 8066 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | IES, FDC-GR | | Log Types: | IND, DEN, CBL | | Log Types: | | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 359 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 0 ft., Bottom: 359 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 8068 ft., Weight: 14-17 , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 7325 ft., Bottom: 8068 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 1508 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 285 ft., Bottom: 1520 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 280 ft., Depth: 423 ft., Bottom: 423 ft., Sacks: 75, Method: 1 INCH | | Additional Cement: | String Type: 1ST , Top: 6985 ft., Depth: 7305 ft., Bottom: 7310 ft., Sacks: 150, Method: SQUEEZE | | Additional Cement: | String Type: 1ST , Top: , Depth: 1640 ft., Bottom: , Sacks: 50, Method: SQUEEZE | | Additional Cement: | String Type: 1ST , Top: , Depth: 1640 ft., Bottom: , Sacks: 40, Method: SQUEEZE | | Formation | Interval Top | Log Bottom | Cored | DSTs | | FOX HILLS | 1226 ft. | | | | | PIERRE | 1468 ft. | | | | | NIOBRARA | 7130 ft. | | | | | FORT HAYS | 7520 ft. | | | | | CARLILE | 7549 ft. | | | | | GREENHORN | 7624 ft. | | | | | GRANEROS | 7672 ft. | | | | | BENTONITE | 7822 ft. | | | | | X BENTONITE | 7822 ft. | | | | | D SAND | 7924 ft. | | | | | J SAND | 7979 ft. | | | |
Formation JSND Formation Classification: OW Status: SI - 12/1/2018 Interval Top: 7984 ft. Interval Bottom: 8020 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 7/23/1992 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 11/9/2018 | Treatment End Date: | N/A | | Treatment Summary: | J Sand perforations of 7984'-7992' & 8014'-8020' (4JSFP) were added. No stimulation of new J Sand perforations was performed. D Sand was also reperforated from 7927'-7937' with 4JSPF. No additional stimulation of the D Sand was performed. | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7984 ft. | # Of Holes: | 58 | | Interval Bottom: | 8020 ft. | Hole Size: | 0.28 in. |
|
Formation DSND Formation Classification: OW Status: SI - 3/1/2023 Interval Top: 7924 ft. Interval Bottom: 7938 ft.| Completed Information for Formation D SAND | | 1st Production Date: | 10/14/1971 | Choke Size: | 0.500 in. | | Formation Name: | D SAND | Commingled: | | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 10/14/1971 | | Treatment Summary: | 24,000 GAL LEASE CRUDE; 20/40 SAND 5,000#; 10/20 SAND 5,000#; 8/12 BEADS 2,000#; HCL 7.5% 500 GALS |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 7896 ft. | | Tubing Packer Depth: | 7896 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/15/1971 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | VENTED | |
| Test Type | Measure |
|---|
| BBLS_OIL | 257 | | CALC_GOR | 817 | | GRAVITY_OIL | 38.1 | | MCF_GAS | 210 | | TUBING_PRESS | 80 |
| | Perforation Data: | | Interval Top: | 7924 ft. | # Of Holes: | | | Interval Bottom: | 7938 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI ) | Y | Defined Inactive 02/28/2023 |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|