BEFORE THE OIL AND GAS CONSERVATION COMMISSION
OF THE STATE OF COLORADO

 

IN THE MATTER OF THE PROMULGATION AND ESTABLISHMENT OF FIELD RULES TO GOVERN OPERATIONS FOR THE NIOBRARA AND CODELL FORMATIONS, WATTENBERG FIELD, WELD COUNTY, COLORADO

)

)

)

)

)

)

)

CAUSE NO. 407

 

DOCKET NO. 191000619

 

TYPE: SPACING

 

ORDER NO. 407-2974

 

REPORT OF THE COMMISSION

 

The Commission heard this matter on November 20, 2019, at the University of Northern Colorado, University Center Ball Room, 2101 10th Avenue, Greeley, Colorado, upon application for an order to establish an approximate 1,280-acre drilling and spacing unit for the below-described lands (“Application Lands”) and approve up to 13 horizontal wells within the unit, for production from the Niobrara and Codell Formations, with the productive interval of any wellbore to be located no closer than 460 feet from the north and south unit boundaries, 150 feet from the east and west unit boundaries, and no closer than 150 feet from the productive interval of any other wellbore within the unit, unless the Director grants an exception:

 

Township 7 North, Range 65 West, 6th P.M.

Section 27:  All

Section 28:  All  

 

FINDINGS

 

The Commission finds as follows:

 

1.               PDC Energy, Inc. (Operator No. 69175) (“PDC” or “Applicant”), as applicant herein, is an interested party in the subject matter of the above-referenced hearing.

 

2.               Due notice of the time, place and purpose of the hearing has been given in all respects as required by law.

 

3.               The Commission has jurisdiction over the subject matter embraced in said Notice, and of the parties interested therein, and jurisdiction to promulgate the hereinafter prescribed order pursuant to the Oil and Gas Conservation Act.

 

4.               Pursuant to § 34-60-106(2.5)(a), C.R.S., the Commission shall regulate oil and gas operations in a reasonable manner to protect and minimize adverse impacts to public health, safety, and welfare, the environment, and wildlife resources, and shall protect against adverse environmental impacts on any air, water, soil, or biological resource resulting from oil and gas operations.

 

5.               On April 27, 1998, the Commission adopted Rule 318A, the Greater Wattenberg Area Special Well Location, Spacing and Unit Designation Rule. The Application Lands are subject to Rule 318A.

 

6.               On July 30, 2019, PDC, by its attorneys, filed with the Commission a verified application (“Application”) pursuant to § 34-60-116, C.R.S., for an order to establish an approximate 1,280-acre drilling and spacing unit for the Application Lands and approve up to 13 horizontal wells within the unit, for production from the Niobrara and Codell Formations, with the productive interval of any wellbore to be located no closer than 460 feet from the north and south unit boundaries, 150 feet from the east and west unit boundaries, and no closer than 150 feet from the productive interval of any other wellbore within the unit, unless the Director grants an exception.

 

7.               Applicant states that all horizontal wells will be drilled from no more than two multi-well pads within the drilling unit, or on adjacent lands with consent of the landowner, subject to Rule 318A, unless an exception is granted by the Director. Applicant further states that all permitted wells will be drilled in an east-west or west-east orientation.

 

8.               PDC filed with the Commission a written request to approve the Application based on the merits of the verified Application and on supporting exhibits. Sworn written testimony and exhibits were submitted in support of the Application.   

 

9.               Land testimony and exhibits submitted in support of the Application by Katherine Wilson, Regional Landman for PDC, show that PDC holds oil and gas interests and has a right to drill in the Application Lands.

 

10.            Geologic testimony and exhibits submitted in support of the Application by Nathan Marolf, Development Geologist for PDC, show that the Niobrara Formation is present throughout the Application Lands, is approximately 300 to 325 feet thick, and is generally of uniform thickness throughout the Application Lands. The geologic testimony shows that the Niobrara Formation is comprised of chalks, marlstones, and limestone. In addition, the geologic testimony shows that the Codell Formation is present throughout the Application Lands, is approximately 17 to 18 feet thick, and is generally of uniform thickness throughout the Application Lands. The geologic testimony shows that the Codell Formation is comprised of fine-grained marine interbedded clay and sand deposits.

