BEFORE
THE OIL AND GAS CONSERVATION COMMISSION
OF THE STATE OF COLORADO
|
IN THE MATTER OF THE PROMULGATION AND ESTABLISHMENT OF FIELD RULES TO GOVERN OPERATIONS FOR THE Codell FORMATION, WATTENBERG FIELD, WELD COUNTY, COLORADO |
) ) ) ) ) ) ) |
CAUSE NO. 407
DOCKET NO. 190400328
TYPE: POOLING
ORDER NO. 407-2886 |
REPORT OF THE COMMISSION
The Commission heard this matter on July 31, 2019, at the University of Colorado, School of Public Affairs, 1380 Lawrence Street, Second Floor Terrace Room, Denver, Colorado, upon application for an order to pool all interests in an approximate 360-acre designated horizontal wellbore spacing unit established for the below-described lands (“Application Lands”), for the drilling of the Buddy 7-14HZ Well (API No. 05-123-48445) (“Well”) for the development and operation of the Codell Formation:
Township 1 North, Range 67 West, 6th P.M.
Section 6: E½E½
Section 7: NE¼NE¼
Township 2 North, Range 67 West, 6th P.M.
Section 31: E½E½
FINDINGS
The Commission finds as follows:
ORDER
IT IS HEREBY ORDERED:
1. Pursuant to the provisions of §34-60-116, C.R.S., all interests in the designated horizontal wellbore spacing unit established for the Application Lands are hereby pooled, for the development and operation of the Codell Formation, effective as the date the Application was filed.
2. The production obtained from the designated horizontal wellbore spacing unit shall be allocated to each owner in the unit on the basis of the proportion that the number of acres in such tract bears to the total number of mineral acres within the designated horizontal wellbore spacing unit; each owner of an interest in the designated horizontal wellbore spacing unit shall be entitled to receive the owner’s share of the production of the Well located on the designated horizontal wellbore spacing unit applicable to owner’s interest in the designated horizontal wellbore spacing unit.
3. A nonconsenting owner is immune from liability for costs arising from spills, releases, damage, or injury resulting from oil and gas operations on the designated horizontal wellbore spacing unit.
4. The operator shall not use the surface owned by a nonconsenting owner without the nonconsenting owner’s permission.
5. Nothing in this order is intended to conflict with §34-60-116, C.R.S. Any conflict that may arise shall be resolved in favor of the statute.
6. The designated horizontal wellbore spacing unit described above shall be considered a drilling and spacing unit established by the Commission for purposes of Rule 530.a.
IT IS FURTHER ORDERED:
1. The provisions contained in the above order shall become effective immediately.
2. The Commission expressly reserves its right, after notice and hearing, to alter, amend or repeal any and/or all of the above orders.
3. Under the State Administrative Procedure Act, the Commission considers this Order to be final agency action for purposes of judicial review within 35 days after the date this Order is mailed by the Commission.
4. An application for reconsideration by the Commission of this Order is not required prior to the filing for judicial review.
ENTERED this 6th day of August, 2019, as of July 31, 2019
OIL AND GAS CONSERVATION COMMISSION
OF THE STATE OF COLORADO
By____________________________________
Mimi C. Larsen, Secretary