 

11.            Engineering testimony and exhibits submitted in support of the Application by Jon Yetkin, Reservoir Engineer for PDC, indicate that the Applicant will drill up to 13 horizontal wells, with no more than eight horizontal wells in the Codell Formation. Engineering testimony also shows that the estimated drainage area for a Niobrara Formation well with a lateral length of 10,260 feet is 76 acres. Accordingly, an approximate 1,280-acre drilling and spacing unit is not less than the maximum area that can be efficiently, economically, and effectively drained by 13 horizontal wells producing oil, gas, and associated hydrocarbons from the Niobrara Formation. Engineering testimony also shows that the estimated drainage area for a Codell Formation well with a lateral length of 10,260 feet is 155 acres. Accordingly, an approximate 1,280-acre drilling and spacing unit is not less than the maximum area that can be efficiently, economically, and effectively drained by no more than eight horizontal wells producing oil, gas, and associated hydrocarbons from the Codell Formation.

 

12.            Engineering testimony also shows that, based on microseismic data, hydraulic fracture growth does not extend past the heel and toe of the wellbores. Therefore, the proposed setbacks of 150 feet from the east and west unit boundaries are appropriate given an east-west or west-east wellbore orientation.

 

13.            Regulatory testimony submitted in support of the Application by Venessa Chase, Regulatory Supervisor for PDC, show that Weld County is the local governmental agency with siting authority for the Application Lands. Weld County has waived its right to render a disposition regarding its surface permitting prior to the Commission’s approval of the proposed drilling and spacing unit. The testimony further demonstrates that in developing the Application Lands, PDC’s operations will reasonably protect and minimize adverse impacts to public health, safety, and welfare, the environment, and wildlife resources and will protect against adverse environmental impacts on any air, water, soil, or biological resources.

 

14.            The above-referenced testimony and exhibits show that granting the Application will regulate oil and gas operations in a reasonable manner to protect and minimize adverse impacts to public health, safety, and welfare, the environment, and wildlife resources and will protect against adverse environmental impacts on any air, water, soil, or biological resource resulting from oil and gas operations.

 

15.            The above-referenced testimony and exhibits further show that granting the Application will allow more efficient reservoir drainage, will prevent waste, will assure a greater ultimate recovery of hydrocarbons, and will not violate correlative rights. 

 

16.            PDC agreed to be bound by oral order of the Commission. 

 

17.            Based on the facts stated in the verified Application, no protests having been filed, and based on the Hearing Officer review of the Application under Rule 511, the Commission should enter an order to establish an approximate 1,280-acre drilling and spacing unit for the Application Lands and approve up to 13 horizontal wells within the unit, for production from the Niobrara and Codell Formations, with the productive interval of any wellbore to be located no closer than 460 feet from the north and south unit boundaries, 150 feet from the east and west unit boundaries, and no closer than 150 feet from the productive interval of any other wellbore within the unit, unless the Director grants an exception.

 

ORDER

           

IT IS HEREBY ORDERED:

 

1.         An approximate 1,280-acre drilling and spacing unit for the Application Lands is hereby established, and up to 13 horizontal wells within the unit are approved for production from the Niobrara and Codell Formations, pursuant to the findings above.

 

2.         The productive interval of any wellbore will be located no closer than 460 feet from the north and south unit boundaries, 150 feet from the east and west unit boundaries, and no closer than 150 feet from the productive interval of any other wellbore within the unit, unless the Director grants an exception.

 

3.         All horizontal wells in the unit will be drilled in an east-west or west-east orientation.

 

4.         All wells permitted under this Order will be drilled from no more than two multi-well pads within the Application Lands, or on adjacent lands with consent of the landowner, subject to Rule 318A, unless the Director grants an exception.

 

5.         No oil and gas operations may be conducted in the Application Lands without an approved Oil and Gas Location Assessment permit(s) (Form 2A) and approved Applications for Permits to Drill (Form 2). The determination of whether an oil and gas location satisfies § 34-60-106(2.5)(a), C.R.S. shall be made by Commission permitting staff in the course of its review and determination of the Form 2A. The Commission’s approval of this drilling and spacing unit does not equate to approval of any proposed Form 2A for an oil and gas location or Form 2.

 

IT IS FURTHER ORDERED:

 

1.         The provisions contained in the above order shall become effective immediately.

 

2.         The Commission expressly reserves its right, after notice and hearing, to alter, amend or repeal any and/or all of the above orders.

 

3.         Under the State Administrative Procedure Act the Commission considers this Order to be final agency action for purposes of judicial review within 35 days after the date this Order is mailed by the Commission.

 

4.         An application for reconsideration by the Commission of this Order is not required prior to the filing for judicial review.

 

ENTERED this 22nd day of November, 2019, as of November 20, 2019.   

 

OIL AND GAS CONSERVATION COMMISSION

OF THE STATE OF COLORADO

 

 

By___________________________________           

                 Mimi C. Larsen, Secretary